C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 249<br />
1.0 GENERAL<br />
PARTICULAR SPECIFICATIONS<br />
(ROAD WORKS)<br />
The Particular Specifications are to be read in conjunction with the<br />
<strong>specifications</strong> contained in the description of items of Schedule “A”<br />
specification contained in “Standard Specifications” published by<br />
Buildings and Communications Department of <strong>Maharashtra</strong>, relevant<br />
Indian Standard Specifications. In case of conflicting provisions in<br />
various documents (except Schedule “A”), the provisions in Particular<br />
Specifications shall take precedence over any other documents.<br />
2.0 CLEARING SITE :<br />
The ground over which the Roads are to be constructed shall be<br />
cleared from all loose, vegetation, bushes, stumps and all other<br />
objectionable materials. Brushwood, stumps, vegetation etc. shall be<br />
cut flush with the ground. Materials obtained from clearing site shall<br />
be disposed off as directed.<br />
3.0 Excavation for <strong>road</strong>ways to any depth in all types of earth, soils such<br />
as sand, gravel slush, soft murum, hard murum with or without<br />
boulders with all lifts and upto 1.5m depth including disposing off<br />
the surplus materials within 50m. beyond the work site, stacking and<br />
spreading as directed including payment of royalty charges, fees,<br />
taxes etc.<br />
3.1 GENERAL:<br />
Roadway and drainage excavation shall consist of excavation,<br />
removal, conveyance and satisfactory disposed of materials of the<br />
strata covered by the wording of the item for the construction of the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 250<br />
<strong>road</strong> and its drainage including finishing the surface and the slopes<br />
to the required grade, lines, levels, curves and sections shown on the<br />
plans or as directed by the Engineer. The item also covers<br />
maintaining the work in finished condition until taken over by the<br />
Department.<br />
3.2 CLEARING SITE:<br />
The land width required for the <strong>road</strong>way, gutters, side slopes and<br />
catchwater gutters shall be cleared of all trees having a girth of<br />
30cm (about 1’) and less, brushwood, loose stones, vegetation,<br />
bushes, stumps and all other objectionable materials. The roots of<br />
trees shall be removed to a depth of 30cm (about 1’) below the<br />
surface of the <strong>road</strong> formation and side slopes and the excavation<br />
filled up with excavated materials in 15cm to 20cm. (about 6” to 8”).<br />
Layers and compacted, Brushwood, stumps, vegetation, etc. shall be<br />
cut flush with the ground. All the materials cleared will be the<br />
property of <strong>CIDCO</strong>. Useful materials shall be arranged in<br />
convenient stacks along the <strong>road</strong> boundary or as directed at places<br />
within lead of 50 meters (164’) and handed over to the Department<br />
in convenient sections. Unsuitable materials shall be burnt or<br />
otherwise disposed of by the contractor at his own cost as directed<br />
by the Engineer without crushing any nuisance inconvenience or<br />
damage to the work, property or people in the neighborhood. If the<br />
material is disposed of outside the <strong>road</strong> land, necessary permission<br />
from the private land owners shall be taken by the contractor and<br />
royalty etc., if any paid by him without claiming compensation. In all<br />
cases, the materials shall be disposed of in a neat manner.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 251<br />
3.3 SETTING OUT:<br />
After clearing the site, the alignment of the <strong>road</strong> shall be properly set<br />
out true to lines, curves, slopes, grades and sections as shown on the<br />
plans by total station by appointing reputed surveyor as directed by<br />
the Engineer. The contractor shall provide all labour and materials<br />
such as lime, string, pegs, nails, bamboos, stones, mortar concrete<br />
etc., required for setting out, establishing Bench Marks and giving<br />
profiles. The contractor shall responsible for maintaining the B.Ms.,<br />
profiles alignment and other stacks and marks as long as they are<br />
required for the work in the opinion of the Engineer. If the contractor<br />
defaults in this respect even after direction by the Engineer within the<br />
specified time, they may be restored by the Engineer at the cost of<br />
the contractor. Levels and sections of the ground shall be taken and<br />
recorded in the presence of the contractor or his authorized<br />
representative before the excavation is started to serve as the basis<br />
of measurement. The contractor or his representative shall sign the<br />
book in token of his acceptance of the level etc. If there is any<br />
disagreement, the contractor shall inform of it in writing to the officer<br />
concerned with specific reference to the sections before starting<br />
further work. Once further work is started, no cognizance of any<br />
complaint shall be taken. Merely not signing of the book shall not be<br />
deemed as disagreement.<br />
3.4 CLASSIFICATION OF EXCAVATION:<br />
All the materials encountered in the excavation would be mainly<br />
classified in the following groups:<br />
1) Soils of all sorts, sand, gravel, soft murum and other similar<br />
soft or loose materials.<br />
2) Hard murum.<br />
3) Hard murum and boulders.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 252<br />
1) Soil of sorts, sand, gravel, soft murum and other similar soft or<br />
loose materials. :<br />
Soils of all sorts, sand, gravel soft, murum softman, chopan yellow<br />
soil, etc., shall included all material of earthy or sandy nature which<br />
can be easily ploughed or small shingle and gravel which can be<br />
easily removed. Removal of small boulder not exceeding 0.03 cu.m.<br />
or 30 litres (about one c.ft.) accruing in the strata will be included in<br />
the rate for this item.<br />
2) Hard murum :<br />
This shall include all kinds of disintegrated rock or shale or<br />
indurated clay free from boulders larger than 0.03cu.m. or 30 litres<br />
(about one cu.ft.) and can be removed with pick and shovel though<br />
not without some difficulty.<br />
3) Hard Murum & Boulders :<br />
This shall include all kinds of disintegrated rock or shale or<br />
indurated clay interspersed with boulders less than half cubic metre<br />
and larger than 0.03 cu.m. or 30 litres (approx one c.ft.) which do<br />
not normally need blasting and can be removed with pick, bar,<br />
wedges, and hammer. Boulders bigger than 1/2 cu.m. will be paid<br />
for as soft or hard rock according as it is soft or hard rock.<br />
The classification of the excavation would be decided by the<br />
Engineer and his decisions shall be final and binding on the<br />
contractor. Merely the use of explosives in excavation will not be<br />
considered as a reason for higher classification unless blasting is<br />
clearly necessary in the opinion of the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 253<br />
3.5 CONSTRUCTION METHOD:<br />
Profiles of the section including the <strong>road</strong> side gutters to be excavated<br />
shall be laid at suitable intervals of 10 m. (about 32.8’) to 50m.<br />
(about 64’) or other intervals directed by the Engineer to conform to<br />
the curved or straight alignment, section, grades and side slopes.<br />
The lines of cuts shall be clearly marked and profiles of<br />
embankments where excavated materials are to be used shall be set<br />
up with the toe line marked on each side. The <strong>road</strong>way section shall<br />
be first excavated with vertical sides for each lift and the side slopes<br />
for that lift shall be excavated in steps.<br />
These steps shall be smoothened to the required slopes when the<br />
excavation reaches the <strong>road</strong> formation. The contractor shall on no<br />
account excavate beyond the slopes or below the specified grade<br />
unless so directed by the Engineer in writing. If excavation is done<br />
below the specified level or outside the section, it shall not be paid<br />
for and the Contractor shall be required to fill up at his own cost<br />
such extra excavation in the <strong>road</strong> portion with approved materials of<br />
the embankment grade in layer of 15cm. to 20cm. (about 6” to 8”)<br />
watered and fully compacted to attain maximum density laid down<br />
for the embankment in the same agreement elsewhere. The<br />
Engineer may require measurement ridges and dead-men to be left<br />
at specified interval or places and kept intact till ordered to be<br />
removed for the purpose of check measurements. The excavation<br />
shall be finished neatly, smoothly and evenly to the correct lines,<br />
curves, grades sections and side lopes a shown on the plans or<br />
directed by the Engineer. The sub-grade if loose shall be scarified,<br />
watered and compacted to the same density as the embankment.<br />
The section, side slopes and catchwater gutters shall be maintained<br />
by the contractor at his own cost in such a way the formation and
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 254<br />
gutters will be well drained by providing necessary diversions, etc.<br />
and not damaged due to obstruction of any drainage. Necessary<br />
passages shall be provided for leading away seepage, springs,<br />
surface flow or rain water safely without damaging the work. If any<br />
damage occurs due to default of the contractor in this respect, he<br />
shall make good the damage at his own cost. If it is necessary in the<br />
execution of the work to interrupt existing surface drainage,<br />
irrigation channels, sewers or under drainage, temporary<br />
arrangements shall be provided till such time as is necessary. The<br />
contractor at his own cost shall make good the interrupted drainage<br />
and sewer, etc., unless separately provided in the tender. Any<br />
damage to the existing <strong>works</strong> or work in hand caused as a result of<br />
his operations or negligence shall be made good by the contractor<br />
at his own cost.<br />
Roadside gutters shall be excavated to the specified sections and<br />
shall be measured along with the main cutting in cubic meters.<br />
Intercepting or catchwater gutters necessary shall be built to the<br />
cross-section, shown on the plans in time to prevent damage to the<br />
cuts or banks.<br />
3.6 DEWATERING:<br />
If water is met with in the excavation due to springs, seepage, rain or<br />
other causes it shall be removed by suitable diversions, pumping or<br />
bailing out and the excavation kept dry whenever so required or<br />
directed by the Engineer. Care shall be taken to discharge the water<br />
so as not to cause damage to the work, crops or any property or any<br />
inconvenience to the property holders in the neighborhood. Unless<br />
separate provisions is made in the tender fro dewatering the cost of<br />
dewatering shall be covered by the rate for excavation.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 255<br />
3.7 SLIDES:<br />
If slides occur in the cutting they shall be removed as ordered by the<br />
Engineer. If finished slopes slide into the <strong>road</strong>way before the final<br />
acceptance of the work, such slides shall be removed by the<br />
contractor and shall be paid for at the contract rate for the class of<br />
excavation involved provided the slides are not due to any<br />
negligence of the contactor. The classification of the materials in<br />
slides shall conform to its condition at the time of removal and<br />
payment made accordingly regardless or its prior condition.<br />
Care shall be taken to see that excavation is arranged in a safe way<br />
so that these will be no risk to the work or workmen by slides, falling<br />
materials, boulders and collapsing sides etc.<br />
3.8 PROTECTION:<br />
If there is traffic nearby or if there are towns and villages in the<br />
neighborhood, barricades and/or traffic signals shall be provided<br />
day and night for the duration of the work in such a way as to<br />
prevent accidents. Warning signals shall be displayed at 70m. from<br />
the danger point on both sides to give sufficient warning. If<br />
necessary, signalers shall be stationed at each end to regulate traffic<br />
where it is heavy. Measures shall be taken to see that the excavation<br />
does not affect or damage adjoining structures or property. If there<br />
is damage to property, injury to workers, the members of the public<br />
animals etc. due to the negligence of the contractor, he will be<br />
responsible and liable to all the consequences including<br />
compensation.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 256<br />
3.9 DIVERSIONS:<br />
If diversions are necessary for the traffic they shall be provided and<br />
maintained as specified under specification No. BR. 1 of Red Book.<br />
3.10 DISPOSAL OF EXCAVATED MATERIALS:<br />
All the excavated materials shall be the property of <strong>CIDCO</strong>, unless<br />
specifically mentioned otherwise. When the useful excavated<br />
materials is to be used in embankment within a lead of 50 m. (about<br />
164’) it shall be directly deposited at the required location in 15 cm.<br />
to 20 cm. (about 6” to 8”) layers, the charge for watering and<br />
compacting such materials being paid under a separate item. No<br />
handling or conveyance charges shall be paid if the material is<br />
temporarily deposited elsewhere and subsequently conveyed to the<br />
site of deposition. The sequence of operations should be arranged<br />
properly. Useful excavated materials to be used in embankment<br />
beyond 50 m. (about 164’) may be conveyed directly to the site of<br />
use and laid in layers or first deposited in heaps and conveyed and<br />
laid in layers subsequently the conveyance and the charges for the<br />
watering and compaction shall be paid for under a separate item.<br />
Materials required for four times other than bank shall be arranged<br />
in neat stacked at convenient places within a load of 50 m. (about<br />
164’) without interfering with the drainage in any way. If no <strong>CIDCO</strong><br />
land is available but the excavated useful stuff is to be stacked<br />
temporarily before use under the same agreement the contractor<br />
shall make his own arrangement s for the stacking of his materials<br />
temporarily on private lands by paying rents etc. without claiming<br />
any compensation. Surplus cost to uniformly widen embankment to
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 257<br />
flatten slopes and to fill low places in the <strong>road</strong> land within a lead of<br />
50m. (about 164’) is so directed by the Engineer. Materials not<br />
required for any use whatsoever may be disposed off by the<br />
Contractor at his own cost in a manner approved by the Engineer.<br />
The excavated materials shall not be deposited within 3 m. (about<br />
10’) from the top edges of slope of the bank unless expressly<br />
permitted by the Engineer in writing. When the excavated materials<br />
is deposited or disposed off by the contractor in land not belonging<br />
to Government he shall be responsible for any compensation<br />
required to be paid to the private and owner. The leads shall be<br />
measured from approximately centre of the block of the cutting to<br />
the approximate centre of block of deposited material.<br />
3.11 MAINTENANCE:<br />
The excavated <strong>road</strong>way shall be maintained satisfactorily and<br />
protected by the contractor at his own cost against all damage till it<br />
is taken over by the Department. If any damage occurs, the<br />
contractor shall be responsible to repair it at his own cost.<br />
3.12 ITEM TO INCLUDE:<br />
1) Clearing Site<br />
2) Setting out by total station including necessary labour,<br />
material and fixing reference marks.<br />
3) Diversion unless separately provided in the tender.<br />
4) Dewatering unless separately provided in the tender<br />
5) Protective measures for work, work people, public, animal,<br />
property etc.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 258<br />
6) Excavation to the required lines, curves, section and grades.<br />
7) Conveying the excavated materials including all lifts and lead<br />
upto 50 m. (about 164’), spreading in layers or stacking as<br />
directed and disposing off unwanted materials.<br />
8) All labour, materials and use of equipment and tolls required<br />
for completing the item satisfactorily.<br />
9) Compensation on account of damages, accidents or use of<br />
private lands royalty, etc.<br />
