The Distillery <strong>Redevelopment</strong> | East Second Street | South <strong>Boston</strong><br />
renewable fuel, and energy efficient shell and floor slabs. O<strong>the</strong>r techniques,<br />
passive solar heat gain, heliostats, daylighting, natural venting and heat recovery<br />
venting are included in our design, but play a lesser role in <strong>the</strong> energy<br />
performance. Integration of electrical cogeneration, plug-in hybrid vehicles and<br />
o<strong>the</strong>r innovative transportation initiatives also contribute to benchmark setting<br />
reductions in <strong>the</strong> total energy and environmental impact of <strong>the</strong> site.<br />
The conceptualization of <strong>the</strong> energy profile of <strong>the</strong> project was facilitated by a<br />
grant from <strong>the</strong> Massachusetts Technology Collaborative. The report, The<br />
Feasibility Study of Renewable Energy and Energy Efficiency Options for a 79unit<br />
Condominium Development in South <strong>Boston</strong> (May 2005), is available from<br />
<strong>the</strong> MTC or from <strong>the</strong> developer. This study defined <strong>the</strong> building’s energy<br />
efficient building morphology, and did a broad survey of <strong>the</strong> energy efficiency<br />
technologies which <strong>the</strong> project will implement. A second grant from MTC for<br />
$40,000, A Feasibility study for Vegetable Oil CHP, was awarded in October,<br />
2006, and is focused more specifically on establishing <strong>the</strong> feasibility of using<br />
virgin vegetable oil as an energy source for a combined heat and power system.<br />
Work under this grant commenced on Dec. 13 th , and should be completed May 1,<br />
2007.<br />
1.4 Construction<br />
In addition to complying with <strong>the</strong> pertinent regulations, it is an objective of <strong>the</strong><br />
proponent to incorporate into <strong>the</strong> construction process healthful and<br />
environmentally responsible principles insofar as this is practicable. In order to<br />
maintain as much normal use of <strong>the</strong> property as possible, <strong>the</strong> construction will be<br />
sequenced so that <strong>the</strong> vacant north sector of <strong>the</strong> lot will be developed first – <strong>the</strong><br />
live-work studios facing East First Street – to be followed by <strong>the</strong> development of<br />
<strong>the</strong> residential units on Dorchester Street.<br />