Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
Con<br />
tract<br />
Sl.<br />
No.<br />
Sub-project Region Sector District Scope Cost (Rs.<br />
in crores)<br />
Present Status<br />
Physical (<br />
cumulative as<br />
on date )<br />
Financial (<br />
cumulative as<br />
on date )<br />
54 64 Doda-Bharath Road Jammu Transport<br />
Roads<br />
Doda 20.5 Kms 23.42 67.8% 60.9%<br />
55 65 Drabshalla-Bimalnag Jammu Transport Kishtwa 8.36 Kms 12.03 58% 19.8%<br />
Rad<br />
Roads<br />
56 66 Kali Bari Kathua-Hatli Jammu Transport Kathua 6.57 Kms 22.61 13.2% 51.9%<br />
Morh Road C99<br />
Roads<br />
57 67 Kooh Nallah Bridge Jammu Transport Udhampu 42 Mtrs 4.0 87.75% 44.7%<br />
Roads r<br />
58 68 Kaghote Nallah Bridge Jammu Transport Udhampu 47 Mtrs 3.63 34.2% 20.2%<br />
Roads r<br />
59 69 Devak Nallah Bridge Jammu Transport<br />
Roads<br />
Jammu 136.6 Mtrs 2.99 85% 52.8%<br />
60 70 22 Tube Wells Jammu Urban<br />
Water<br />
Supply<br />
Jammu Tubewels-19 11.45 100% 93.7%<br />
61 71 Strengtheening <strong>of</strong> Jammu Urban Jammu 600-100 dia 60 24.36 77% 88.6%<br />
Existing System Rising<br />
Water<br />
Kms<br />
Mains (Phase-I)<br />
Supply<br />
62 72 Strengthening <strong>of</strong> Existing Jammu Urban Jammu 250-100 dia 25 7.60 73% 60.5%<br />
System Rising Main<br />
Water<br />
Kms<br />
(Phase-II)<br />
Supply<br />
63 73 Strengthening <strong>of</strong> Existing Jammu Urban Jammu 89 Kms.<br />
51.98 90.4% 72.6%<br />
System Rising Main<br />
Water<br />
(Phase-III)<br />
Supply<br />
44