Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Prime Minister's Reconstruction Plan - Ministry of Home Affairs
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.<br />
No<br />
Con<br />
trac<br />
t Sl.<br />
No.<br />
Sub-project Region Sector District Scope Cost (Rs.<br />
in crore)<br />
Present Status<br />
Physical (<br />
cumulative as<br />
on date )<br />
Financial (<br />
cumulative<br />
as on date )<br />
12 12 Bijbehara Langanbal Kashmir Transport Anantnag 29 Kms 39.57 89.1% 84.2%<br />
Road<br />
Roads<br />
13 13 Wanpoh-Chawalgam- Kashmir Transport Kulgam 38 Kms 41.14 56.4% 69.3%<br />
Aharbal Road<br />
Roads<br />
14 14 Karlgund-Ashpora- Kashmir Transport Kupwara 13.53 Kms 20.85 66.6% 46.2%<br />
Qaziabad Road<br />
Roads<br />
15 15 Handwara Zachaldara Kashmir Transport Kupwara 17.04 Kms 19.99 647% 64%<br />
Waddur Road<br />
Roads<br />
16 16 Natipora-Chandoora- Kashmir Transport Srinagar 24.00 Kms 28.18 65.7% 51.5%<br />
Chari Sharief Road<br />
Roads<br />
17 17 Sopore-Bandipora Road* Kashmir Transport<br />
Roads<br />
Baramulla 30.87 Kms 34.73 27.9% 33.3%<br />
18 18 Habdipora-Qadar- Kashmir Transport Anantnag 24.00 Kms 30.34 39.5% 38.7%<br />
Qaimoh Road*<br />
Roads<br />
19 Town Roads Kargil - Lot Kashmir Transport Kargil 5 Kms 4.02 4.8% 55.5%<br />
1(Circular road, Goma<br />
Kargil)<br />
Roads<br />
20 Town Roads Kargil - Lot Kashmir Transport Kargil 5.70 Kms 1.49 95.5% 153%<br />
2 (G.M. Pora, Trespone<br />
link roads)<br />
Roads<br />
19 21 Town Roads Kargil Lot Kashmir Transport Kargil 25 Mtrs 1.715 24.3% 30.8%<br />
3(Tharmusa Pushkum<br />
Bridge)**<br />
Roads<br />
22 Town Roads Lehl-G24- Kashmir Transport Leh 3.60 Kms 2.15 51.4% 46.5%<br />
Lot 1 B.M. (Tyan Ray)<br />
Roads<br />
40