132/33kV] Executing Agency: PDD,<br />
J&K<br />
4 Vilgam(Kupwara) 2005 1584.00 2007-08 2009-10 N Y 1211 0 68.00 1279 95% <strong>of</strong> control room<br />
[1x50MVA,<br />
building work completed<br />
132/33kV]<br />
and 100% foundation<br />
works for structures /<br />
equipment and erection<br />
completed.<br />
installed.<br />
Transformer<br />
Executing Agency: PDD,<br />
J&K<br />
5 Magam<br />
2005 1752.00 2007-08 2009-10 N Y 1505 0 39.00 1544.00 98% <strong>of</strong> control room<br />
[1x50MVA,<br />
building work completed<br />
132/33kV]<br />
and 100% foundation<br />
works for structures /<br />
equipment and erection<br />
completed,<br />
installed.<br />
Transformer<br />
6 Shopian<br />
2005 1752.00 2008-09 2010-11 N Y 1155 0 58.00 1213.00<br />
Executing Agency: PDD,<br />
J&K<br />
80% <strong>of</strong> control room building<br />
[1x50MVA,<br />
work completed and 80% <strong>of</strong><br />
132/33kV]<br />
foundation works for<br />
structures / equipment and<br />
erection completed,<br />
Transformer installed.<br />
Executing Agency: M/s<br />
GET<br />
7 Bandipora 2005 1752.00 2008-09 2010-11 N Y 1163 0 58.00 1221.00 75% <strong>of</strong> control room<br />
[1x50MVA,<br />
building work completed<br />
132/33kV]<br />
and 80% <strong>of</strong> foundation<br />
works for structures /<br />
equipment and erection<br />
completed,<br />
installed.<br />
Transformer<br />
28