2 Hira Nagar-<br />
Bishnah D/c<br />
Line(44.33 Kms.)<br />
136 tower<br />
3 Barn-Bishnah<br />
D/c line<br />
(37.47 Kms.)<br />
114 towers<br />
4 LILO <strong>of</strong><br />
Kishenpur-<br />
Pampore D/c line<br />
at Ramban<br />
(2 Kms.)<br />
6 towers<br />
5 Stringing <strong>of</strong><br />
conductor on 2 nd<br />
ckt Thein-<br />
HiraNagar Line<br />
(40.4 Kms.)<br />
6 Miran Sahib-<br />
Bishnah D/c line<br />
(9.73 Kms.)<br />
28 towers<br />
1 LILO <strong>of</strong> Gladni-<br />
Hiranagar<br />
D/c line at Bari-<br />
Brahmana-II<br />
(2.7 Kms.)<br />
11 towers<br />
2004 2491.20 2007-08 2010-11 N Y<br />
2004 2192.80 2007-08 2010-11 N Y<br />
2954.723 1266.10 232.895 3187.618 Foundation <strong>of</strong> 158 towers<br />
laid and 130 no. tower<br />
erected and stringing <strong>of</strong><br />
41.997 km completed.<br />
Executing Agency: M/s<br />
KEC<br />
2004 140.80 2009-10 - N N 138.792 2.01 1.76 140.552 Foundation <strong>of</strong> 3 nos. tower<br />
completed and 3 nos. tower<br />
erected.<br />
Executing Agency: PDD,<br />
J&K<br />
2004 528.20 2008-09 2009-10 N Y 528.156 0 0 528.156 Stringing <strong>of</strong> conductor<br />
Completed.<br />
Executing Agency: PDD,<br />
J&K<br />
2004 567.9 2009-10 - N N 314.961 252.94 34.719 349.68 29 Nos. tower foundations<br />
laid, 28 Nos. towers<br />
erected and 66% <strong>of</strong><br />
stringing completed.<br />
Executing Agency: M/s<br />
KEC<br />
132kV Transmission Lines<br />
2004 159.20 2007-08 - N Y 133.471 8.67 0 133.471 Line has been<br />
commissioned in<br />
December, 2007.<br />
Executing Agency: PDD,<br />
J&K<br />
13