Sl. No. Name <strong>of</strong> work Sanctioned<br />
Cost in<br />
Lakhs<br />
2 Comprehensive Sewer<br />
Scheme for Zone-III <strong>of</strong><br />
Greater Srinagar (Rs<br />
13282 lakhs )<br />
c Lateral Sewer in Sector-<br />
2 <strong>of</strong> Zone-III<br />
d Lateral Sewer in Sector-<br />
3 <strong>of</strong> Zone-III<br />
e Lateral Sewer in Sector-<br />
1 <strong>of</strong> Zone-III<br />
f Raiders and House<br />
Connections<br />
Agency / Work-wise Status <strong>of</strong> JNNURM Works (UD) being executed by NBCC in J&K State<br />
3508.33<br />
Name <strong>of</strong> Agency to<br />
whom work<br />
awarded<br />
Age Construction Pvt.<br />
Ltd. Sgr<br />
Continental<br />
Construction<br />
Corporation Ltd. Sgr<br />
Continental<br />
Construction<br />
Corporation Ltd. Sgr<br />
Date <strong>of</strong> Start Scheduled date<br />
<strong>of</strong> Completion<br />
Likely date <strong>of</strong><br />
Completion<br />
Status<br />
14.06.08 13.06.09 31.10.09 50% (Work Completed)<br />
23.01.09 ___ ___<br />
22.01.09 ___ ___<br />
Agency failed to mobilize. Fresh tenderds<br />
being inviited in smaller packages which<br />
are expected to be finalized within<br />
1 & 1/2 Months<br />
3092.18 yet to be awarded ●Consultant appointed by State Govt. has<br />
been asked to give bill <strong>of</strong> quuantity <strong>of</strong><br />
each Sector for inviting tenders.<br />
● However, State Govt. has been<br />
requested to consider execution <strong>of</strong> house<br />
connections through its line Department .<br />
A meeting was held under the Chairmanship <strong>of</strong> the Hon'ble Chief Minister J&K on 09.07.09 wherein it was desired by him that NBCC shall project the completion dates<br />
<strong>of</strong> each and every component <strong>of</strong> the scheme indicating the problem areas and their solutions for speedy implementation <strong>of</strong> the project. Accordingly, it is being<br />
submitted to J&K Government in Consultation with the Line Department and Consultant recently appointed by the State Govt.<br />