24.07.2013 Views

West Babine Sustainable Resource Management Plan

West Babine Sustainable Resource Management Plan

West Babine Sustainable Resource Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Xsu gwin lik’l’inswx: <strong>West</strong> <strong>Babine</strong> <strong>Sustainable</strong> <strong>Resource</strong> <strong>Management</strong> <strong>Plan</strong><br />

Source Draft # Date Comments SRMP Resolution<br />

GC Cultural<br />

Heritage<br />

Draft<br />

GC Cultural<br />

Heritage<br />

Draft<br />

January 8/03 Need to provide for moose winter range. Most of moose winter range is constrained by a number<br />

of different zonations including the park, the <strong>Babine</strong><br />

River SMZ and high-value grizzly habitat. 19% of highvalue<br />

range, 21% of medium value range and 19% of low<br />

value range is unconstrained and within the Integrated<br />

<strong>Management</strong> Area. Given these small numbers, little<br />

reduction to risk is expected from have moose winter<br />

range objectives, therefore, none have been developed.<br />

January 8/03 Will plan protect mountain goats that seem to be in a<br />

decline (Atna to Mt. Tommy Jack area)?<br />

Social/Cultural/Heritage<br />

GTO Draft 1 Sept. 19/02 Need to address ‘glaring deficiency’ that current &<br />

future interests of identified Gitxsan villages & houses<br />

are not given consideration (include resettlement of<br />

villages and pursuit of economic opportunities such as<br />

fisheries, tourism, mining, recreation etc.). Need to<br />

include appropriate, measurable, enforceable objectives<br />

to protect this interest.<br />

GTO Interim<br />

Draft<br />

July 7/03 Lack of management objectives around cultural<br />

heritage resources is unacceptable.<br />

GTO Draft 1 Aug. 26/02 Need to recognize that cultural heritage resources,<br />

features & cultural infrastructure belong to the Gitxsan.<br />

Page 112 March 2004<br />

The Atna/Shelagyote SMZ expansion will provide<br />

increased protection for mountain goats. The plan<br />

provides no objectives for managing mtn. goat habitat. If<br />

monitoring results indicate goats are at risk, the<br />

information can be used to develop objectives that can be<br />

amended into the plan at a latter date.<br />

Information about current and potential Gitxsan tourism<br />

opportunities have been included in section 3.3.2. If<br />

additional information is provided about Gitxsan<br />

opportunities in other sectors, this information can be<br />

included in the final document.<br />

Comments received from the Gitxsan chiefs, GTO, and<br />

information from the Gitxsan Sustainability plan for the<br />

<strong>Babine</strong> watershed have been incorporated into the plan.<br />

In most instances this information provides context and<br />

background and is not spatially explicit.<br />

Outside the scope of the SRMP.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!