3.13 MODE OF MEASUREMENT & PAYMENT:<br />
The contract rate shall be for a unit of one cubic metre for the strata<br />
mentioned in the wording of the items of excavation acceptably<br />
completed, limited to the dimensions shown on the plans or as<br />
directed by the Engineer. Excavation shall be measured in its original<br />
position by the taking cross-sections before the work start and after it<br />
is entirely completed. The quantity shall be worked out by the<br />
Average End Area method. The individual dimensions and areas of<br />
the cutting shall be measured correct upto two places of decimals of<br />
a metre and square metre respectively and the quantity worked out<br />
correct up to two places of decimals of a cubic metre.<br />
When the classification of the strata changes, the contractor shall<br />
bring this to the notice of the Engineer who will then verify and if<br />
necessary take levels for the changed strata for purpose of<br />
measurement.<br />
The engineer at his option may direct dead-men to be left at such<br />
intervals as he may indicate for purpose of measuring the depths<br />
and other dimensions either for initial measurements or for
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 259<br />
checking. Deduction shall be made for these dead-men. These shall<br />
be removed when no longer required and the deduction restored<br />
thereafter. If the dead-men are not removed and used in the work or<br />
otherwise disposed of as directed by the Engineer within 15 days of<br />
the date of check measurement, the Engineer shall have the right to<br />
remove then at the contractor’s cost. If for any reason the dead-men<br />
are damaged at the time of measurement the measuring or check<br />
measuring officer shall estimate the quantity of earthwork at his<br />
discretion and such estimate shall be final.<br />
4.0 Providing earthwork in embankment with approved materials<br />
4.1 GENERAL :<br />
obtained from contractor’s own source including all lifts and leads,<br />
laying in layers of 20 cm. to 30 cm. thickness, breaking clods,<br />
dressing to the required lines, curves, grades and section, watering<br />
and compacting to 97% Modified Proctor Density Complete.<br />
The work shall include preliminaries of clearing site, setting out and<br />
preparing the ground and thereafter forming embankment for the<br />
<strong>road</strong> with approved materials obtained from contractor’s own source,<br />
laying in layers, watering and compacting to the required density and<br />
lines, curves, grades, cross section and dimensions shown on the plan<br />
or as directed by the Engineer with due allowance for shrinkage.<br />
4.2 CLEARING SITE :<br />
The ground over which embankment is to be formed shall be cleared<br />
of all trees (unless cutting of trees of over 30 cm. girth is provided as<br />
a separate item vide Rd.1), brushwood, loose stones, vegetation,<br />
bushes, stumps and all other objectionable materials, under this item.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 260<br />
Roots of trees shall be grubbed to a depth of at least 15 cm. below the<br />
original ground surface and at least 30 cm. below the formation level<br />
whichever is deeper. The holes dug up for grubbing roots etc. shall be<br />
filled with excavated materials in layers of 15 cm. and compacted.<br />
Brushwood, stumps, vegetation etc. shall be cut flush with the ground<br />
materials obtained from clearing site shall be dealt with according to<br />
Clause No.3.2 of Particular Specifications.<br />
4.3 SETTING OUT :<br />
After the site is cleared, setting out shall be done as laid down in<br />
Clause No. 3.3 of Particular Specification. Profiles shall be set up<br />
with stout poles to mark the centre and edges of the formation with<br />
the top levels of formation clearly marked by paint or cut and the<br />
slopes with string and pegs at every 80 metres on straight portion and<br />
10 m. or less on curves or as directed by the Engineer. Toe line may<br />
be marked with pick marks. Longitudinal and cross section levels shall<br />
be taken recorded and checked for measurements and signed by the<br />
contractor or his representative.<br />
All the materials and labour required for this item shall be supplied<br />
and profiles, B.Ms. etc. put up by the contractor. These shall be<br />
covered by the rate.<br />
4.4 MATERIALS :<br />
Profiles, pegs, bench marks and other marks shall be maintained<br />
without any disturbance as long as they are required.<br />
After utilising, for the embankment all the useful and acceptable<br />
materials obtained from the contractor’s own source within the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 261<br />
specified leads the contractor shall obtained additional materials from<br />
Contractor’s own source. Satisfactory soil murum or a mixture of soil,<br />
sand, murum, gravel, small boulders or rubble shall normally be<br />
acceptable. Soils having laboratory dry density less than 1.75 gm./cc.<br />
shall not be used in embankment. Only the materials considered<br />
suitable by the Engineer shall be used for the bank. Rejected materials<br />
shall not be put into the bank nor brought to the work site. Perishable<br />
materials such as stumps, pieces of wood, roots, rubbish, etc. and<br />
such other materials as will effect the stability of the embankment shall<br />
not be used. Soils with humus of grass will be permitted to be used<br />
as surface covering for the bank slopes to a thickness of not more<br />
than 30 cm. (about 12").<br />
4.5 EQUIPMENT :<br />
Pickaxes, crowbars, phawras and pans may be used for manual work.<br />
Scrapers, dozers, graders, shovels, dumpers, trucks, trolleys etc. may<br />
be used for mechanised work. 8-10 tonne vibratory roller giving a<br />
pressure required to obtain the specified density may be used for<br />
compaction. Mechanically driven tankers may be used for watering.<br />
4.6 CONSTRUCTION METHOD :<br />
4.6.1 Diversion :<br />
If diversions barricading and signals are found to be necessary, they<br />
shall be provided as detailed in specification No. BR. 1 of Standard<br />
Specifications of Red Book.<br />
4.6.2 Preparing the ground for laying bank :<br />
Before any material is laid for the bank the ground shall be cleared of<br />
all rubbish etc. and the holes if any, filled up. When the embankment
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 262<br />
is to be laid on hill sides or slopes, the existing slopes shall be<br />
ploughed deeply. If the cross slopes are steeper than 1 in 3, steps with<br />
reverse slope shall be cut into the slopes to give proper hold and<br />
seating to the bank as directed by the Engineer. On surfaces flatter<br />
than 1 in 15 no special surface treatment such as cutting steps shall be<br />
necessary. The top 15 cm. (about 6") of soil shall be scarified and<br />
watered if directed and compacted to the same density as specified for<br />
the embankment before any material is laid for the bank-work.<br />
When the embankment is to be placed over an existing <strong>road</strong> or other<br />
hard surface which is within 15 cm. (about 6") of the finished<br />
formation, the <strong>road</strong> or other hard surface shall be scarified to a<br />
minimum depth of 15 cm. (about 6").<br />
The rate for embankment includes all the operations for preparing the<br />
bed for laying the bank.<br />
4.6.3 Laying the bank :<br />
Embankment material shall be placed in successive horizontal layers<br />
of 20 cm. to 30 cm. (about 8" to 12") depth, extending to the full<br />
width of the embankment including the slopes at the level of the<br />
<strong>particular</strong> layer and 30 cm. (about 12") more on both sides to allow<br />
compaction of the full specified section. The extra loose stuff at the<br />
edges shall be trimmed later after completion of the bank work<br />
without extra cost leaving the correct section fully compacted.<br />
Keeping the width of the bank initially less and widening it later by<br />
dumping loose earth on the slopes shall not be permitted as the<br />
additional width and slopes will remain loose and uncompacted.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 263<br />
4.6.4 Watering:<br />
Similar procedure to extend the embankment by dumping the material<br />
longitudinally shall also not be allowed. When placing the bankwork<br />
in 20 cm. to 30 cm. layers is not feasible as in water or over slopes too<br />
steep to operate the construction equipment, the embankment may be<br />
constructed in one layer to the minimum level at which equipment can<br />
be operated and above such a level, the embankment shall be made<br />
up in layers of specified thickness. When boulders, broken stones and<br />
similar hard materials are mixed up with the embankment materials<br />
care shall be taken to see that they are distributed uniformly into the<br />
bank and that no hollows are left near them. No stone or hard<br />
material shall project above the top of any layer. Each layer of<br />
embankment shall be watered, levelled and compacted as specified<br />
hereinafter, before the succeeding layer is placed. The surface of the<br />
embankment shall, at all times during construction, be maintained at<br />
such a cross fall as will shed water and prevent ponding. If bridges<br />
and culverts on the <strong>road</strong> are not completed in advance of bankwork, a<br />
length of 15 m. to 30 m. (about 50' to 100') bank shall be left on each<br />
side of the structure and these lengths shall be dealt with later for<br />
placing the bank work.<br />
If the bank material contains less than the optimum moisture water<br />
shall be added to the material in the borrow pits or alternatively in the<br />
loose layers of the embankment to bring the moisture uniformly upto<br />
requirement. If some moisture is likely to be evaporated in transit or in<br />
the bank before compaction adequate water in excess shall be added<br />
to allow for the loss. If the material contains more than the required<br />
moisture, it shall be allowed to dry until the moisture is reduced to the<br />
required extent. If due to wet weather etc., the moisture content of the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 264<br />
soil cannot be reduce to the appropriate amount by exposure, bank<br />
work shall be suspended till suitable conditions prevail without<br />
contractor's claiming any compensation.<br />
Water to be used shall be free of from harmful elements which may<br />
cause heavy efflorescence etc., and approved by the Engineer. The<br />
contractor shall make his own arrangement for getting adequate<br />
quantity of acceptable water.<br />
4.6.5 Compaction:<br />
When a loose layer is levelled manually of mechanically and<br />
moistured or dried to a uniform moisture content suitable for<br />
maximum compaction, it shall be compacted by power roller, sheeps<br />
foot rollers or vibratory roller or heavy haling or dozing equipment to<br />
give the specified 97% of the Modified Proctor Density. If on testing,<br />
the density is found to be less than 97% of the Modified Proctor<br />
Density the contractor shall do additional compaction necessary to get<br />
the specified density after adding water if required. The density can<br />
not be improved on reasonable efforts, the work may be accepted as<br />
substandard by the Engineer. If he thinks it not harmful for the<br />
purpose, at a reduce rate. Where the specified density is imperative<br />
the work shall be removed and redone by the contractor at his own<br />
cost to give the specified density.<br />
Where the material allowed to be used is excessively stony or sandy so<br />
that it will not compact to the required density where such material is<br />
otherwise acceptable for embankment construction the Engineer may<br />
waive the tests for stony or sandy portions where the required test<br />
results are contained. Each layer shall be compacted fully before the<br />
next layer is laid.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 265<br />
Proper sequence of all component operation shall be maintained to<br />
give individual progress.<br />
To all for subsequent settlement, the finished level or of the<br />
embankment may be kept higher than the specified level by 1 cm. for<br />
each metre of the height of the bank and this, if provided, will be paid<br />
for.<br />
The hauling equipment, animals, labour etc., shall be made to go<br />
over the bank as far as possible, to get the initial compaction. Care<br />
shall be taken for getting good compaction behind abutments returns<br />
and wings walls, etc.<br />
Bank-work in areas not accessible to rollers such as those adjoining<br />
bridges, culverts and other work, shall be carried out independently of<br />
the main embankment and shall be have the layers placed in 10 cm.<br />
to 15 cm. (about 4" to 6") height and each layer shall be moistened<br />
and thoroughly compacted with mechanical or manual tampers.<br />
Embankment shall be brought up simultaneously in equal layers on<br />
each side and compacted carefully to avoid unequal pressure etc.<br />
4.7 PROTECTION:<br />
Proper care shall be taken to ensure that the method of operation and<br />
compaction of the bank-word does not cause damage or undue strain<br />
to any structural element. Embankment over and around bridges or<br />
culverts shall be of approved materials and carefully placed and<br />
compacted. The contractor shall take all precautions necessary for the<br />
protection of the bank-work by diversion of streams, local surface<br />
drainage, rain water etc. likely to damage the bank. Any damage to<br />
the bank-work due to no protection or inadequate protection shall be<br />
made good by the contractor at his own cost. Conveyance of materials<br />
shall not cause obstruction or nuisance to the nearby property owners<br />
and traffic.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 266<br />
4.8 FINISHING:<br />
The embankment shall be finished and dressed smooth and even in<br />
conformity with the alignment, levels, cross-sections and dimensions<br />
shown on the drawings with due allowance for shrinkage. On curves,<br />
section shall be provided with super elevation and increased widths as<br />
shown on the plans or directed by the Engineer. All damages caused<br />
by rain, flood or any other reason shall be made good in the finishing<br />
operations. The <strong>road</strong> land which shall be cleared of all debris and<br />
ugly spots near camping areas etc. for which the contractor or his men<br />
were responsible.<br />
4.9 MAINTENANCE:<br />
4.10 TESTS:<br />
The contractor shall be responsible for maintaining the bank-work<br />
satisfactorily at his own cost till finally accepted including making good<br />
any damages.<br />
1) Tests shall be made to determine the maximum density of the<br />
material to be used by the Proctor method before starting the<br />
work.<br />
2) Density tests shall be carried out for the bankwork during the<br />
progress of the work. One set of three core samples for every<br />
3,000 sq.m. area of each layer of bank work shall be taken<br />
and tested. The average density shall not be less than 97% of<br />
the Proctor density. A deviation of 80 kg./cu.m. for fine and<br />
160 Kg./cu.m. for coarse grained soils shall be permitted in<br />
dry density in individual sample if the average density reaches<br />
upto 97% Modified Proctor density for each set.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 267<br />
4.11 ITEM TO INCLUDE :<br />
1) Clearing site.<br />
2) Setting out alignment including necessary labour and materials<br />
and maintaining it as long as required.<br />
3) Preparing the ground for laying the embankment.<br />
4) Providing and maintaining diversions if necessary unless provided<br />
as a separate item in the tender.<br />
5) Obtaining the embankment materials including all lifts and leads<br />
and laying the bank in layers, watering, compaction and tests<br />
and Royalties, fees, Quarry Permit etc. if any.<br />
6) Protecting and maintaining the bank.<br />
7) Finishing the embankment.<br />
8) All labour, materials, use of equipment, tools and plants<br />
necessary for completing the work satisfactorily.<br />
4.12 MODE OF MEASUREMENT AND PAYMENT :<br />
The contract rate shall be per cu. metre of the finished bank work.<br />
Measurements shall normally be taken by levelling sections and<br />
chaining distances between them.<br />
The measurements of the sections shall be limited to the dimensions<br />
shown on the drawings or those ordered by the Engineer in writing.<br />
