24.07.2013 Views

West Babine Sustainable Resource Management Plan

West Babine Sustainable Resource Management Plan

West Babine Sustainable Resource Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Xsu gwin lik’l’inswx: <strong>West</strong> <strong>Babine</strong> <strong>Sustainable</strong> <strong>Resource</strong> <strong>Management</strong> <strong>Plan</strong><br />

Source Comments SRMP Resolution<br />

BV Rod and<br />

Gun Club<br />

They are not in favour of widening the park boundary, or<br />

changing the existing special management zone to a<br />

recreation zone<br />

Mike O'Neill The proposed expansion of the SMZ is inconsistent with the<br />

Bulkley LRMP which adjoins the area and is another attempt<br />

to discourage resident angler access to the <strong>Babine</strong> River.<br />

PIR A 210 year rotation may be unnecessarily constraining to<br />

timber supply given other constraints in the SMZ.<br />

CRB The <strong>Babine</strong> River SMZ should be narrowed on its east end so<br />

that it aligns with the SMZ within the <strong>Babine</strong> LUP.<br />

Atna-Shelagyote SMZ<br />

PIR Stakeholders must define sustainability of recreational use and<br />

what mix of motorized/non-motorized, commercial/noncommercial<br />

use is suitable.<br />

PIR Restricting commercial logging is overly constraining to the<br />

THLB. Harvesting should be allowed in consideration of the<br />

ecological and recreational values for which the zone was<br />

established.<br />

Social and Economic <strong>Resource</strong>s<br />

General<br />

CRB Potential employment opportunities for residents of the<br />

Kispiox TSA are not a primary focus of the plan; and today's<br />

forestry economics should not be used to make decisions<br />

about constraining future forest management opportunities<br />

that could provide local employment.<br />

Timber<br />

PIR What is the area of forest to be available for forestry<br />

development over time and have all constraints imposed by<br />

this plan been analysed to show their impact on timber<br />

supply?<br />

Page 96 March 2004<br />

The SRMP does not increase the width of the Park Boundary or<br />

change the existing SMZ into a recreation zone.<br />

The minor expansion of the <strong>Babine</strong> River SMZ does not occur<br />

within the Bulkley LRMP area. The expansion provides an<br />

increased buffer to the park as is its original intent. The<br />

expansion does not exclude access or alter existing or future<br />

access patterns.<br />

The timber rotation is consistent with the <strong>Babine</strong> LRUP<br />

direction.<br />

Change has been made.<br />

Wording for the Atna/Shelagyote SMZ recreation changed to reflect<br />

the LRMP.<br />

Silvicon's assessment of the timber values in this area suggests that<br />

this area is inoperable.<br />

Kispiox Forestry Licensees have been consulted throughout the<br />

plan's development.<br />

Economic impact of the draft SRMP has been assessed in the SEA.<br />

Estimated impact, based largely on the THLB within the<br />

Atna/Shelagyote is 2-4%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!