West Babine Sustainable Resource Management Plan
West Babine Sustainable Resource Management Plan
West Babine Sustainable Resource Management Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Source Draft # Date Comments SRMP Resolution<br />
GTO Draft 1 Sept. 19/02 Need to accommodate Gitxsan interest within the<br />
<strong>Babine</strong> River SMZ, especially in relation to proposed<br />
logging.<br />
GC Cultural<br />
Heritage<br />
Draft<br />
GC Cultural<br />
Heritage<br />
Draft<br />
GC Cultural<br />
Heritage<br />
Draft<br />
GC Cultural<br />
Heritage<br />
Draft<br />
GC Cultural<br />
Heritage<br />
Draft<br />
GC Cultural<br />
Heritage<br />
Draft<br />
GC Cultural<br />
Heritage<br />
Draft<br />
January 8/03 Need to address concerns about logging roads being<br />
placed on traditional trail locations, or too close to<br />
village sites, cache pits etc.<br />
January 8/03 Need to address logging block placements in relation to<br />
retention of Culturally Modified Trees, cremation sites,<br />
village sites, cache pits etc.<br />
January 8/03 Need to recognize importance of Damsumlo Lakes area<br />
(many Gitxsan trails, village sites and trapping<br />
grounds).<br />
Botanical Forest Products<br />
January 8/03 Need to address traditional harvest of 13 different<br />
species of mushrooms which could all be harvested<br />
commercially.<br />
January 8/03 Need to address protection of hemlock areas from<br />
logging as they are an important source of BFP.<br />
January 8/03 Need to address management of house territories for the<br />
gathering of medicine.<br />
January 8/03 Need to address burning for cultural purposes (to<br />
manage for berry production, animal habitat, forest<br />
health and access).<br />
March 2004 Page 113<br />
Gitxsan have not clarified their interests with sufficient<br />
detail that specific plan adjustments can be made. The<br />
plan will be amended to consider FN cultural<br />
infrastructure when the information and management<br />
guidelines is available.<br />
Cultural Heritage <strong>Resource</strong> Guidelines are intended to<br />
reduce conflicting resource use and to guide development<br />
on and around cultural heritage features. As more<br />
detailed information is provided by GTO, management<br />
guidelines and strategies will be developed.<br />
No objectives have been provided by the Gitxsan for<br />
spatial objectives. Therefore, these issues will need to be<br />
addressed at the operational level.<br />
A core ecosystem (no logging) and high-value grizzly<br />
bear habitat has been established in the vicinity of<br />
Damsumlo Lake.<br />
More specific information is needed on these species in<br />
order to manage for them as part of the WB SRMP.<br />
Until then, an ecosystem based management approach<br />
should reduce risk to these species in the short term by<br />
ensuring the habitats that support mushrooms is<br />
maintained across the landscape.<br />
Significant hemlock areas are part of reserves and the<br />
inoperable and will never be harvested.<br />
More specific information is needed on these species in<br />
order to manage for them as part of the WB SRMP.<br />
Until then, an ecosystem based management approach<br />
should reduce risk to these species in the short term.<br />
Section 2.2.1 and 3.1.1.2 discuss the historical use of fire<br />
to maintain biodiversity. In Section 3.3.6.2 <strong>Management</strong><br />
Considerations address the use of fire as a means for<br />
increasing berry productivity.