The dimensions shall be recorded correct upto two places of decimals<br />
of a metre. The sectional areas shall be worked out correct upto two<br />
places of decimals of a sq.metre. The quantity shall be worked out<br />
correct upto two places of decimals of a cu.m. by the average end<br />
area method.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 268<br />
The volume of bank thus calculated shall be reduced by 5 percent for<br />
the purpose of payment when the measurements are taken for<br />
running bills and by 1 percent in final measurements.<br />
If outside materials have been used in the portions of the bankwork<br />
where materials from cutting were to be used the outside material<br />
shall be deemed to have been obtained from the cutting as specified<br />
in those item and paid for under those items only.<br />
The final quantity to be paid for under this item shall be the total<br />
quantity of bankwork reduced by 1 percent less the quantity to be<br />
paid for using materials from cutting.<br />
5.0 GRANULAR SUB-BASE<br />
5.1 SCOPE:<br />
5.2 MATERIALS:<br />
This work shall consist of laying and compaction well-graded material<br />
on prepared subgrade in accordance with the requirements of these<br />
<strong>specifications</strong>. The material shall be laid in one or more layers as sub-<br />
base and upper sub-base (termed as sub-base hereinafter) as<br />
necessary according to lines, grades and cross- sections shown on the<br />
drawings or as directed by the Engineer.<br />
5.2.1 The material to be used for the work shall be natural sand, murum,<br />
gravel, crashed stone or combination thereof depending upon the<br />
grading required. Materials like crushed slag, crushed concrete, brick<br />
metal and kankar may be allowed only with the specific approval of the<br />
Engineer. The material shall be free from organic or other deleterious<br />
constituents and conform to one of the three grading given in Table-1.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 269<br />
While the in Table-1 are in respect of close-graded granular sub-base<br />
materials. One each for maximum particle size of 75mm, 53mm and<br />
26.5mm, the corresponding gradings for the coarse graded materials<br />
for each of the three maximum particle sized are given at Table-2. The<br />
grading to be adopted for a project shall be specified in the contract.<br />
5.2.2 PHYSICAL REQUIREMENT:<br />
The material shall have a 10 percent fines value of 50kN or more (for<br />
sample in soaked condition) when tested in compliance with BS: 812<br />
(Part-III). The water absorption volume of the coarse aggregate shall be<br />
determined as per IS: 2386 (Part-III); If this value is greater than 2<br />
percent, the soundness test shall be carried out on the material<br />
delivered to site as per IS: 383. For grading II & III materials, the CBR<br />
shall be determined at the density and moisture content likely to be<br />
developed in equilibrium conditions which shall be taken a being the<br />
density relating to a uniform air voids content of 5 percent.<br />
TABLE – 1<br />
GRADING FOR CLOSE GRADED GRANULAR SUB-BASE MATERIALS<br />
IS SIEVE PERCENT BY WEIGHT PASSING THE IS SIEVE<br />
DESIGNATION GRADING-I GRADING-II GRADING-III<br />
75.0 MM 100 --- ---<br />
53.0 MM 80 – 100 100 ---<br />
26.5 MM 55 – 90 70 – 100 100<br />
9.50 MM 35 – 65 50 – 80 65 – 95<br />
4.75 MM 22 – 55 40 – 65 50 – 80<br />
2.36 MM 20 – 40 30 – 50 40 – 65<br />
0.425 MM 10 – 25 15 – 25 20 – 35<br />
0.075 MM 3 – 10 3 – 10 3 – 10<br />
CBR VALUE<br />
(Minimum)<br />
30 25 20
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 270<br />
NOTE:<br />
The material passing 425 micron (0.425mm) sieve for all the three<br />
gradings when tested according to IS:2720 (Part-5) shall have liquid<br />
limit plasticity index not more than 25 and 6 percent respectively.<br />
5.3 STRENGTH OF SUB-BASE:<br />
It shall be ensured prior to actual execution that the material to be used<br />
in the sub-base satisfies the requirements of CBR and other physical<br />
requirements when compacted and finished.<br />
When directed by the Engineer, this shall be verified by performing CBR<br />
tests in the laboratory as required on specimens remoulded at field dry<br />
density and moisture content and any other tests for the “equality” of<br />
materials as may be necessary.<br />
5.4 CONSTRUCTION OPERATIONS:<br />
5.4.1 Preparation of subgrade:<br />
Immediately prior to the laying of sub-base, the subgrade already<br />
finished as to clause 301 or 305 of MORT & H Specification and other<br />
extraneous matter, lightly sprinkled with water if necessary and rolled<br />
with two passes of 80 – 100 kN smooth wheeled roller.<br />
5.4.2 Spreading and Compacting: The sub base material of grading<br />
specified in the contract shall be spread on the prepared sub – grade<br />
with the help of a motor grader of adequate capacity, its blade having<br />
hydraulic controls suitable for initial adjustment and maintain the<br />
required slope and grade during the operation or other means as<br />
approved by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 271<br />
When the sub-base material consists of combination of materials<br />
mentioned in Clause 401.2.1 of MORT & H Specification (Fourth<br />
Revision), mixing shall be done mechanically by the mix-in-place<br />
method.<br />
Manual mixing shall be permitted only where the width of laying not<br />
adequate for mechanical operations as in small – sized jobs. The<br />
equipment used for mix-in-place construction shall be rotavator or<br />
similar approved equipment capable of mixing the material to the<br />
desired degree. If so desired by the Engineer, trial runs with the<br />
equipment shall be carried out to establish its suitability for the work.<br />
Moisture content of the loose material shall be checked in accordance<br />
with IS:2720 (Part-2) and suitably adjusted by sprinkling additional<br />
water a truck mounted or trailer mounted water tank and suitable for<br />
applying water uniformly and at controlled quantities to variable widths<br />
of surface or other means approved by the Engineer so that, at the time<br />
of compaction, it is from 1 Percent above to 2 percent below the<br />
optimum moisture content corresponding to IS:2720 (Part-8). While<br />
adding water, due allowance shall be made for evaporation losses.<br />
After water has been added, the material shall be processed by<br />
mechanical or other approved means like disk harrows, rotavators until<br />
the layer is uniformly wet.<br />
Immediately, thereafter, rolling shall start. If the thickness or compacted<br />
layer does not exceed 100mm, a smooth wheeled roller of 80 to 100<br />
kN weight may be used. For a compacted single layer upto 225 mm<br />
the compaction shall be done with the help of a vibratory roller of<br />
minimum 80 to 100kN static weight with plain drum or pad foot drum<br />
or heavy pneumatic tyred roller of minimum 200 to 300 kN weight
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 272<br />
having a minimum tyre pressure of 0.7 MN/m2 or equivalent capacity<br />
roller capable of achieving the required compaction. Rolling shall<br />
commence at the lower edge and proceed towards the upper edge<br />
longitudinally for portions having unidirectional cross fall and superelevation<br />
and shall commence at the edges and progress towards the<br />
center for positions having cross fall on both sides.<br />
Each pass or the roller shall uniformly overlap not less than one-third of<br />
the track made in the preceding pass. During rolling, the grade and<br />
crossfall (camber) shall be checked and any high spots or depressions,<br />
which become apparent, corrected by removing or adding fresh<br />
material. The speed of the roller shall not exceed 5 km.per hour.<br />
Rolling shall be continued till the achieved is at least 98 percent of the<br />
maximum dry density for the material determined as per IS:2720<br />
(Part-8). The surface of any layer of material on completion of<br />
compaction shall be well closed, free from movement under<br />
compaction equipment and from compaction planes, ridges, cracks or<br />
loose material. All loose, segregated or otherwise defective areas shall<br />
be made good to the full thickness of layer and re-compacted.<br />
5.5 SURFACE FINISH AND QUALITY CONTROL OF WORK:<br />
The surface finish of construction shall conform to the requirements of<br />
Clause 902 of MORT &H Specifications.<br />
Control on the quality of materials and <strong>works</strong> shall be exercised by the<br />
Engineer in accordance with Section 900.<br />
5.6 ARRANGEMENTS FOR TRAFFIC:<br />
During the period of construction, arrangement of traffic shall be<br />
maintained in accordance with Clause 112 of MORT & H<br />
Specifications.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 273<br />
5.7 MEASUREMENT FOR PAYMENT:<br />
5.8 RATE:<br />
Granular sub-base shall be measured as finished work in position in<br />
cubic metres.<br />
The protection of edges of granular sub-base extended over the full<br />
formation as shown in the drawing shall be considered incidental to the<br />
work of providing granular sub-base and as such no extra payment<br />
shall be made for the same.<br />
The contact unit rate for granular sub-base shall be payment in full for<br />
carrying out the required operations including full compensation for:<br />
1) Making arrangements for traffic to Clause 112 of MORT & H<br />
Specifications except for initial treatment to verges, shoulders<br />
and construction or diversions:<br />
2) Furnishing all materials to be incorporated in the work including<br />
all royalties, fees, rents where necessary and all leads and lifts:<br />
3) All labour, tools, equipment and incidentals to complete the<br />
work to the <strong>specifications</strong>,<br />
4) Carrying out the work in part widths of <strong>road</strong> where directed and<br />
5) Carrying out the required tests for quality control.<br />
6.0 WET MIX MACADAM SUB – BASE / BASE :<br />
6.1 SCOPE :<br />
This work shall consist of laying and compacting clean, crushed,<br />
graded aggregate and granular material, premixed with water, to a<br />
dense mass on a prepared subgrade/sub-base/base or existing<br />
pavement as the case may be in accordance with the requirements of<br />
the specification. The material shall be laid in one or more layers as<br />
necessary to lines, grades and cross sections shown on the approved<br />
drawings or as directed by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 274<br />
The thickness of a single compacted Wet Mix Macadam layer shall be<br />
less than 75 mm. When vibrating or other approved types of<br />
compacting equipment are used, the compacted depth of a single layer<br />
of the sub-case course may be increase to 200 mm upon approval of<br />
the Engineer.<br />
6.2 MATERIALS :<br />
6.2.1 Physical requirement :<br />
SL.<br />
NO.<br />
Coarse aggregate shall be crushed stone. If crushed gravel/shingle is<br />
used not less than 90 percent by weight of the gravel/shingle pieces<br />
retained on 4.75 mm sieve shall have at least two fractured faces. The<br />
aggregates shall conform to the physical requirements set forth in the<br />
following Table – 1.<br />
TABLE – 1<br />
PHYSICAL REQUIREMENTS OF COARSE AGGREGATES<br />
FOR WET MIX MACADAM FOR BASE COURSES<br />
1. *Loss Angles Abrasion<br />
Value or<br />
2. * Aggregate impact<br />
value<br />
3. Combined flakiness and<br />
Elongation<br />
(total)<br />
indices<br />
TEST TEST METHOD REQUIREMENTS<br />
IS : 2386 (Part – IV) 40% Maximum<br />
IS : 236 (Part –IV) or<br />
IS : 5640<br />
30% Maximum<br />
IS : 2386 (Part – I) 30% Maximum**<br />
* Aggregates may satisfy requirement of either of the two tests.<br />
** To determine this combined proportion, the flaky stone from a<br />
representative sample should first be separated out. Flakiness index is<br />
weight of flaky stone metal divided by weight of stone sample. Only the<br />
elongated particles be separated out from the remaining (non-flaky)
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 275<br />
stone metal. Elongation index is weight of elongated particles divided<br />
by total non-flaky particles. The value of flakiness index and elongation<br />
index so found are added up.<br />
6.2.2 Grading requirements :<br />
The aggregates shall conform to the grading given below:<br />
TABLE – 2<br />
GRADING REQUIRMENTS OF AGGREGATES FOR WET MIX MACADAM<br />
SIEVE DESIGNATION PERCENT PASSING<br />
53 mm 100<br />
45 mm 95 -100<br />
26.5 mm ---<br />
22.4 mm 60 – 80<br />
11.2 mm 40 – 60<br />
4.75 mm 25 – 40<br />
2.36 mm 15 -30<br />
600 microns 8 -22<br />
75 microns 0-8<br />
Materials finer than 425 micron shall have Plasticity Index (PI) not<br />
exceeding 6.<br />
The final gradation approved within these limits shall be well graded<br />
from coarse to fine and shall not vary from the low limit on one sieve to<br />
the high limit on the adjacent sieve or vice versa.<br />
6.2.3 Construction operation:<br />
6.2.3.1 Preparation of Base:<br />
Clause 404.3.1 of MORT & H shall apply.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 276<br />
6.2.3.2 Provisional of lateral confinement of aggregates:<br />
While constructing wet mix macadam, arrangement shall be made for<br />
the lateral confinement of wet mix. This shall be done by laying<br />
materials in adjoining shoulders along with that the wet mix macadam<br />
layer and following the sequence of operations described in Clause<br />
407.4.1 of MORT & H.<br />
6.2.3.3 Preparation of mix :<br />
Wet – mix macadam shall be prepared in an approved mixing plant of<br />
suitable capacity having provision for controlled addition of water and<br />
force/positive mixing arrangement like pugmill or pan type mixer of<br />
concrete batching plant. For small quantity of wet mix work, the<br />
Engineer may permit the mixing to be done in concrete mixers.<br />
Optimum moisture for mixing shall be determined in accordance with<br />
IS:2720 (Part -8) after replacing the aggregate fraction retained on<br />
22.4 mm sieve with material of 4.75 mm to 22.4 size. While adding<br />
water, due allowance should be made for evaporation losses. However,<br />
at the time of compaction, water in the wet mix should not very from<br />
the optimum value by more than agreed limits. The mixed material<br />
should be uniformly wet and no segregation should be permitted.<br />
6.2.3.4 Spreading of mix :<br />
Immediately after mixing, the aggregates shall be spread uniformly and<br />
evenly upon the prepared subgrade/sub-base/base in required<br />
quantities. In no case should these be dumped in heaps directly on the<br />
area where these are to be laid nor shall their hauling over a partly<br />
completed stretch be permitted.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 277<br />
The mix may be spread either by a motor grader or a paver finisher or<br />
motor grader. For portions where mechanical means cannot be used,<br />
manual means as approved by the Engineer shall be used. The motor<br />
grade shall be capable of spreading the material uniformly all over the<br />
surface. Its blade shall have hydraulic control suitable for initial<br />
adjustments and maintaining the same so as to achieve the specified<br />
slope and grade.<br />
The paver finisher shall be self propelled having the following features:<br />
i) Moving hoppers and suitable distribution mechanism<br />
ii) The screed shall have tamping and vibrating arrangement for<br />
initial compaction to the layer as it is spread without rutting or<br />
otherwise marring the surface profile.<br />
iii) The paver shall be equipped with necessary control mechanism<br />
so as to ensure that the finished surface is free from surface<br />
blemishes.<br />
The surface of the aggregate shall be carefully checked with templates<br />
and all high or low spots remedied by removing or adding aggregate<br />
as may be required. The layer may be tested by depth blocks during<br />
construction. No segregation of large and fine particles should be<br />
allowed. The aggregates as spread should be of uniform gradation<br />
with no pockets of fine/coarse materials.<br />
6.2.3.5 Compaction :<br />
After mix have been laid to the required thickness, grade and cross<br />
fall/camber, the same shall be uniformly compacted to the full depth<br />
with suitable roller. If the thickness of single compacted layer does not<br />
exceed 100mm, a smooth wheel roller of 80 to 100 kN weight may be<br />
used . For a compacted roller layer upto 200mm the compaction shall
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 278<br />
