4 Amargarh<br />
(Delina)<br />
[1x160MVA,<br />
220/132 kV +<br />
1x50,132/33kV]<br />
5 Alusteng<br />
[2x160MVA,<br />
220/132 kV +<br />
2x50,132/33kV]<br />
6 Provision <strong>of</strong><br />
220kV PLCC<br />
equipment<br />
132/33 kV Substations<br />
1 Aug. <strong>of</strong> 132/33kV<br />
Substation at<br />
Pampore (150 to<br />
200 MVA)<br />
2 Khonmoh<br />
[1x50MVA,<br />
132/33kV]<br />
3 Tethar-Banihal<br />
[1x50MVA,<br />
2005 6048.00 2008-09 2010-11 N Y 2092 0 1035 3127 80% <strong>of</strong> control room<br />
building work completed<br />
and 60% <strong>of</strong> foundation<br />
works for structures /<br />
equipment and erection<br />
completed<br />
Executing Agency: M/s<br />
JYOTI ST.<br />
2005 8648.0 2008-09 2010-11 N Y 2171 0 1012 3183 Leveling & construction <strong>of</strong><br />
retaining walls, control<br />
room building under<br />
progress. 20% <strong>of</strong> control<br />
room building work<br />
2005 2004.0 N N<br />
completed<br />
Executing Agency: M/s<br />
JYOTI ST.<br />
Tender Stage<br />
2005 668.00 2007-08 2008-09 N Y 628 0 0 628 50 MVA transformer<br />
commissioned, 100%<br />
foundation works for<br />
structures / equipment<br />
completed<br />
Executing Agency: PDD,<br />
2005 1526.00 2007-08 2008-09 N Y 1525 0 0 1525 Commissioned in May<br />
2009<br />
Executing Agency: PDD,<br />
2005 1752.00 2007-08 2009-10 N Y 1730 0 0 1730 Commissioned in April<br />
2009<br />
J&K<br />
J&K<br />