01.07.2013 Views

XXIX ESC General Assembly, Sept. 12-17, 2004 - GFZ

XXIX ESC General Assembly, Sept. 12-17, 2004 - GFZ

XXIX ESC General Assembly, Sept. 12-17, 2004 - GFZ

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1914-28 Only the astatic horizontal<br />

<strong>12</strong>00 kg WIECHERT pendulum<br />

and occasionally also the 80 kg<br />

vertical WIECHERT pendulum<br />

are operated at station POT.<br />

WIECHERT response, N-comp. →<br />

1929-54 Besides the <strong>12</strong>00 kg WIECHERT<br />

also a vertical component<br />

GALITZYN-WILIP seismograph<br />

is operated at station POT →<br />

No seismological reasearch at station POT<br />

or the GIP until the foundation of CIPE in<br />

1969.<br />

Peter Bormann <strong>XXIX</strong> <strong>ESC</strong> <strong>General</strong> <strong>Assembly</strong>, <strong>Sept</strong>. <strong>12</strong>-<strong>17</strong>, <strong>2004</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!