be done with the help of vibratory roller of minimum static weight of 80<br />
to 100kN of equivalent capacity roller. The speed of the roller shall not<br />
exceed 5 k.m./h.<br />
In portions having unidirectional cross fall/super elevation, rolling shall<br />
commence from the lower edge and progress gradually towards the<br />
upper edge. Thereafter roller should progress parallel to the centre line<br />
of the <strong>road</strong>, uniformly overlapping each preceding track by at least one<br />
third width until the entire surface has been rolled. Alternate strips of<br />
the roller shall be terminated in stops at least 1 m. away from any<br />
preceding stop.<br />
In portions in camber, rolling should begin at the edge with the roller<br />
running forward and backward until the edges have been firmly<br />
compacted. The roller shall then progress gradually towards the centre<br />
parallel to the centre line of the <strong>road</strong> uniformly overlapping each of the<br />
preceding tract by at least one third width until the entire surface has<br />
been rolled.<br />
Any displacement occurring as a result of reversing of the direction of<br />
the roller or from any other cause shall be corrected at once as<br />
specified and or removed the made good.<br />
Along forms, kerbs, walls or other places not accessible to the roller,<br />
the mixture shall be thoroughly compacted with mechanical tampers or<br />
a plate compactor. Skin patching of an area without scarifying the<br />
surface to permit proper bonding of the added material shall not be<br />
permitted.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 279<br />
Rolling should not be done when the sub – grade is soft or yielding or<br />
when it causes a wave – like motion in the sub-base/base course or sub<br />
– grade. If irregularities develop during rolling which exceed 12 mm<br />
when tested with a 3 metre straight edge, the surface should be loosed<br />
and premixed material added or removed as required before rolling<br />
again so as to achieve a uniform surface conforming to the desired<br />
grade and cross fall. In no case should the use of unmixed material be<br />
permitted to make up the depressions.<br />
Rolling should be continued till the density achieved is at least 98% of<br />
the maximum dry density for the material as determined by the method<br />
outlined in IS:2720 (Part 8).<br />
After completion, the surface of any finished layer should be well<br />
closed, free from movement under compaction equipment or any<br />
compaction planes, ridges, cracks and loose material. All loose,<br />
segregated or otherwise defective areas shall be made good to the full<br />
thickness of the layer and re-compacted.<br />
6.2.3.6 Setting and drying :<br />
After final compaction of wet mix macadam course, the <strong>road</strong> shall be<br />
allowed to dry for 24 hours.<br />
6.2.4 Opening to traffic :<br />
Preferably no vehicular traffic of any kind should be allowed on the<br />
finished wet-mix macadam surface till it has dried and the wearing<br />
course laid.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 280<br />
6.2.5 Surface Finish and Quality Control of work :<br />
6.2.5.1 Surface evenness :<br />
The surface finish of construction shall conform to the requirements of<br />
Clause 902.<br />
6.2.5.2. Quality control :<br />
Control of the quality of materials and shall be exercised by the<br />
Engineer in accordance with Section 900 of M.O.R.T. & H.<br />
6.2.6 Rectification of Surface irregularity :<br />
Where the traffic irregularity of the wet mix macadam course exceeds<br />
the permissible tolerance or where the course is otherwise defective due<br />
to sub-grade soil getting mixed with the aggregates, the full thickness<br />
of the layer shall be scarified over the affected area, re-shaped with<br />
added premixed material or removed and replace with fresh premixed<br />
material as applicable and re-compacted in accordance with Clause<br />
406.3 The area treated in aforesaid manner shall not be less than 5 m.<br />
long and 2 m. wide. In no case shall depressions be filled up with<br />
unmixed and ungraded material or fines.<br />
6.2.7 Arrangement for traffic :<br />
During the period of construction, arrangement of traffic shall be done<br />
as per Clause 112.<br />
6.2.8 Measurement for payment :<br />
Wet mix macadam shall be measure as finished work in position in<br />
cubic metres.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 281<br />
6.2.9 Rates :<br />
The contract unit rate for wet mix macadam shall be payment in full for<br />
carrying out the required operations including compensation for all<br />
components listed Clause 401.8 of MORT&H Specifications.<br />
7.0 PLATE LOAD TESTS :<br />
7.1 To conduct plate load test on new WMM surface by gravity method,<br />
using girder loading platform, mild steel plate of required size with<br />
minimum thickness of 25 mm and applying heavy loads by sand<br />
bags, pig iron, pig lead etc. to transfer the load to serial plate and to<br />
record the settlement using suitable dial gauges.<br />
The test shall be paid once at one place on one layer till the required<br />
results are achieved irrespective of number of times test carried out.<br />
7.2 To conduct the plate load test on new WMM surfaces, replacing<br />
loading platform by loaded truck and jacking against reaction by<br />
using hydraulic dial gauges to record settlement.<br />
The test shall be paid once at one place on one layer till the required<br />
test results are achieved irrespective of number of times test carried<br />
out.<br />
8.0 TACK COAT<br />
8.1 SCOPE<br />
This work shall consist of application of a single coat of low viscosity<br />
liquid bituminous material to an existing <strong>road</strong> surface preparatory to<br />
the superimposition of a bituminous mix, when specified in the contract<br />
or instructed by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 282<br />
8.2 MATERIALS<br />
8.2.1 Binder<br />
The binder used for tack coat shall be bitumen emulsion complying<br />
with IS 8887 of a type and grade as specified in the contract or as<br />
directed by the Engineer. The use of cutback bitumen as per IS 217<br />
shall be restricted only for sites at sub-zero temperatures or for<br />
emergency applications as directed by the Engineer.<br />
8.3 WEATHER AND SEASONAL LIMITATIONS<br />
Bituminous material shall not be applied to a wet surface or during a<br />
dust storm or when the weather is foggy, rainy or windy or when the<br />
temperature in the shade is less than 10 0 C. Where the tack coat<br />
consists of emulsion, the surface shall be slightly damp, but not wet.<br />
Where the tack coat is of cutback bitumen, the surface shall be dry.<br />
8.4 CONSTRUCTION:<br />
8.4.1 Equipment:<br />
The tack coat distributor shall be a self propelled or towed bitumen<br />
pressure sprayer with flow meter arrangement, equipped for spraying<br />
the material uniformly at a specified rate. Hand spraying of small<br />
areas, inaccessible to the distributor, or in narrow strips, shall be<br />
sprayed with a pressure hand sprayer, or as directed by the Engineer.<br />
8.4.2 Preparation of base:<br />
The surface on which the tack coat is to be applied shall be clean and<br />
free from dust, dirt and any extraneous material, and be otherwise<br />
prepared in accordance with the requirements of Clause-501.8 and<br />
902 of MORT&H <strong>specifications</strong> (Fourth Revision) as appropriate.<br />
Immediately before the application of the tack coat, the surface shall be<br />
swept clean with a mechanical broom, and high pressure air jet, or by<br />
other means as directed by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 283<br />
8.4.3 Application of Tack Coat :<br />
The application of tack coat shall be at the rate as specified in the<br />
Schedule, and shall be applied uniformly. The normal range of<br />
spraying temperature for a bituminous emulsion shall be 20 0 C to 70 0 C<br />
and for cutback 50 0 C to 80 0 C if RC-70/ MC-70 grade is used. Where<br />
a geosynthetic is proposed for use, the provisions of Clauses 703.3.2<br />
and 703.4.4 of MORT&H <strong>specifications</strong> shall apply. The method of<br />
application of the tack coat will depend on the type of equipment to be<br />
used, size of nozzles, pressure at the spray bar, and speed of forward<br />
movement. The contractor shall demonstrate at a spraying trial, that the<br />
equipment and method to be used is capable of producing a uniform<br />
spray, within the tolerances specified. The bitumen sprayer shall have a<br />
flow meter arrangement (duly calibrated) for measurement/rate of<br />
spraying and reconciliation of material.<br />
Where the material to receive an overlay is a freshly laid bituminous<br />
layer, that has not been subjected to traffic, or contaminated by dust, a<br />
tack coat is not mandatory where the overlay is completed within two<br />
days.<br />
8.4.4 Curing of tack coat:<br />
The tack coat shall be left to cure until all the volatiles have evaporated<br />
before any subsequent construction is started. No plant or vehicles shall<br />
be allowed on the tack coat other than those essential for the<br />
construction.<br />
8.5 QUALITY CONTROL OF WORK<br />
For control of the quality of materials supplied and the <strong>works</strong> carried<br />
out, the relevant provisions of Section 900 of MORT&H <strong>specifications</strong><br />
(Fourth Revisions) shall apply.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 284<br />
8.6 ARRANGEMENT FOR TRAFFIC:<br />
During the period of construction, the arrangement for traffic shall be<br />
made in accordance with the provisions of Clause 112 of MORT&H<br />
<strong>specifications</strong> (Fourth Revision).<br />
8.7 MEASUREMENT FOR PAYMENT:<br />
8.8 RATE:<br />
Tack coat shall be measured in terms of surface area of application in<br />
square metres.<br />
The contract unit rate for tack coat shall be payment in full for carrying<br />
out the required operations including for all components listed in<br />
Clause 401.8 (i) to (v) of MORT&H <strong>specifications</strong> (Fourth Revision) and<br />
as applicable to the work specified in these <strong>specifications</strong>. The rate shall<br />
cover the provision of tack coat as per Schedule “A”.<br />
9.0 BITUMINOUS BOUND MACADAM:<br />
Providing and laying Bitumen Bound Macadam surface in 75 thickness<br />
including supplying all materials, including metal and bitumen etc.,<br />
spreading 40 mm and 20 mm trap metal layers @ 9 cu.m./100 sq.m.<br />
and at 1.5 cu.m./100 sq.m., heating and spraying bitumen at the rate<br />
250 kg/100 sqm and spreading 12 mm size key aggregate @ 1.8<br />
cu.m./100 sq.m. providing and applying tack coat at the rate of 10<br />
kg/10 sqm. using 60-70 grade bitumen and compaction with vibratory<br />
roller etc. complete. Rate is excluding tack coat and tack coat shall be<br />
paid separately.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 285<br />
9.1 GENERAL :<br />
9.2 MATERIALS:<br />
9.2.1 Bitumen:<br />
The work consists of supply of all materials and labour required for<br />
providing and laying bituminous bound macadam surface for<br />
compacted thickness of 75 mm. This item include preparing the existing<br />
<strong>road</strong> surface to receive the bituminous bound macadam course i.e.<br />
application of tack coat, spreading of 40 mm size metal layers in<br />
required thickness with compaction with vibratory roller, spreading<br />
20mm thick, compaction with vibratory roller, heating and spraying<br />
bitumen with equipment plant etc. Spreading key aggregate 12mm.<br />
chips and final compaction with vibratory roller etc. complete. The work<br />
shall be finished in accordance with the requirements of this<br />
<strong>specifications</strong> and in close conformity with grades, lines, cross sections<br />
and thickness as per approved drawings or as directed by the Engineer.<br />
The bitumen shall be penetration grade 60/70 bituminous as per<br />
Indian Standards Specifications.<br />
9.3 AGGREGATES:<br />
The aggregates shall comprise of 40 mm size and broken stone<br />
satisfying standard <strong>specifications</strong> clause Rd. 22.3.2, Page 201 of<br />
edition 1979, 20 mm size & 12 mm size crush aggregate satisfying<br />
standard <strong>specifications</strong> clause Rd.41.3.2 Page 216 of edition 1979 for<br />
respective size of crush metal. The aggregate shall be free from<br />
disintegrated pieces, organic or other deleterious set for in table 500/4<br />
of Ministry of Surface Transport’s <strong>specifications</strong> for Road & Bridges<br />
edition June 1992.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 286<br />
9.4 PROPORTINONG OF MATERIALS :<br />
The quantities of aggregates and bitumen required for the work of<br />
75mm compacted bituminous bound macadam is detailed below:<br />
a. 40mm size hand broken metal 9.00 cum. Per 100 sq.mt.<br />
b. 20mm size crushed metal 1.50 cum.Per 100 sq.mt<br />
c. 12mm size key aggregate 1.80 cum.Per 100 sq.mt.<br />
d. Bitumen 250 kg. per 100 sq.mt.<br />
9.5 PREPARATIONS OF BASE:<br />
The <strong>road</strong> surface shall be swept clean of all dirt, dust and other loose<br />
and foreign matter. The work shall be performed on such widths and<br />
lengths as directed by Engineer-in-charge and may required scarifying<br />
of existing layer, filling of pot holes etc. The edge line may be marked<br />
with stakes (formed or murum or metal 25 cm 30 width)<br />
Tack Coat :<br />
The tack coat over cleaned surface shall be applied with mechanical<br />
sprayer with flow meter attachment.<br />
9.6 SPREADING AND COMPACTION:<br />
9.6.1 Spreading of 40 mm size metal:<br />
40 mm Size hand broken metal shall be spread evenly at the rate of 9<br />
cum per100 sq.m. of area so as to form uniform layer over the width of<br />
<strong>road</strong> specified on plans any foreign matter, organic matter, dust grades<br />
etc. shall be removed immediately. The sections shall be checked with<br />
camber board, straight edge batten etc. Any irregularities shall be<br />
made good by adding aggregates in case of depressions and removing<br />
aggregates from high spots.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 287<br />
Compaction of 40 mm size metal:<br />
The surface of 40mm metal layer after brought to necessary grades<br />
sections shall be rolled with the use of vibratory roller. Rolling shall<br />
commence from the edges and progress towards the center<br />
longitudinally except super elevated portion it shall progress from the<br />
lower to upper edge parallel to the centre line of pavement. When the<br />
roller has passed over the whole area as prepared once, any high<br />
spots or depressions which become apparent shall be corrected by<br />
removing or adding aggregates. The rolling shall then continued till the<br />
entire surface has been rolled to desired compaction such that there is<br />
no crushing of aggregates and all roller marks have been eliminated.<br />
The each pass of roller shall uniformly overlap not less than one third<br />
of the track made in the preceding pass.<br />
9.6.2 Spreading of 20 mm size metal :<br />
20mm size crushed metal shall be spread evenly at the rate of 1.5 Cum<br />
per 100 sq.mt. of area over the 40mm size hand broken metal.<br />
9.6.3 Compaction after spreading of 20 mm size metal :<br />
The surface of 20 mm metal layer after brought to necessary grades<br />
and sections shall be rolled with the use of 8 to 10 vibratory roller.<br />
Rolling shall be commence from the edges and progress towards the<br />
centre longitudinally except on super edge parallel to the centre line of<br />
pavement. When the roller has passed over the whole area as<br />
prepared once, any high spots or depressions which become apparent<br />
shall be corrected by removing or adding aggregates. The rolling shall<br />
then continued till the entire surface has been rolled to desired<br />
compaction such that there is no crushing of aggregates and all roller<br />
marks have been eliminated. The each pass of roller shall uniformly<br />
overlap not less than one third of the track made in the preceding pass.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 288<br />
9.6.4 Bitumen Application :<br />
Bitumen to be used shall be got approved from Engineer-in-charge.<br />
Bitumen of IS grade S-65 needs heating to a temperature range<br />
between 177 degrees to 191 degrees. Bitumen shall be applied<br />
through a pressure sprayer with flow meter attachment uniformly at the<br />
rate of 250 kg. Per 100 sq.mt. To ensure correct application of bitumen<br />
