List of Milestones<br />
Milestones are control points where decisions are needed with regard to the next stage of the project. For<br />
example, a milestone may occur when a major result has been achieved, if its successful attainment is a<br />
required for the next phase of work. Another example would be a point when the consortium must decide<br />
which of several technologies to adopt for further development.<br />
We detected the following milestones for our project:<br />
Milestone Milestone name Workpackag Expected<br />
number<br />
e(s) involved date 10<br />
Means of verification 11<br />
M1 Learning and inference 1 18 Software package on inference for<br />
with iHMMs<br />
imprecise HMMs released and<br />
validated on synthetic data<br />
M2 Learning and inference 1 30 Software package on imprecise<br />
with general imprecise<br />
graphical models<br />
MRFs and BNs tested on real data<br />
M3 Dissimilarity measures 2 18 Software implementation released<br />
b/w generative models<br />
and validated on datasets<br />
M4 Classification of 2 30 Software implementation released<br />
imprecise/precise<br />
generative models<br />
and validated on datasets<br />
M5 Learning of<br />
3 18 Software implementation released<br />
discriminative action<br />
parts via MIL<br />
and validated on datasets<br />
M6 Learning and<br />
3 30 Software implementation released<br />
classification of<br />
structured discriminative<br />
models<br />
and validated on all datasets<br />
M7 Dataset generation 4 12 Proprietary testbeds in multiple<br />
modalities acquired and released to<br />
the consortium<br />
M8 Feature selection and 4 18 Software implementation released<br />
extraction<br />
and validated on all datasets<br />
M9 All purpose action 5 36 Integrated prototype assembled,<br />
recognition framework<br />
validated and ready<br />
M10 Validation in all 5 30 Prototype tested and validated on<br />
scenarios<br />
all available datasets, state-of-theart<br />
results obtained<br />
Their detailed description is given in Section 1.3.4. Their location within the project is shown in the PERT<br />
diagram of Section (iv), in terms of both duration in months and dependencies from the individual tasks the<br />
five research work packages are broken into.<br />
10 Measured in months from the project start date (month 1).<br />
11 Show how you will confirm that the milestone has been attained. Refer to indicators if appropriate. For example: a<br />
laboratory prototype completed and running flawlessly; software released and validated by a user group; field survey<br />
complete and data quality validated.<br />
<strong>Proposal</strong> Part B: page [27] of [67]