8 Larkipora (Lissar)<br />
[1x50MVA,<br />
132/33kV]<br />
Executing Agency: M/s<br />
GET.<br />
2005 1752.00 2008-09 2010-11 N Y 1095 0 60 1155 95% <strong>of</strong> control room<br />
building work completed<br />
and 95% <strong>of</strong> foundation<br />
works for structures /<br />
equipment and erection<br />
completed,<br />
installed.<br />
Transformer<br />
Executing Agency: M/s<br />
GET<br />
9 8 Nos. 132 kV<br />
line bays<br />
2005 933.00 2009-10 N N 460.85 0 0 460.85 35% <strong>of</strong> work completed<br />
10 132 kV PLCC<br />
Equipment<br />
2005 1016.00 2009-10 N N 0 Tender stage<br />
TOTAL 73574.00 39150.9 4563.00<br />
43713.85<br />
NOTES:<br />
1. S/C – Single Circuit, D/C – Double Circuit<br />
2. PLCC - Power Line Carrier Communication<br />
3. LILO – Loop In Loop Out<br />
4. AAAC – All Aluminium Alloy Conductor<br />
5. N – No, Y – Yes<br />
6. CEA is providing consultancy services for the works being executed by various agencies (other than departmental works)<br />
29