being sprayed, known dimensioned area be checked for use of<br />
bitumen and accordingly dosage may be increased or decreased as the<br />
case may be.<br />
9.6.5 Key Aggregates :<br />
9.6.6 Compaction:<br />
On completion of bitumen application, 12 mm size key aggregate shall<br />
be shaped immediately at a uniform rate of 1.8 cum per 100 sq.mt of<br />
area when entire surface is in hot condition. Brooms shall be used to<br />
ensure even distribution of key aggregates.<br />
Immediately after spraying of bitumen and spreading of aggregates<br />
immediately at a uniform rate of 1.8 cum per 100 sq.mt. of area<br />
should be done when entire surface is in hot conditions. Brooms shall<br />
be used to ensure even distribution of keys aggregates.<br />
9.6.7 Final Compaction:<br />
Immediately after spraying of bitumen and spreading of key<br />
aggregates the surface shall be rolled with a power roller to obtain full<br />
compaction and to force the blindage of key aggregate in to the<br />
interstices of the course aggregate. The rolling shall continue till the<br />
asphalted surface hardens and key aggregates stop moving under<br />
power roller.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 289<br />
9.7 SURFACE FINISH AND QUALITY CONTROL:<br />
The surface finish shall conform to the requirements of Clause 902 of<br />
specification for Roads and Bridges by Ministry of Road Transport &<br />
Highways. Quality control test and their frequencies shall be as per<br />
table 900-3 of specification for Roads and Bridges by Ministry of Road<br />
Transport & Highways.<br />
9.8 ARRANGEMENT OF TRAFFIC:<br />
During the period of execution, arrangement of traffic shall be done as<br />
per clause 112. (excluding past para of 112.6) of specification for<br />
Roads and Bridges by Ministry of Road Transport and Highways.<br />
9.9 ITEM TO INCLUDE:<br />
1) Labour and materials required for preparing surface.<br />
2) Supplying and spreading and compaction of 40mm hand<br />
broken size metal and 20mm crushed metal.<br />
3) Supplying, heating and spraying of bitumen.<br />
4) Supplying and spreading and compaction of 12 mm crushed<br />
metal.<br />
9.10 MODE OF MEASUREMENT AND PAYMENT :<br />
The Contract unit rate for finished work of bituminous bound<br />
macadam is in full for carrying out all operations. The finished work<br />
shall be measured in square meters.<br />
10.0 DENSE GRADED BITUMINOUS MACADAM:<br />
10.1 SCOPE:<br />
This clause specifies the construction of Dense Graded Bituminous<br />
Macadam (DBM), for use mainly, but not exclusively, in base/binder<br />
and profile corrective courses. DBM is also intended for use as <strong>road</strong>
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 290<br />
10.2 MATERIALS:<br />
10.2.1 Bitumen:<br />
base material. This work shall consist of construction in a single or<br />
multiple layers of DBM on a previously prepared base or sub-base. The<br />
thickness of a single layer shall be 50mm to 100mm.<br />
The bitumen shall be paving bitumen of Penetration Grade 60/70<br />
complying with Indian Standard Specifications for “Paving Bitumen”<br />
IS:73 and of the penetration indicated in Table 500-10 for MORT11H<br />
Specifications for dense bitumen macadam, or as otherwise specified in<br />
the Contract. Guidance on the selection of an appropriate grade of<br />
bitumen is given in The Manual for Construction and Supervision of<br />
Bituminous Works.<br />
10.2.2 Coarse Aggregates:<br />
The coarse aggregates shall consist of crushed rock, crushed gravel or<br />
other hard material retained on the 2.36 mm sieve. They shall be<br />
clean, hard, durable of cubical shape, free from dust and soft or friable<br />
matter, organic or other deleterious substances. Where the Contractor’s<br />
selected source of aggregates have poor affinity for bitumen, as a<br />
conditions for the approval of that source, the bitumen shall be treated<br />
with approved anti-stripping agents, as per the manufacture’s<br />
recommendations, without additional payment. Before approval of the<br />
source, the aggregates shall be tested for stripping. The aggregates<br />
shall satisfy the physical requirements specified in Table 500-8 of<br />
MORT&H <strong>specifications</strong>, for Dense Bituminous Macadam.<br />
Where crushed gravel is proposed for use as aggregate, not less than<br />
90% by weight of the crushed material retained on the 4.75mm sieve<br />
shall have at least two fractured faces.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 291<br />
10.2.3 Fine aggregates:<br />
Fine aggregates shall consist of crushed or naturally occurring mineral<br />
material or a combination of the two, passing 2.36mm sieve and<br />
retained on 75 micron sieve. They shall be clean, hard, durable, dry<br />
and free from dust, and soft or friable matter, organic or other<br />
deleterious matter.<br />
The fine aggregate shall have a sand equivalent value of not less than<br />
50 when tested in accordance with the requirement of IS:2720 (Part<br />
37).<br />
The plasticity index of the fraction passing the 0.425 mm sieve shall not<br />
exceed 4, when tested in accordance with IS:2720 (Part 5).<br />
TABLE 500-8<br />
PHYSICAL REQUIREMENTS FOR COARSE AGGREGATES FOR<br />
DENSE GRADED BITUMINOUS MACADAM<br />
Property Test Specification<br />
Cleanliness (dust) Grain size analysis 1 Max 5% passing 0.075<br />
mm sieve<br />
Particle shape Flakiness and Elongation<br />
Index (Combined) 2<br />
Max 30%<br />
Strength* Los Angles Abrasion Value3 Aggregate Impact Value4 Max 35%<br />
Max 27%<br />
Durability Soundness5 Sodium Sulphate<br />
Max 12%<br />
Magnesium Sulphate Max 18%<br />
Water Absorption Water absorption6 Max 2%<br />
Stripping Coating & stripping of<br />
Bitumen<br />
Aggregate Mixtures7 Minimum retained<br />
coating 95%<br />
Water Sensitivity** Retained Tensile Strength8 Min 80%
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 292<br />
Notes<br />
1. IS :2386 Part 1 5. IS:2386 Part 5<br />
2. IS :2386 Part 1 6. IS:2386 Part 3<br />
(the elongation test to be done only on non-flaky aggregates in the sample)<br />
3. IS : 2386 Part 4* 7. IS : 6241<br />
4. IS : 2386 Part 4* 8. AASHTO T283**<br />
* Aggregate may satisfy requirements of either of these two tests.<br />
** The water sensitivity test is only required if the minimum retained coating in<br />
the stripping test is less than 95%<br />
10.2.4 Filler:<br />
Filler shall consist of finely divided mineral matter such as rock dust,<br />
hydrated lime or cement approved by the Engineer.<br />
The filler shall be graded within the limits indicated in Table 500-9<br />
TABLE 500-9<br />
GRADING REQUIREMENTS FOR MINERAL FILLER<br />
IS Sieve (mm)<br />
Cumulative percent passing by weight of<br />
total aggregate<br />
0.6 100<br />
0.3 95 – 100<br />
0.075 85 – 100<br />
The filler shall be free from organic impurities and have a Plasticity<br />
Index not greater than 4. The Plasticity Index requirement shall not<br />
apply if filler is cement or lime. When the coarse aggregate is gravel, 2<br />
percent by weight of total aggregate shall be Portland cement or<br />
hydrated lime and the percentage and the percentage of fine<br />
aggregate reduced accordingly. Cement or hydrated lime is not
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 293<br />
required when the limestone aggregate is used. Where the aggregate<br />
fail to meet the requirements of the water sensitivity test in Table 500-8,<br />
then 2 percent by total weight of aggregate, of hydrated lime shall be<br />
added without additional cost.<br />
10.2.5 Aggregate grading and binder content:<br />
When tested in accordance with IS :2386 Part I (wet sieving method),<br />
the combined grading of the coarse and fine aggregate and added<br />
filler for the <strong>particular</strong> mixture shall fall within the limits shown in Table<br />
500-10, for dense bituminous macadam grading 1 or 2 as specified in<br />
the Contract. The type and quantity of bitumen and appropriate<br />
thickness, are also indicated for each mixture type.<br />
TABLE 500 – 10<br />
COMPOSITION OF DENSE GRADED BITUMINOUS<br />
MACADAM PAVEMENT LAYERS<br />
Grading 1 2<br />
Nominal aggregate size 40 mm 25 mm<br />
Layer thickness 80 – 100 mm 50 – 75 mm<br />
IS Sieve 1 (mm) Cumulative % by weight of total aggregate passing<br />
45 100 -<br />
37.5 95-100 100<br />
26.5 63-93 90 – 100<br />
19 - 71 – 95<br />
13.2 55 – 75 56 – 80<br />
9.5 - -<br />
4.75 38 – 54 38 – 54<br />
2.36 28 – 42 28 – 42<br />
1.18 - -
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 294<br />
Grading 1 2<br />
Nominal aggregate size 40 mm 25 mm<br />
Layer thickness 80 – 100 mm 50 – 75 mm<br />
IS Sieve 1 (mm) Cumulative % by weight of total aggregate passing<br />
0.6 - -<br />
0.3 7 – 21 7 – 21<br />
0.15 - -<br />
0.075 2 – 8 2 – 8<br />
Bitumen content % by<br />
mass of total mix 2<br />
Min 4.0 Min 4.5<br />
Bitumen grade (pen) 60/70 60/70<br />
Note : 1) The combined aggregate grading shall not vary from the low<br />
limit on one sieve to the high limit on the adjacent sieve.<br />
2) Determined by the Marshall method.<br />
10.3 MIXTURE DESIGN:<br />
10.3.1 Requirement for the mixture:<br />
Apart from conformity with the grading and quality requirements for<br />
individual ingredients, the mixture shall meet the requirements set out<br />
in Table 500-11.<br />
TABLE 500-11<br />
REQUIREMENTS FOR DENSE GRADED BITUMINOUS MACADAM<br />
Minimum stability (kN at 600C) 9.0<br />
Minimum flow (mm) 2<br />
Maximum flow (mm) 4<br />
Compaction level (Number of blows) 75 blows on each of the two<br />
faces of the specimen<br />
Percent air voids 3-6<br />
Percent voids in mineral aggregate<br />
(VMA)<br />
See Table 500-12 below<br />
Percent voids filled with bitumen (VFB) 65-75
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 295<br />
The requirements for minimum percent voids in mineral aggregate (VMA)<br />
are set out in Table 500-12.<br />
TABLE 500-12<br />
MINIMUM PERCENT VOIDS IN MINERAL AGGREGATE (VMA)<br />
Minimum VM Percent<br />
Related to<br />
Design Air Voids, Percent2 Nominal Maximum<br />
Particle Size1 (mm)<br />
3.0 4.0 5.0<br />
9.5 14.0 15.0 16.0<br />
12.5 13.0 14.0 15.0<br />
19.0 12.0 13.0 14.0<br />
25.0 11.0 12.0 13.0<br />
37.5 10.0 11.0 12.0<br />
Notes : 1. The nominal maximum particle size is one size larger than the first<br />
sieve to retain more than 10 percent.<br />
2. Interpolate minimum voids in the mineral aggregate (VMA) for design<br />
air voids values between those listed.<br />
10.3.2 Binder content:<br />
The binder content shall be optimised to achieve the requirements of<br />
the mixture set out in Table 500-11 and the traffic volume specified in<br />
the Contract. The Marshall method for determining the optimum binder<br />
content shall be adopted as described in The Asphalt Institute Manual<br />
MS-2, replacing the aggregates retained on the 26.5 mm sieve by the<br />
aggregates passing the 26.5 mm sieve and retained on the 22.4 mm<br />
sieve, where approved by the Engineer.<br />
Where 40 mm dense bituminous macadam mixture is specified, the<br />
modified Marshall method described in MS-2 shall be used. This<br />
method requires modified equipment and procedures, <strong>particular</strong>ly the<br />
minimum stability values in Table 500-11 shall be multiplied by 2.25<br />
and the minimum flow shall be 3mm.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 296<br />
10.3.3 Job mix formula:<br />
The Contractor shall inform the Engineer in writing, at least 20 days<br />
before the start of the work, of the job mix formula proposed for use in<br />
the <strong>works</strong>, and shall give the following details;<br />
i) Source and location of all materials;<br />
ii) Proportions of all materials expressed as follows where each is<br />
applicable.<br />
a) Binder type, and percentage by weight of total mixture<br />
b) Coarse aggregate/Fine aggregate/Mineral filler as<br />
percentage by weight of total aggregate including mineral<br />
filler;<br />
iii) A single definite percentage passing each sieve for the mixed<br />
aggregate;<br />
iv) The individual grading of the individual aggregate fractions, and<br />
the proportion of each in the combined grading.<br />
v) The results of tests enumerated in Table 500-11 as obtained by<br />
the Contractor.<br />
vi) Where the mixer is a batch mixer, the individual weights of each<br />
type of aggregate and binder per batch.<br />
vii) Test results of physical characteristics of aggregates to be used.<br />
viii) Mixing temperature and compacting temperature.<br />
While establishing the job mix formula, the Contractor shall ensure that<br />
it is based on a correct and truly representative sample of the materials<br />
that will actually be used in the work and that the mixture and its<br />
different ingredients satisfy the physical and strength requirements of<br />
these Specifications.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 297<br />
Approval of the job mix formula shall be based on independent testing<br />
by the Engineer for which samples of all ingredients of the mix shall be<br />
furnished by the Contractor as required by the Engineer.<br />
The approval job mix, formula shall remain effective unless and until a<br />
revised Job Mix Formula is approved. Should a change in the source<br />
of materials be proposed, a new job mix formula shall be forwarded to<br />
the Engineer for approval before the placing of the material.<br />
10.3.4 Plant trials - Permissible variation in job mix formula :<br />
Once the laboratory job mix formula is approved the Contractor shall<br />
carry out plant trials at the mixer to establish that the plant can be set<br />
up to produce a uniform mix conforming to the approved job mix<br />
formula. The permissible variations of the individual percentages of the<br />
various ingredients in the actual mix from the job mix formula to be<br />
used shall be within the limits as specified in Table 500-13. These<br />
variations are intended to apply to individual specimens taken for<br />
quality control tests in accordance with Section 900.<br />
TABLE 500-13<br />
PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA<br />
Permissible variations<br />
Description Base/bind Wearing<br />
er course course<br />
Aggregate passing 19mm sieve or large + 8% + 7%<br />
Aggregate passing 13.2mm, 9.5mm + 7% + 6%<br />
Aggregate passing 4.75mm + 6% + 5%<br />
Aggregate passing 2.36mm, 1.18mm,<br />
0.6mm<br />
+ 5% + 4%<br />
Aggregate passing 0.3mm, 0.15mm + 4% + 3%<br />
Aggregate passing 0.075mm + 2% + 1.5%<br />
Binder content + 0.3% + 0.3%<br />
Mixing temperature + 10oC + 10oC
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 298<br />
Once the plant trials have demonstrated the capability of the plant, and<br />
the trials are approved, the laying operation may commence. Over the<br />
period of the first month of production for laying on the <strong>works</strong>, the<br />
Engineer shall require additional testing of the product to establish the<br />
reliability and consistency of the plant.<br />
10.3.5 Laying Trials:<br />
Once the plant trials have been successfully completed and approved,<br />
the Contractor shall carry out laying trials, to demonstrate that the<br />
proposed mix can be successfully laid, and compacted all in<br />
accordance with Clause 501. The laying trial shall be carried out on a<br />
suitable area which is not to form part of the <strong>works</strong>, unless specifically<br />
approved in writing, by the Engineer. The area of the laying trials shall<br />
be a minimum of 100 sqm. of construction similar to that of the project<br />
<strong>road</strong>, and it shall be in all respects, <strong>particular</strong>ly compaction, the same<br />
as the project construction, on which the bituminous material is to be<br />
laid.<br />
The Contractor shall previously inform the Engineer of the proposed<br />
method for laying and compacting the material. The plant trials shall<br />
then establish if the proposed laying plant, compaction plant, and<br />
methodology is capable of producing satisfactory results. The density of<br />
the finished paving layer shall be determined by taking cores, no<br />
sooner than 24 hours after laying, or by other approved method.<br />
Once the laying trials have been approved, the same plant and<br />
methodology shall be applied to the laying of the material on the<br />
project, and no variation of either shall be acceptable, unless approved<br />
in writing by the Engineer, who may at his discretion require further<br />
laying trials.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 299<br />
10.4 CONSTRUCTION OPERATIONS<br />
