The Distillery <strong>Redevelopment</strong> | East Second Street | South <strong>Boston</strong><br />

and First Street with a short spur adjacent to East Second Street. The upper level<br />

parking has a small truck loading area to serve <strong>the</strong> retail store on East Second<br />

Street. On H Street <strong>the</strong>re is a large truck loading dock that can serve all buildings<br />

in <strong>the</strong> development, existing and proposed.<br />

2.3 Construction Sequencing<br />

In order to maintain revenue while construction proceeds <strong>the</strong> proposed sequencing<br />

of <strong>the</strong> work will be split into two phases. Phase 1 will be built on largely vacant<br />

land demolishing only <strong>the</strong> Cooper Shop, leaving <strong>the</strong> Honeywell Building in place.<br />

Phase 1 will be completed and occupied as construction proceeds into Phase 2,<br />

entailing <strong>the</strong> demolition of <strong>the</strong> Honeywell Building to make way for <strong>the</strong><br />

residential units on Dorchester Street. This is illustrated in Figures 2-3 and 2-4.1,<br />

2.4.2, and 2.4.3 below.<br />

PHASE 2<br />

Figure 2-3: Construction Sequencing<br />

PHASE 1<br />

2.0 Program 2-4