8 Larkipora (Lissar)<br />

[1x50MVA,<br />

132/33kV]<br />

Executing Agency: M/s<br />

GET.<br />

2005 1752.00 2008-09 2010-11 N Y 1095 0 60 1155 95% <strong>of</strong> control room<br />

building work completed<br />

and 95% <strong>of</strong> foundation<br />

works for structures /<br />

equipment and erection<br />

completed,<br />

installed.<br />

Transformer<br />

Executing Agency: M/s<br />

GET<br />

9 8 Nos. 132 kV<br />

line bays<br />

2005 933.00 2009-10 N N 460.85 0 0 460.85 35% <strong>of</strong> work completed<br />

10 132 kV PLCC<br />

Equipment<br />

2005 1016.00 2009-10 N N 0 Tender stage<br />

TOTAL 73574.00 39150.9 4563.00<br />

43713.85<br />

NOTES:<br />

1. S/C – Single Circuit, D/C – Double Circuit<br />

2. PLCC - Power Line Carrier Communication<br />

3. LILO – Loop In Loop Out<br />

4. AAAC – All Aluminium Alloy Conductor<br />

5. N – No, Y – Yes<br />

6. CEA is providing consultancy services for the works being executed by various agencies (other than departmental works)<br />