132/33kV] Executing Agency: PDD,<br />

J&K<br />

4 Vilgam(Kupwara) 2005 1584.00 2007-08 2009-10 N Y 1211 0 68.00 1279 95% <strong>of</strong> control room<br />

[1x50MVA,<br />

building work completed<br />

132/33kV]<br />

and 100% foundation<br />

works for structures /<br />

equipment and erection<br />

completed.<br />

installed.<br />

Transformer<br />

Executing Agency: PDD,<br />

J&K<br />

5 Magam<br />

2005 1752.00 2007-08 2009-10 N Y 1505 0 39.00 1544.00 98% <strong>of</strong> control room<br />

[1x50MVA,<br />

building work completed<br />

132/33kV]<br />

and 100% foundation<br />

works for structures /<br />

equipment and erection<br />

completed,<br />

installed.<br />

Transformer<br />

6 Shopian<br />

2005 1752.00 2008-09 2010-11 N Y 1155 0 58.00 1213.00<br />

Executing Agency: PDD,<br />

J&K<br />

80% <strong>of</strong> control room building<br />

[1x50MVA,<br />

work completed and 80% <strong>of</strong><br />

132/33kV]<br />

foundation works for<br />

structures / equipment and<br />

erection completed,<br />

Transformer installed.<br />

Executing Agency: M/s<br />

GET<br />

7 Bandipora 2005 1752.00 2008-09 2010-11 N Y 1163 0 58.00 1221.00 75% <strong>of</strong> control room<br />

[1x50MVA,<br />

building work completed<br />

132/33kV]<br />

and 80% <strong>of</strong> foundation<br />

works for structures /<br />

equipment and erection<br />

completed,<br />

installed.<br />

Transformer<br />

28