10.4.1 Weather and seasonal limitations:<br />
Laying shall be suspended while free-standing water is present on the<br />
surface to be covered or during rain, fog and dust stones. After rain,<br />
the bituminous surface, prime or tack coat, shall be blown off with a<br />
high pressure air jet to remove excess moisture or the surface left to dry<br />
before laying shall start. Laying of bituminous mixtures shall not be<br />
carried out when the air temperature at the surface on which it is to be<br />
laid is below 10 o C or when the wind speed at any temperature exceeds<br />
40 km/h at 2m height unless specifically approved by the Engineer.<br />
10.4.2 Preparation of base :<br />
The base on which Dense Graded Bituminous Material is to be laid<br />
shall be prepared in accordance with Clauses 501 and 902 as<br />
appropriate or as directed by the Engineer. The surface shall be<br />
thoroughly swept clean by a mechanical broom, and the dust removed<br />
by compressed air. In locations where mechanical broom cannot<br />
access, other approved methods shall be used as directed by the<br />
Engineer.<br />
10.4.3 Geosynthetics:<br />
Where Geosynthetics are specified in the Contract this shall be in<br />
accordance with the requirements stated in Clause 703 of MORT&H<br />
<strong>specifications</strong>.<br />
10.4.4 Stress absorbing layer:<br />
Where a stress absorbing layer is specified in the Contract, this shall be<br />
applied in accordance with the requirements of Clause 522 of<br />
MORT&H <strong>specifications</strong>.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 300<br />
10.4.5 Prime Coat:<br />
10.4.6 Tack coat :<br />
Where the material on which the dense bituminous macadam is to be<br />
laid is other than a bitumen bound layer, a prime coat shall be<br />
applied, as specified, in accordance with the provisions of Schedule<br />
“A”, or as directed by the Engineer.<br />
Where the material on which the dense bituminous macadam is to be<br />
placed is a bitumen bound surface, a tack coat shall be applied as<br />
specified, in accordance with the provisions of Clause 503 of MORT &<br />
H <strong>specifications</strong>, or as directed by the Engineer.<br />
10.4.7 Mixing and transportation of the mixture :<br />
10.4.8 Spreading :<br />
10.4.9 Rolling:<br />
The provisions as specified in Clauses 501.3 and 501.4 of MORT & H<br />
<strong>specifications</strong> shall apply.<br />
The provisions of Clauses 501.5.3 and 501.5.4 of MORT & H<br />
<strong>specifications</strong> shall apply.<br />
The general provisions of Clauses 501.6 and 501.7 of MORT & H<br />
<strong>specifications</strong> shall apply, as modified by the approved laying trials.<br />
The compaction process shall be carried out by the same plant and<br />
using the same method, as approved in the laying trials, which may be<br />
varied only with the express approval of the Engineer in writing.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 301<br />
10.5 OPENING TO TRAFFIC:<br />
The newly laid surface shall not be open to traffic for at least 24 hours<br />
after laying and completion of compaction, without the express<br />
approval of the Engineer in writing.<br />
10.6 SURFACE FINISH AND QUALITY CONTROL OF WORK:<br />
The surface finish of the completed construction shall conform to the<br />
requirements of Clause 902 of MORT & H Specifications. All materials<br />
and workmanship shall comply with the provisions set out in Section<br />
900 of this <strong>specifications</strong>.<br />
10.7 ARRANGEMENTS FOR TRAFFIC :<br />
During the period of construction, arrangements for traffic shall be<br />
made in accordance with the provisions of Clause 112.<br />
10.8 MEASUREMENT FOR PAYMENT :<br />
10.9 RATE:<br />
Dense Graded Bituminous Materials shall be measured as finished<br />
work in cubic metres at a specified thickness as detailed on the<br />
Contract drawings, or documents, or as directed by the Engineer.<br />
The contract unit rate for Dense Graded Bituminous Macadam shall be<br />
payment in full for carrying out the all required operations as specified,<br />
and shall include, but not necessarily limited to all components listed in<br />
Clause 501.8.8.2(i) to (xi) of MORT & H <strong>specifications</strong>.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 302<br />
11.0 BITUMINOUS CONCRETE:<br />
11.1 This clause specifies the construction of Bituminous Concrete for use in<br />
11.2 MATERIALS:<br />
11.2.1 Bitumen:<br />
wearing and profile corrective course. This work shall consist of<br />
construction in a single or multiple layers of bituminous concrete on a<br />
previously prepared bituminous bound surface. A single layers shall be<br />
25mm to 100mm in thickness.<br />
The bitumen shall be of Penetration grade 60/70 complying with Indian<br />
Standard Specification for Paving Bitumen, IS:73 and of the penetration<br />
indicated in Table 500-18 of M.O.R.T.& H. Specifications (Fourth<br />
Revision), for bituminous concrete, or as otherwise specified in the<br />
contract.<br />
11.2.2 Coarse aggregates:<br />
The coarse aggregates shall be generally as specified in Clause 507.2.2<br />
of M.O.R.T. & H. Specifications (Fourth Revision), except that the<br />
aggregates shall satisfy the physical requirements of Table 500-17 of<br />
M.O.R.T. & H. Specifications (Fourth Revision).<br />
11.2.3 Fine aggregates:<br />
11.2.4 Filler:<br />
The fine aggregates shall be all as specified in Clause 507.2.3 of<br />
M.O.R.T. & H. Specifications (Fourth Revision).<br />
Filler shall be generally as specified in Clause 507.2.4 of M.O.R.T. & H.<br />
Specifications (Fourth Revision). Where the aggregates fails to meet the<br />
requirements of the water sensitivity test in Table 500-17 of M.O.R.T. &<br />
H. Specifications (Fourth Revision), then 2 per cent by total weight of<br />
aggregate, of hydrated lime shall be added without additional cost.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 303<br />
TABLE 500-17<br />
PHYSICAL REQUIREMENTS FOR COARSE AGGREGATES FOR<br />
BITUMINOUS CONCRETE PAVEMENT LAYERS<br />
Property Test Specification<br />
Cleanliness (dust) Grain size analysis 1 Max 5% passing 0.075mm<br />
sieve<br />
Particle shape Flakiness and Elongation Index Max 30% (Combined) 2<br />
Strength* Los Angeles Abrasion Value 3<br />
Aggregate Impact Value 4<br />
Max 30%<br />
Max 24%<br />
Polishing Polished Stone Value 5 Min 55<br />
Durability Soundness 6<br />
Sodium Sulphate<br />
Magnesium Sulphate<br />
Max 12%<br />
Max 18%<br />
Water Absorption Water absorpiton 7 Max 2%<br />
Stripping Coating and stripping of<br />
Bitumen<br />
Aggregate Mixtures 9<br />
Minimum retained<br />
Coating 95%<br />
Water Sensitivity** Retained Tensile Strength 8 Min 80%<br />
Notes: 1. IS: 2386 Part 1 6. IS: 2386 Part 5<br />
2. IS: 2386 Part 1 7. IS: 2386 Part 3<br />
(the elongation test to be done only on non-flaky aggregates in the<br />
sample)<br />
3. IS: 2386 Part 4* 8. AASHTO T283**<br />
4. IS: 2386 Part 4* 9. IS: 6241<br />
5. BS: 812 Part 114<br />
* Aggregates may satisfy requirements of either of these two tests.<br />
** The water sensitivity test is only required if the minimum retained coating<br />
in the stripping test is less than 95%.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 304<br />
11.2.5 Aggregate grading and binder content:<br />
When tested in accordance with IS: 2386 Part 1 (Wet grading method),<br />
the combined grading of the coarse and fine aggregates and added<br />
filler shall fall within the limits shown in Table 500-18 of M.O.R.T. & H.<br />
Specifications (Fourth Revision), for gradings 1 or 2 as specified in the<br />
contract.<br />
TABLE 500-18<br />
COMPOSITION OF BITUMINOUS CONCRETE PAVEMENT LAYERS<br />
Grading 1 2<br />
Nominal aggregate size 19mm 13mm<br />
Layer Thickness 50-65mm 30-45mm<br />
IS Sieve1 (mm) Cumulative % by weight of total aggregate passing<br />
45 - -<br />
37.5 - -<br />
26.5 100 -<br />
19 79-100 100<br />
13.2 59-79 79-100<br />
9.5 52-72 70-88<br />
4.75 35-55 53-71<br />
2.36 28-44 42-58<br />
1.18 20-34 34-48<br />
0.6 15-27 26-38<br />
0.3 10-20 18-28<br />
0.15 5-13 12-20<br />
0.075 2-8 4-10<br />
Bitumen content % by<br />
mass of total mix2 5.0-6.0 5.0-7.0<br />
Bitumen grade (pen) 60/70 60/70<br />
Notes: 1) The combined aggregate grading shall not vary from the low limit<br />
on one sieve to the high limit on the adjacent sieve.<br />
2) Determined by the Marshall method.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 305<br />
11.3 MIXTURE DESIGN:<br />
11.3.1 Requirements for the mixture:<br />
Apart from conformity with the grading and quality requirements for<br />
individual ingredients, the mixture shall meet the requirements set out in<br />
Table 500-19 of M.O.R.T. & H. Specifications (Fourth Revision).<br />
The requirements for minimum per cent voids in mineral aggregate<br />
(VMA) are set out in Table 500-12 of M.O.R.T. & H. Specifications<br />
(Fourth Revision).<br />
TABLE 500-19<br />
REQUIREMENTS FOR BITUMINOUS PAVEMENT LAYERS<br />
Minimum stability (kN at 60 0 C) 9.0<br />
Minimum flow (mm) 2<br />
Maximum flow (mm) 4<br />
Compaction level (Number of blows) 75 blows on each of the two faces of the<br />
specimen<br />
Percent air voids 3-6<br />
Percent voids in mineral aggregate (VMA) See Table 500-12 of MORT & H<br />
Percent voids filled with bitumen (VFB) 65-75<br />
Loss of stability of immersion in water at<br />
600C (ASTM D 1075)<br />
11.3.2 Binder content:<br />
Min. 75% retained strength<br />
The binder content shall be optimized to achieve the requirements of the<br />
mixture set out in Table 500-18 of M.O.R.T. & H. Specifications (Fourth<br />
Revision) and the traffic volume as specified in the contract. The Marshall<br />
method for determining the optimum binder content shall be adopted as<br />
described in the Asphalt Institute Manual MS-2, replacing the aggregates<br />
retained on the 26.5mm sieve and retained on the 22.4 mm sieve,<br />
where approved by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 306<br />
11.3.3 Job Mix formula:<br />
The procedure for formulating the job mix formula shall be generally as<br />
specified in Clause 507.3.3 of M.O.R.T. & H. Specifications (Fourth<br />
Revision) and the results of tests enumerated in Table 500-19 of<br />
M.O.R.T. & H. Specifications (Fourth Revision) as obtained by the<br />
Contractor.<br />
11.3.4 Plant trials – permissible variation in job mix formula:<br />
The requirements for plant trials shall be as specified in Clause 507.3.4<br />
of M.O.R.T. & H. Specifications (Fourth Revision), and permissible limits<br />
for variation as shown in Table 500-13 of M.O.R.T. & H. Specifications<br />
(Fourth Revision).<br />
11.3.5 Laying trials:<br />
The requirements for laying trials shall be all as specified in Clause<br />
507.3.5 of M.O.R.T. & H. Specifications (Fourth Revision).<br />
11.4 CONSTRUCTION OPERATION :<br />
11.4.1 Weather and seasonal limitations :<br />
The provisions of Clause 501.5.1 of M.O.R.T. & H. Specifications<br />
(Fourth Revision) shall apply.<br />
11.4.2 Preparation of base :<br />
The surface on which the bituminous concrete is to be laid shall be<br />
prepared in accordance with Clauses 501 and 902 of M.O.R.T. & H.<br />
Specifications (Fourth Revision) as appropriate, or as directed by the<br />
Engineer. The surface shall be thoroughly swept clean by mechanical<br />
broom and dust removed by compressed air. In locations where a<br />
mechanical broom cannot access, other approved methods shall be<br />
used as directed by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 307<br />
11.4.3 Geosynthetics :<br />
Where Geosynthetics are specified in the contract this shall be in<br />
accordance with the requirements stated in Clause 703 of M.O.R.T. &<br />
H. Specifications (Fourth Revision).<br />
11.4.4 Stress absorbing layer :<br />
11.4.5 Tack coat :<br />
Where a stress absorbing layer is specified in the contract, this shall be<br />
applied in accordance with the requirements of Clause 522 of<br />
M.O.R.T. & H. Specifications (Fourth Revision).<br />
Where specified in the contract, or otherwise required by the Engineer,<br />
tack coat shall be applied in accordance with the requirements of<br />
Clause 503 of M.O.R.T. & H. Specifications (Fourth Revision).<br />
11.4.6 Mixing and transportation of the mixture :<br />
11.4.7 Spreading:<br />
11.4.8 Rolling :<br />
The provisions as specified in Clauses 501.3 and 501.4 of M.O.R.T. &<br />
H. Specifications (Fourth Revision) shall apply.<br />
The general provision of clauses 501.3.5 and 501.5.4 of M.O.R.T. &<br />
H. Specifications (Fourth Revision) shall apply.<br />
The general provisions of clauses 501.6 and 501.7 of M.O.R.T. & H.<br />
Specifications (Fourth Revision) shall apply, as modified by the approved<br />
laying trials.<br />
11.5 OPENING OF TRAFFIC :<br />
The newly laid surface shall not be open to traffic for at least 24 hours<br />
after laying and the completion of compaction, without the express<br />
approval of the Engineer in writing.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 308<br />
11.6 SURFACE FINISH AND QUALITY CONTROL :<br />
The surface finish of the completed construction shall conform to the<br />
requirements of Clause 902 of M.O.R.T. & H. Specifications (Fourth<br />
Revision). All materials and workmanship shall comply with the<br />
provisions set out in Section 900 of M.O.R.T. & H. Specifications (Fourth<br />
Revision).<br />
11.7 ARRANGEMENTS FOR TRAFFIC:<br />
During the period of construction, arrangements for traffic shall be<br />
made in accordance with the previous of Clause 112 of M.O.R.T. & H.<br />
Specifications (Fourth Revision).<br />
11.8 MEASUREMENT FOR PAYMENT :<br />
Bituminous concrete shall be measure as finished work in cubic metres.<br />
12.0 PRECAST FACTORY MADE CONCRETE KERB STONES:<br />
12.1 MANUFACTURE:<br />
Pre-cast factory made PCC in M-25 grade concrete and of specified<br />
dimensions shall be manufactured in accordance with IS 5758-1970<br />
and generally in accordance with <strong>specifications</strong> of concrete <strong>works</strong> as<br />
specified.<br />
12.2 SIZES :<br />
The sizes of kerb stones be as per detailed under Schedule “A”. The<br />
concrete shall consist of grade M-25 laid to the dimensions, lines and<br />
levels shown in the drawing and well compacted by ramming or other<br />
means. The kerb stone then the embedded into cement concrete of<br />
grade 15 to a minimum thickness of 100 mm all around including<br />
filling in joints with C.M. 1:3 and finishing with neat cement slurry etc.<br />
complete as specified or as directed by the Engineer. After the line and<br />
levels have been checked to be within the specified tolerance the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 309<br />
haunching will be placed taking care that the line and level of the kerbs<br />
is not displaced during the process. All straight kerbs, circular kerbs,<br />
quadrants or other kerbs shall be laid within a vertical or horizontal<br />
tolerances of 3mm from the true line or level.<br />
12.3 MEASUREMENT FOR PAYMENT :<br />
12.4 RATE:<br />
Measurement shall be in linear meter up to 0.01 mt. of specified size of<br />
kerb stone provided.<br />
The unit rate shall include all materials, labour, tools & plants etc.<br />
including transportation to site, unloading, excavation, laying,<br />
curing, oil painting, disposal off unsuitable material etc. all required<br />
to complete the job as per drawing.<br />
13.0 PRECAST FACTORY MADE WATER TABLE:<br />
13.1 SIZE:<br />
Manufacture:<br />
Precast factory made P.C.C. water table of M-25 grade, minimum<br />
cement content as per IS 456-2000 for moderate exposure condition,<br />
water cement ratio 0.45 and of specified dimension shall be<br />
manufactured in accordance with IS 5758-1970 and generally in<br />
accordance with specification of concrete <strong>works</strong> as specified.<br />
The size of water table shall be as per drawing or as directed by<br />
Engineer.<br />
13.2 MEASUREMENT FOR PAYMENT:<br />
Measurement shall be in linear meter up to 0.01 mtr. of specified size<br />
of water table provided.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 310<br />
14.0 PROVIDING AND LAYING HARD CORE:<br />
14.1 ITEM INCLUDES:<br />
a) Supplying and conveying to the site over size metal (80 to<br />
100mm) spreading in required line and slopes including hand<br />
packing and compaction.<br />
b) All labour material etc.<br />
14.2 MODE OF MEASUREMENT:<br />
Contract rate shall be for providing and laying one cubic meter of hard<br />
core.<br />
15.0 PROVIDING AND CASTING IN SITU M-20/M-25/M-30 USING READY<br />
MIX CONCRETE:<br />
