28.07.2013 Views

Project Proposal (PDF) - Oxford Brookes University

Project Proposal (PDF) - Oxford Brookes University

Project Proposal (PDF) - Oxford Brookes University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FP7-ICT-2011-9 STREP proposal<br />

18/01/12 v1 [Dynact]<br />

List of Milestones<br />

Milestones are control points where decisions are needed with regard to the next stage of the project. For<br />

example, a milestone may occur when a major result has been achieved, if its successful attainment is a<br />

required for the next phase of work. Another example would be a point when the consortium must decide<br />

which of several technologies to adopt for further development.<br />

We detected the following milestones for our project:<br />

Milestone Milestone name Workpackag Expected<br />

number<br />

e(s) involved date 10<br />

Means of verification 11<br />

M1 Learning and inference 1 18 Software package on inference for<br />

with iHMMs<br />

imprecise HMMs released and<br />

validated on synthetic data<br />

M2 Learning and inference 1 30 Software package on imprecise<br />

with general imprecise<br />

graphical models<br />

MRFs and BNs tested on real data<br />

M3 Dissimilarity measures 2 18 Software implementation released<br />

b/w generative models<br />

and validated on datasets<br />

M4 Classification of 2 30 Software implementation released<br />

imprecise/precise<br />

generative models<br />

and validated on datasets<br />

M5 Learning of<br />

3 18 Software implementation released<br />

discriminative action<br />

parts via MIL<br />

and validated on datasets<br />

M6 Learning and<br />

3 30 Software implementation released<br />

classification of<br />

structured discriminative<br />

models<br />

and validated on all datasets<br />

M7 Dataset generation 4 12 Proprietary testbeds in multiple<br />

modalities acquired and released to<br />

the consortium<br />

M8 Feature selection and 4 18 Software implementation released<br />

extraction<br />

and validated on all datasets<br />

M9 All purpose action 5 36 Integrated prototype assembled,<br />

recognition framework<br />

validated and ready<br />

M10 Validation in all 5 30 Prototype tested and validated on<br />

scenarios<br />

all available datasets, state-of-theart<br />

results obtained<br />

Their detailed description is given in Section 1.3.4. Their location within the project is shown in the PERT<br />

diagram of Section (iv), in terms of both duration in months and dependencies from the individual tasks the<br />

five research work packages are broken into.<br />

10 Measured in months from the project start date (month 1).<br />

11 Show how you will confirm that the milestone has been attained. Refer to indicators if appropriate. For example: a<br />

laboratory prototype completed and running flawlessly; software released and validated by a user group; field survey<br />

complete and data quality validated.<br />

<strong>Proposal</strong> Part B: page [27] of [67]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!