UltiMate 3000 SRD-3x00 Solvent Racks - Dionex
UltiMate 3000 SRD-3x00 Solvent Racks - Dionex
UltiMate 3000 SRD-3x00 Solvent Racks - Dionex
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>UltiMate</strong> <strong>3000</strong> Series:<br />
<strong>SRD</strong>-<strong>3x00</strong> <strong>Solvent</strong> <strong>Racks</strong><br />
5.5 Shut Down<br />
Observe the following precautions before interrupting the operation or before shipping the<br />
<strong>SRD</strong>:<br />
• Thoroughly rinse the degasser with methanol or isopropanol after operation.<br />
• For longer periods of inactivity and when using saliferous buffers (which may result in<br />
salt crystallization in the gas separation membrane, thereby impairing the degassing<br />
performance), rinse with de-ionized water followed by either methanol or isopropanol.<br />
• Ship the <strong>SRD</strong> only in the original shipping container and observe the packing<br />
instructions.<br />
If the original shipping container is not available, appropriate shipping containers and<br />
packing material can be ordered from Thermo Fisher Scientific sales organization for<br />
<strong>Dionex</strong> HPLC products. The packing instructions are included in the "Installation and<br />
Qualification Documents for Chromatography Instruments" binder and are available on<br />
request.<br />
Shipping the module in any other packaging automatically voids the warranty. For more<br />
information, see the warranty statement in the terms of sale.<br />
When the <strong>SRD</strong> is connected to the pump of the <strong>UltiMate</strong> <strong>3000</strong> system and when you are<br />
running Chromeleon, you can set the pump with the <strong>SRD</strong> and HPLC system into the<br />
standby mode or automate system shutdown. (For more information, see the Pump and/or<br />
NCS/NCP manuals and the Chromeleon Help.)<br />
Page 32 Operating Instructions