21.07.2013 Views

Prime Minister's Reconstruction Plan - Ministry of Home Affairs

Prime Minister's Reconstruction Plan - Ministry of Home Affairs

Prime Minister's Reconstruction Plan - Ministry of Home Affairs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.<br />

No.<br />

Con<br />

tract<br />

Sl.<br />

No.<br />

Sub-project Region Sector District Scope Cost (Rs.<br />

in crores)<br />

Present Status<br />

Physical (<br />

cumulative as<br />

on date )<br />

Financial (<br />

cumulative as<br />

on date )<br />

54 64 Doda-Bharath Road Jammu Transport<br />

Roads<br />

Doda 20.5 Kms 23.42 67.8% 60.9%<br />

55 65 Drabshalla-Bimalnag Jammu Transport Kishtwa 8.36 Kms 12.03 58% 19.8%<br />

Rad<br />

Roads<br />

56 66 Kali Bari Kathua-Hatli Jammu Transport Kathua 6.57 Kms 22.61 13.2% 51.9%<br />

Morh Road C99<br />

Roads<br />

57 67 Kooh Nallah Bridge Jammu Transport Udhampu 42 Mtrs 4.0 87.75% 44.7%<br />

Roads r<br />

58 68 Kaghote Nallah Bridge Jammu Transport Udhampu 47 Mtrs 3.63 34.2% 20.2%<br />

Roads r<br />

59 69 Devak Nallah Bridge Jammu Transport<br />

Roads<br />

Jammu 136.6 Mtrs 2.99 85% 52.8%<br />

60 70 22 Tube Wells Jammu Urban<br />

Water<br />

Supply<br />

Jammu Tubewels-19 11.45 100% 93.7%<br />

61 71 Strengtheening <strong>of</strong> Jammu Urban Jammu 600-100 dia 60 24.36 77% 88.6%<br />

Existing System Rising<br />

Water<br />

Kms<br />

Mains (Phase-I)<br />

Supply<br />

62 72 Strengthening <strong>of</strong> Existing Jammu Urban Jammu 250-100 dia 25 7.60 73% 60.5%<br />

System Rising Main<br />

Water<br />

Kms<br />

(Phase-II)<br />

Supply<br />

63 73 Strengthening <strong>of</strong> Existing Jammu Urban Jammu 89 Kms.<br />

51.98 90.4% 72.6%<br />

System Rising Main<br />

Water<br />

(Phase-III)<br />

Supply<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!