2 Ramban<br />
[3x40 MVA,<br />
220/132 kV and<br />
1x20 MVA<br />
132/33 kV]<br />
3 Bishnah<br />
[2x160 MVA,<br />
220/132 kV<br />
and 2x50 MVA,<br />
132/33 kV]<br />
4 Construction <strong>of</strong><br />
220 kV line Bays<br />
(6 Nos.)<br />
2004 4783.3<br />
(Including<br />
132/33kV<br />
system)<br />
2004 6925.31<br />
(Including<br />
132/33kV<br />
system)<br />
2009-10 2010-11 N N 2758.041 2025.22 1172.05<br />
2<br />
3930.093 Development <strong>of</strong> 220 KV,<br />
132KV yard and 33kV<br />
yard and construction <strong>of</strong><br />
boundary wall is near<br />
completion. Laying <strong>of</strong><br />
E/mat 75% cable ducst<br />
55% Stringing <strong>of</strong> bus bar<br />
60%.<br />
Executing Agency: M/s<br />
2009-10 2010-11 N N 2945.516 3979.13 2213.54 5159.056 Compound wall/chain link<br />
fencing (380 mtrs),<br />
construction <strong>of</strong> road (240<br />
mtrs.), 98% work <strong>of</strong><br />
control room building<br />
completed & laying <strong>of</strong><br />
earth mat (98% complete),<br />
fencing <strong>of</strong> yard (90%<br />
complete) under progress,<br />
Transformer foundation in<br />
progress (95%) completed<br />
.<br />
Executing Agency: M/s<br />
KEC<br />
A2Z and UB Engg.<br />
2004 1072.3 2007-08 N Y 222.934 750.00 128.917 351.851 Construction <strong>of</strong> all<br />
foundations has been<br />
completed. Erection <strong>of</strong><br />
equipment structure<br />
completed (100%). Erection<br />
<strong>of</strong> Bus bar/earth wire<br />
completed (100%). 8 Nos.<br />
isolators, 1 set <strong>of</strong> CTs& 1 No.<br />
SF6 breaker erected at Barn<br />
Grid Station. Executing<br />
Agency: PDD, J&K<br />
17