Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Prime Minister's Reconstruction Plan - Ministry of Home Affairs
Prime Minister's Reconstruction Plan - Ministry of Home Affairs
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.<br />
No.<br />
Con<br />
tract<br />
Sl.<br />
No.<br />
Sub-project Region Sector District Scope Cost (Rs.<br />
in crores)<br />
21 31 Sharda-Kamal Kote road Kashmir Transport<br />
Roads<br />
22 32 Gundtal Dara Bridge Kashmir Transport<br />
Roads<br />
23 33 Teibal Bridge Kashmir Transport<br />
Roads<br />
24 34 Kani-Kadal Bridge Kashmir Transport<br />
Roads<br />
25 35 Laktipora Bridge Kashmir Transport<br />
Roads<br />
26 36 Town-Hall Budgam Kashmir Transport<br />
Bridge<br />
Roads<br />
27 37 Naraspora-Budgam Kashmir Transport<br />
Bridge<br />
Roads<br />
28 38 Soaf-Shali Bridge Kashmir Transport<br />
Roads<br />
29 39 Sail-Pulwama Bridge Kashmir Transport<br />
Roads<br />
30 40 Padshahi Bagh Bridge Kashmir Transport<br />
Roads<br />
31 41 Yarbugh Bridge Kashmir Transport<br />
Roads<br />
32 42 Dachinpora Bridge Kashmir Transport<br />
Roads<br />
Physical (<br />
cumulative<br />
as on date )<br />
Present Status<br />
Financial (<br />
cumulative as<br />
on date )<br />
Baramulla 15.50 Kms 19.07 4.6% 26.1%<br />
Srinagar 18 Mtrs 0.77 98% 62%<br />
Srinagar 26 Mtrs 1.07 93% 110%<br />
Srinagar 32 Mtrs 1.54 100% 82%<br />
Anantnag 18 Mtrs 1.2 100% 106%<br />
Budgam 26 Mtrs 1.52 60.2% 103.6%<br />
Budgam 22 Mtrs 1.3 75% 86%<br />
Anantnag 120 Mtrs 4.6 98% 99%<br />
Pulwama 22 Mtrs 1.08 90% 75%<br />
Srinagar 26 Mtrs 2.66 32.6% 38.9%<br />
Baramulla 37 Mtrs 2.03 57% 63%<br />
Baramulla 50Mtrs 1.96 99% 96%<br />
41