4 Amargarh<br />

(Delina)<br />

[1x160MVA,<br />

220/132 kV +<br />

1x50,132/33kV]<br />

5 Alusteng<br />

[2x160MVA,<br />

220/132 kV +<br />

2x50,132/33kV]<br />

6 Provision <strong>of</strong><br />

220kV PLCC<br />

equipment<br />

132/33 kV Substations<br />

1 Aug. <strong>of</strong> 132/33kV<br />

Substation at<br />

Pampore (150 to<br />

200 MVA)<br />

2 Khonmoh<br />

[1x50MVA,<br />

132/33kV]<br />

3 Tethar-Banihal<br />

[1x50MVA,<br />

2005 6048.00 2008-09 2010-11 N Y 2092 0 1035 3127 80% <strong>of</strong> control room<br />

building work completed<br />

and 60% <strong>of</strong> foundation<br />

works for structures /<br />

equipment and erection<br />

completed<br />

Executing Agency: M/s<br />

JYOTI ST.<br />

2005 8648.0 2008-09 2010-11 N Y 2171 0 1012 3183 Leveling & construction <strong>of</strong><br />

retaining walls, control<br />

room building under<br />

progress. 20% <strong>of</strong> control<br />

room building work<br />

2005 2004.0 N N<br />

completed<br />

Executing Agency: M/s<br />

JYOTI ST.<br />

Tender Stage<br />

2005 668.00 2007-08 2008-09 N Y 628 0 0 628 50 MVA transformer<br />

commissioned, 100%<br />

foundation works for<br />

structures / equipment<br />

completed<br />

Executing Agency: PDD,<br />

2005 1526.00 2007-08 2008-09 N Y 1525 0 0 1525 Commissioned in May<br />

2009<br />

Executing Agency: PDD,<br />

2005 1752.00 2007-08 2009-10 N Y 1730 0 0 1730 Commissioned in April<br />

2009<br />

J&K<br />

J&K<br />

27