All concrete <strong>works</strong> will be by providing and casting RCC & PCC M-<br />
20/M-25/M-30 by using Ready mix concrete manufactured by any<br />
reputed manufacturer approved by Engineer-in-charge using maximum<br />
20mm graded trap stone aggregate for RCC raft foundations, walls,<br />
beams, slab including dewatering, centering, form work, etc. and<br />
including all taxes etc. complete.<br />
15.1 Scope of work & item to include-<br />
1. The item refer to ready mix concrete required for R.C.C. & P.C.C.<br />
<strong>works</strong> as mentioned above procured from reputed manufacturer<br />
approved by Engineer. The contractor shall be conforming to IS:<br />
456-2000 or its amendments for controlled cement concrete.<br />
The material requirement shall be completed according to<br />
Standard Specifications No.B.7.1. refer Page No.38 for controlled<br />
cement concrete.<br />
2. The item include manufacture with ingredients, control<br />
temperature, transportation, pumping, placing, vibration and<br />
curing of Ready mix concrete and all taxes, excise duty, sales tax,
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 311<br />
octroi, insurance etc. levied by Govt/Semi-Govt/local authority<br />
and cost of ready mix concrete and any penalty, additional<br />
charges for controlling temperature upto casting, or any other<br />
charges levied by the manufacturer.<br />
3. Proportioning of the mix/mix design shall be decided by the<br />
contractor/RMC manufacture to achieve strength specified in item<br />
& shall be get approved by Engineer-in-charge. The<br />
proportioning of ingredients, use of ingredients and mix designs<br />
parameters for various slumps shall be got approved by Engineer-<br />
in-charge prior to mix design.<br />
4. Scaffolding shall conform to <strong>specifications</strong> No.B.6.5 (a) and got<br />
approved by the Engineer.<br />
5. Forms shall conform to <strong>specifications</strong> No.B.6.5 (b).<br />
6. The concrete shall be pumped to the final positions as quickly as<br />
possible by methods which will prevent segregation and loss of<br />
ingredients.<br />
7. The concrete shall be placed into its final position, compacted and<br />
finished before initial setting commences. The method of placing<br />
shall be such as to avoid segregation. Placing shall be done in a<br />
balanced manner to avoid eccentric loads on the form work.<br />
As far as possible the concreting shall be done continuously and<br />
construction joints avoided.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 312<br />
15.2 Testing-<br />
If the area to be concreted is under water, the water shall be<br />
removed by bailing out or using pumps and other devices.<br />
8. Compaction shall be done by mechanical vibrators and also by<br />
rods so that a dense concrete is obtained.<br />
9. The concrete shall be adequately cured.<br />
10. Immediately after the removal of forms, any undulations,<br />
depressions, cavities, honey combing broken edges or corners<br />
height spots defects shall be made good and finished with cement<br />
mortar 1:3. But necessity of such finishing must be exceptional<br />
and the total not exceed 1% on an average.<br />
11. Concrete which is partially hardened shall not be tempered or re-<br />
mixed but shall be disposed off as desirable.<br />
12. Sampling and testing shall be done as per I.S. 456 (latest version).<br />
13. All labour, materials use of equipment, tools and plant, installing<br />
and removal of scaffolding, false work and forms and branching<br />
necessary for the satisfactory completion of item.<br />
14. Compensation for injury to persons and damage to work or<br />
property.<br />
15. Establishment of site laboratory.<br />
Cubes of 15 cm x 15 cm x 15 cm size shall be cast on the first day and<br />
tested for compression at 7 and 28 days. Later on, if the Engineer so<br />
directs, frequency of sampling be mutually agreed up on and approved<br />
as per quantum received on site.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 313<br />
15.3 Mode of measurement and payment-<br />
The contract rate shall be for a unit of one cubic metre of concrete.<br />
The concrete shall be measured for its length, breadth and depth<br />
limiting dimensions to those specified on the drawings or as ordered by<br />
the Engineer. No deduction shall be made for reinforcing steel bars<br />
and anchor bars. No deduction shall be made for embedded structural<br />
steel, if there combined sectional area is less than 500 sq.cm. Holes for<br />
anchor shall not be deducted nor payment made for grouting these<br />
holes. The sizes of R.C.C. members assumed in the estimate or<br />
preliminary drawings are likely to be changed. The contractor shall not<br />
be entitled to extra claims due to such changes.<br />
15.4 READY – MIXED CONCRETE :<br />
Ready Mixed concrete may be manufactured in a central automatic<br />
weigh Batching plant and transporting to the job in agitating transit<br />
mixers.<br />
The maximum size of coarse aggregate shall be limited to one third of<br />
the smallest inside diameter of the hose or pipe used for pumping.<br />
Provision shall be made for elimination over-sized particle by screening<br />
or by careful selection of aggregates. To obtain proper gradation it<br />
may be necessary to combine and blend certain fractional sizes of<br />
aggregates. Uniformity of gradation throughout the entire job shall be<br />
maintained.<br />
The quantity of coarse aggregate shall be such that the concrete can be<br />
pumped, compacted and finished without difficulty.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 314<br />
Fine Aggregates<br />
The gradation of fine aggregates shall be such that 15 to 30 percent<br />
should pass the 0.30 mm screen and 5 to 10 percent should pass 0.15<br />
mm screen so as to obtain a pumpable concrete. Sands which are<br />
deficient in either of these two size should be blended with selected<br />
finer sands to produce these desired percentages. With this gradation<br />
sands having a fineness modulus between 2.4 and 2.8 are generally<br />
satisfactory. However, for uniformity the finess modulus of the sand<br />
should not vary more than 0.2 from the average value used in<br />
proportioning.<br />
Water, Admixture and slump:<br />
The amount of water required for project concrete consistency shall<br />
take into account the rate of mixing, length of haul, time of unloading<br />
and ambient temperature conditions.<br />
Additions of water to compensate for slump loss should not be restored<br />
to nor should the design maximum water-cement ratio be exceeded.<br />
Additional dose of be retarder be used to compensate the loss of slump<br />
at contractor’s cost. Retempering water shall not be allowed to be<br />
added to mixed batches to obtain desired slump.<br />
Transportation:<br />
The method of transportation used should efficiently deliver the<br />
concrete to the point of placement without significantly altering its<br />
desired properties with regard to water – cement ratio, slump, and<br />
homogeneity.<br />
The revolving – drum truck bodies of approved make shall be used for<br />
transportation the concrete. The number of revolutions at mixing speed,<br />
during transportation and prior to discharge shall be specified and<br />
agreed upon. Reliable counters shall be used on revolving drum truck
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 315<br />
units. Standard mixer uniformity tests, conforming to ASTM Standards C<br />
94-69 “Standard Specification for Ready mix Concrete” shall be carried<br />
out to determine whether mixing is being accomplished satisfactorily.<br />
Field Control: -<br />
Sampling at both truck discharge and point of final placement shall be<br />
employed to determine if any changes in the slump and other<br />
significant mix characteristics occur. However, for determining strength<br />
of concrete, cubes shall be taken from the placement end of line.<br />
Planning:<br />
Proper planning of concrete supply, pump locations, line layout placing<br />
sequence, and the entire pumping operation shall be made and got<br />
approved. The pump should be as near the placing are as practicable,<br />
and the entire surrounding area shall have adequate bearing strength<br />
to support concrete delivery pipes. Lines from pumps to placing area<br />
should be laid out with a minimum of bends. For large placing areas,<br />
alternate lines should be installed for rapid connection when required.<br />
Standby power and pumping equipment should be provided to replace<br />
initial equipment, should breakdown occur.<br />
The placing rate should be estimate so that concrete can be ordered at<br />
an appropriate delivery rate.<br />
The placing rate should be estimate so that concrete can be ordered<br />
at an appropriate delivery rate.<br />
Time in transport shall be as per IS: 4926-2003.<br />
Information to be supplied by the RMC producer shall be as per<br />
Clause No.8 of IS: 4926-2003.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 316<br />
Information to be included in the delivery ticket to the purchaser<br />
shall be as per Annexure “G” of IS: 4926-2003.<br />
Material testing reports shall invariably be submitting by the<br />
producer as per Annexure “B” of IS: 4926-2003<br />
Time in transport i.e. the time of loading/mixing water to the time of<br />
discharge from the truck mixer shall not be more than 2 hrs.<br />
16.0 Providing and constructing B.B. Masonry chamber of 90 x 60 cm.<br />
internal size and depth up to 1.2m. with precast R.C.C. slab cover<br />
with 15 cm. thick 1:3:6 proportion P.C.C. bedding, including<br />
excavation, B.B. Masonry in C.M. 1:4 proportion precast R.C.C<br />
frame and cover etc. complete.<br />
16.1 This item includes all materials and labour mentioned hereafter,<br />
bricks, RCC Cover, excavation, laying cement concrete, B.B.<br />
masonry, plastering and refilling. The precast cover shall be tested<br />
and the results for approved before fixing the same.<br />
16.2 Brick Masonry:<br />
Burnt brick shall be the best available locally and kiln burnt, the<br />
minimum compressive strength shall be 40 kg/cm2. Bricks shall be<br />
tested as per relevant IS for every 50,000 Nos. The sizes and<br />
physical requirements of bricks shall be as per standard<br />
<strong>specifications</strong> of B & C Department, Govt. of <strong>Maharashtra</strong> and<br />
conforming to IS: 1877.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 317<br />
16.3 Joints of brick work shall be properly raked out cleaned and washed<br />
before plastering. Top of walls having P.C.C. (1:2:4) for fixing<br />
R.C.C. cover shall be finished with C.M. 1:4 20 mm thick. The item<br />
shall be carried out as directed by Engineer-in-charge.<br />
17.0 Disposal of surplus excavated excess material upto 2.00 km. or<br />
specified lead including loading, transporting, unloading, stacking,<br />
spreading, laying in layers and leveling etc. complete.<br />
17.1 SCOPE OF WORK AND ITEM TO INCLUDE:<br />
All labour, material and equipment required for loading,<br />
conveyance, unloading, stacking or spreading the material for<br />
satisfactory completion of the item and the incidental charges,<br />
royalties, compensation or damages required to be paid.<br />
17.2 MODE OF MEASUREMENT AND PAYMENT:<br />
The distance of conveyance shall be measured from the centre of<br />
gravity of the bulk of excavation to the centre of gravity of the<br />
finished stacks or spreading or disposal. This distance shall be the<br />
shortest practicable route between the above mentioned two centres<br />
of gravity as decided by the Engineer although the actual route taken<br />
by the Contractor to lead out the materials may be longer. The<br />
shortest practicable route which can be used by the Contractor or<br />
which the department could have used itself, whichever is shorter.<br />
The extra lead is obtained by deducting the initial free lead of 50<br />
meters from the above. All lifts are included in the rate.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 318<br />
The contract rate shall be for one cubic metre of materials (i.e. after<br />
deduction for voids if measured on basis of stacks) conveyed to the<br />
place of disposal.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 319<br />
PARTICULAR SPECIFICATIONS<br />
(BRIDGE WORKS)<br />
1.0 REFERENCE TO THE STANDARD CODES OF PRACTICE:<br />
1.1 All Standards, tentative Specifications, Specifications, Codes of Practice<br />
referred to shall be the latest editions including all applicable official<br />
amendments and revisions. The contractor shall make available at site<br />
all relevant Indian Road Congress and Indian Standard Codes of<br />
practice as applicable and also Standard Specification of MORT & H.<br />
1.2 In case of discrepancy between Standards, codes of practice, tentative<br />
Specification, <strong>specifications</strong> referred to and this specification, this<br />
specification shall govern.<br />
1.3 CONTRACTOR TO PROVIDE :<br />
The Contractor shall provide and maintain at site throughout the period<br />
of <strong>works</strong> the following at his own cost and without extra charge, the<br />
cost being held to be included in the Contract Rates.<br />
1. All labour, materials, plants, equipments and temporary <strong>works</strong><br />
required to complete and maintain the <strong>works</strong> to the satisfaction<br />
of the Engineer.<br />
2. Lighting for night work, and also whenever and wherever<br />
required by the Engineer.<br />
3. Temporary fences, guards, lights and protective work necessary<br />
for protection of workmen, supervisors, engineers or any other<br />
persons permitted access to the site.<br />
4. All equipment, instruments and labour required by the Engineer<br />
for measurement of the <strong>works</strong>.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 320<br />
1.4 DIMENSIONS:<br />
1. Recorded dimensions on drawings shall supersede<br />
measurements by scale and drawings to a large scale shall take<br />
precedence over those to a smaller scale. Special dimensions or<br />
directions in the <strong>specifications</strong> shall supersede all others. All<br />
dimensions shall be checked on site prior to execution.<br />
2. The dimensions where stated do not allow for waste, laps, joints,<br />
etc. but the contractor shall provided at his own cost sufficient<br />
labour and materials to cover such waste, laps, joints, etc.<br />
3. The levels, measurements and other information concerning the<br />
existing site as shown on the drawings are believed to be correct,<br />
but the contractor should verify them for himself and also<br />
examine the nature of the ground as no claim or allowance<br />
whatsoever will be entertained on account of any errors or<br />
omissions in the levels or the description of the ground levels or<br />
strata turning out different from what was expected or shown on<br />
the drawings.<br />
1.5 SETTING OUT OF WORKS<br />
The contractor shall set out the <strong>works</strong> indicated in the conditions of<br />
contract.<br />
1.6 WATER :<br />
1. Water from Approved Source:<br />
Clean, fresh, potable water suitable for drinking purpose only<br />
shall be used for the <strong>works</strong>. The water shall be free from any<br />
deleterious matter in solution or in suspension and be obtained<br />
from an approved source. The quality of water shall conform to<br />
IS: 456-2000.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 321<br />
2. Storage:<br />
1.7 WORKMANSHIP<br />
The contractor shall make his own arrangements for storing<br />
water, if necessary, in drums or tanks to the approval of the<br />
Engineer. Care shall be exercised to see that water is not<br />
contaminated in any way.<br />
1. All <strong>works</strong> shall be true to level, plumb and square and the<br />
corners, edges and arises in all cases shall be unbroken and<br />
near.<br />
2. Any work not to the satisfaction of the Engineer or his<br />
1.8 LOADING TESTS:<br />
representative will be rejected and the same shall be rectified, or<br />
removed and replaced with work of the required standard of<br />
workmanship at no extra cost.<br />
1. The Engineer shall during the progress of the <strong>works</strong> or the period<br />
of maintenance, instruct the contractor that a loading test or tests<br />
be made on the <strong>works</strong> or any part thereof if, in his opinion, such<br />
a test or tests be deemed necessary for one or more of the<br />
reasons herein below specified :<br />
i. The site made concrete test cubes failing to attain the<br />
specified strength.<br />
ii. The shuttering for concrete <strong>works</strong> being prematurely<br />
removed.<br />
iii. Overloading during construction of the <strong>works</strong> or part<br />
thereof;<br />
iv. Concrete improperly cured.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 322<br />
v. If any portion of the work is carried out without prior<br />
approval in writing of the Engineer or his representative to<br />
proceed with such work.<br />
vi. If concrete is honeycombed or damaged or in the opinion<br />
of the Engineer <strong>particular</strong>ly weak in important or critical<br />
areas of the structure where weakened concrete will affect<br />
the ability of the structure to carry design loads;<br />
vii. Any other circumstances attributed to alleged negligence<br />
on the part of the contractor which, in the opinion of the<br />
Engineer, results in the <strong>works</strong> or any part thereof being of<br />
less than the expected strength;<br />
viii. Any reason other than the foregoing.<br />
2. If the loading tests be instructed to be made solely or in part for<br />
the reasons 1.8.1(I to VII) the tests shall be made at the<br />
contractors own cost, whether the results of such tests be<br />
satisfactory or otherwise. If the tests are instructed to be made<br />
for the reason 1.8.1(VIII) hereinbefore specified, the contractor<br />
shall make the tests and shall be reimbursed for all costs relating<br />
thereto irrespective of the results of the tests.<br />
3. All the loading tests and other tests will be carried out strictly in<br />
accordance with the instructions of the Engineer. Load testing will<br />
generally follow the procedure set out in Indian Standard Codes<br />
of Practice, but the Engineer is not bound to follow the Indian<br />
Standard Codes of Practice and in his absolute discretion may<br />
issue instructions differing from the procedure set out in the<br />
Indian Standard Codes of Practice.<br />
4. If in the opinion of the Engineer the result of the loading tests is<br />
not satisfactory the Engineer shall instruct that such parts of the<br />
<strong>works</strong> as he specifies shall be taken down or cut out and
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 323<br />
1.9 MATERIALS<br />
1.9.1 General<br />
reconstructed to comply with the <strong>specifications</strong>, or other remedial<br />
measures shall be taken to make <strong>works</strong> secure to the satisfaction<br />
of the Engineer. The contractor shall take down, or cut out and<br />
reconstruct the defective work or shall take the remedial<br />
measured instructed at his own cost.<br />
All the materials shall conform to the <strong>specifications</strong> for Roads and<br />
Bridges Works of the MORT&H (Ministry of Road Transport and<br />
Highway – Road Wing) and to the IRC/IS stipulations in that order. All<br />
standards stipulated shall be the latest revisions.<br />
1.9.2 Source of Materials :<br />
It shall be responsibility of the Contractor to procure all the materials<br />
required for construction and completion of the contract. The<br />
contractor shall indicate in writing the source of materials well in<br />
advance to the Engineer, after the award of the work and before<br />
commencing the work. If the material from any source is found to be<br />
unacceptable at any time, it shall be rejected by the Engineer and the<br />
contractor shall forthwith remove the material from the site as directed<br />
by the Engineer.<br />
1.9.3 Inspection & Acceptance of Materials :<br />
Final inspection and acceptance of materials shall be made only at the<br />
site of work. The Engineer or his representative reserves the right to<br />
sample, inspect and test materials throughout the duration of the<br />
contract and to reject any material found to be unsatisfactory.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 324<br />
1.9.4 Sampling of Materials :<br />
The Contractor shall furnish without any charge all samples required<br />
and shall offer such facilities as the Engineer/his representative may<br />
require for testing. Samples provided to the Engineer for their retention<br />
are to be in labeled boxes suitable for storage. Quality of materials or<br />
workmanship not as per the approved samples will be rejected by the<br />
Engineer and shall be removed from the site as directed by the<br />
Engineer, at the contractor’s own cost. Samples required for testing<br />
and approval must be supplied well in advance to allow for testing and<br />
approval. Delay in work arising from late submission of samples will<br />
not be accepted as reason for delay in completion of work.<br />
1.9.5 STORAGE OF MATERIALS :<br />
All materials shall be stored as to prevent their deterioration and to<br />
ensure the preservation of their quality and fitness for the work and<br />
shall be stored in accordance with MORT&H <strong>specifications</strong>. Such<br />
materials, even though approved before storage, shall be subject to<br />
retest and must meet covered by any of the above <strong>specifications</strong>, the<br />
execution of the <strong>works</strong> shall be in conformity with sound Engineering<br />
Practice. In all such cases, the decision of the Engineer shall be final<br />
and binding on the Contractor and no extra cost shall be paid on this<br />
account.<br />
1.10 The contractor shall provide all materials, labour, plants, tools, etc.<br />
necessary for the satisfactory completion of work. He shall be<br />
responsible for supply, use and maintenance of all construction plants<br />
and equipments and shall ensure the efficient working of the same<br />
without any interruption. The Contractor shall ensure high standard of<br />
workmanship in all trades by employing only skilled and experienced<br />
tradesmen.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 325<br />
1.11 SITE CLEARANCE :<br />
This shall consists of removing and disposing off all materials such as<br />
trees, bushes, shrubs, rubbish, etc. which in the opinion of the Engineer<br />
are unsuitable for incorporation in the <strong>works</strong> from within the highway<br />
limit and such another areas as may be specified on the drawing or by<br />
the Engineer., the requirements of the <strong>specifications</strong> at the time of their<br />
use in <strong>works</strong>.<br />
1.12 TESTING :<br />
Testing shall be carried out in a field laboratory set up by the<br />
Contractor and cross checking will be done in <strong>CIDCO</strong> Laboratory or<br />
any recognized laboratory at the Contractor’s cost.<br />
1.13 DEFECTIVE MATERIALS :<br />
All materials, which the Engineer has determined as not conforming to<br />
the requirements of the contract will be rejected, whether in place or<br />
not. They shall be removed by the Contractor at his own cost<br />
immediately as directed. Materials, which have been found defective<br />
and which have been subsequently rectified or corrected shall not be<br />
used in the work without the consent of the Engineer in writing. Upon<br />
failure of the Contractor to comply promptly with any order of the<br />
Engineer or his representative, given under this clause, the Engineer<br />
shall have the authority to have rejected material removed and deduct<br />
the cost of removal from any money due to the contractor.<br />
1.14 TESTING OF MATERIAL NOT COVERED UNDER SPECIFICATIONS:<br />
In case the materials/finished products are not covered by the<br />
<strong>specifications</strong> in the contract, the details of specification to be followed
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 326<br />
and the testing procedure/ laboratory where tests are to be carried out<br />
shall be specifically brought out and agreed to prior to the signing of<br />
the Contract. The Contractor shall furnish to the Engineer a certificate<br />
of compliance of tests carried out. In addition, tests reports from<br />
manufacturer clearly identifiable to the lot of materials shall be<br />
furnished at the Contractor’s cost. The decision of the Engineer<br />
regarding testing procedure and <strong>specifications</strong> shall be final and<br />
binding on the Contractor.<br />
1.15 BASIC MATERIALS :<br />
1.15.1 Cement :<br />
Ordinary Portland cement shall conform to IS 8112 (Grade 43) and IS<br />
12269 (Grade 53) only for PCC, RCC shall be used. Cement shall be<br />
stored as per relevant clauses of MORTH <strong>specifications</strong>.<br />
1.15.2 Coarse Aggregates :<br />
The size and quality of coarse aggregates for all concrete <strong>works</strong> shall<br />
conform to IS 383. They shall be tested as per relevant IS practice.<br />
Size : For RCC and PCC <strong>works</strong>, the maximum nominal size of coarse<br />
aggregates shall conform to Section 1705 of MORT & H <strong>specifications</strong>.<br />
Gravel : This shall not be permitted to be used for any concrete <strong>works</strong>.<br />
1.15.3 Fine Aggregates :<br />
1.15.4 Water :<br />
Grading and quality of fine aggregates shall conform to IS 383 and<br />
shall be tested as per relevant IS code practice.<br />
a) It shall be clean and free from deleterious materials and shall<br />
conform to IRC 21.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 327<br />
b) Permissible limits for solids shall be as given below:<br />
Organic : 200 mg/ litre.<br />
Inorganic : 3000 mg/litre<br />
Sulphate (SO4) : 500 mg/litre<br />
Chloride (C1) : 250 mg/litre<br />
Suspended matter : 2000 mg/litre<br />
c) The pH value shall generally be not less than 6, whenever<br />
necessary, test shall be done as per IS 3025.<br />
d) Under no condition, saline water shall be used for any construction<br />
purpose including curing.<br />
1.15.5 Steel Reinforcement :<br />
Steel reinforcement shall be any of the following:<br />
i) High yield strength deformed bars conforming to IS 1786 –<br />
1979/TMT bars of the <strong>CIDCO</strong> approved make.<br />
ii) Mild steel conforming to IS 432 (Part-I)<br />
1.15.6 Structural Steel<br />
a) All the work of structural steels hall conform to CI. 1900 of<br />
MORT & H Specification.<br />
b) Structural steel shall conform to IS 226 for mild steel, IS 961 for<br />
high tensile steel and IS 2062 for fusion welding quality steel or<br />
IS 1161 for steel tubes for structural use.<br />
c) Finished rolled steel materials shall be free from cracks, flaws,<br />
injurious seams, laps, blisters, ragged and imperfect edges and<br />
other defects. It shall have a smooth and uniform finish and shall<br />
be straightened in the mill before dispatch. They shall be free<br />
from loose mill scale, rust, pitting or other defects affecting its<br />
strength and durability.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 328<br />
1.15.7 Admixtures :<br />
a) Admixture may be permitted to be used in concrete <strong>works</strong> subject<br />
to satisfactory proven use only after a written permission from<br />
the Engineer is obtained.<br />
b) Admixture, if allowed to be used shall be such that they do not<br />
adversely affect the properties of concrete and have deleterious<br />
effect on steel reinforcement.<br />
c) Admixture shall conform to IS 6925 and 9103 of latest revisions.<br />
d) The use of such admixture shall be strictly in accordance with the<br />
manufacture’s instructions.<br />
e) The minimum cement quantity specified not be reduced on<br />
1.15.8 Other Materials :<br />
account of the admixtures.<br />
Any other material, used in the work and not covered in the above<br />
<strong>specifications</strong>, shall conform to the relevant MORT&H specification. The<br />
Engineer shall have the right to reject all or any of the materials offered<br />
or delivered for use in the <strong>works</strong>, if found not suitable for the purpose.<br />
1.16 EXECUTION OF WORKS:<br />
All items shall conform to the requirement laid down in M.O.R.T.H.<br />
specification and stipulations made herein. In case any item of work is<br />
not covered by these specification/stipulations the <strong>works</strong> shall be<br />
executed as per the latest editions of IRC or IS codes of practice.<br />
1. As the scope of work is the extension of bridge to the existing<br />
bridge structure. Utmost care shall be taken while execution<br />
without disturbing/damaging the existing structure. The<br />
contractor is wholly responsible for any damage/destruction to<br />
existing structure or foundation thereof.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 329<br />
2. Prevention of damage to the existing services like water supply<br />
lines, sewer lines, etc underneath the existing bridge.<br />
1.17 DRAINAGE DURING CONSTRUCTION:<br />
All embankment, subgrade, shoulder and pavement layers under<br />
construction shall be protected from any accumulation of water due to<br />
rain, springs, seepage or other causes and from erosion due to flow of<br />
water. All such layers under construction shall be provided with cross-<br />
fall to facilitate surface run off and, if necessary, the cross- fall shall be<br />
supplemented with temporary drains or pumping arrangements to<br />
prevent accumulation of water causing damage to the <strong>works</strong> and other<br />
properties.<br />
1.18 Prevention of damage to Embankments, sub-grade layers, pavement<br />
layers and shoulders in position.<br />
Excavation for new construction and placement of materials as their insitu<br />
processing and compaction for new construction shall be done in<br />
such a manner and with such precautions as not to cause any damages<br />
to embankments, sub-grade layers, shoulders and pavement layers in<br />
position including those preexisting and intended to form part of the<br />
improved <strong>road</strong>.<br />
1.19 DISPERSAL OF HAULING EQUIPMENT<br />
Hauling equipment bringing materials to the site of work shall be<br />
dispersed uniformly over the surface of the previously constructed layers<br />
in order to avoid rutting and uneven compaction. The materials from<br />
hauling equipment shall not be dumped in concentrated heaps but<br />
deposited as evenly distributed layers or windows consisted with the<br />
loose thickness to be achieved before compaction.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 330<br />
1.20 PROTECTION AGAINST PLYING OF TRAFFIC<br />
Layers of embankment, sub-grade, pavement and shoulder during<br />
construction as also after construction shall be protected against the<br />
plying of any kind of traffic other than construction equipment, till the<br />
new construction has been finally opened to traffic.<br />
1.21 APPROVAL OF MATERIALS, EQUIPMENT AND METHOD OF WORKS<br />
For all work involving procurement of material and equipment or<br />
choice of method or work by the Contractor, it shall be understood that<br />
the contractor shall keep the Engineer apprised well in advance of the<br />
exact sources, type and description of the materials and equipment, test<br />
date for materials and methods work. The Contractor shall arrange for<br />
trial work, as required by the Engineer, for demonstrating the efficiency<br />
and adequacy of the equipment material and working method in terms<br />
of these <strong>specifications</strong>.<br />
1.22 CONTROL TESTS ON MATERIALS DURING CONSTRUCTION<br />
1.22.1 The contractor shall use material in construction as conformed to the<br />
requirements regarding composition, grading, physical properties and<br />
Engineering characteristics, as specified for different kinds of materials.<br />
For this purpose, pre construction control test shall be carried out on<br />
representative samples collected at random of materials brought to<br />
construction site or at stock-piles at the specified frequency.<br />
1.22.2 A fresh series of construction control test shall be started every time<br />
whenever there are changes in the source of the materials or in the<br />
appearance of the materials as visually assessed by the Engineer.<br />
1.22.3 Additional numbers and types of construction control tests shall be<br />
carried out if it is considered necessary to do so by the Engineer for<br />
monitoring the variability and suitable of material brought to work site<br />
or to stock-pile by the contractor.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 331<br />
1.23 MATERIALS TESTING<br />
The physical properties and engineering characteristics of the materials<br />
mentioned in these <strong>specifications</strong> shall be established through<br />
appropriate tests on representative sample collected in such manner<br />
and at such frequency as decided by the Engineer. The tests shall be<br />
carried out in accordance with test method as mentioned in these<br />
<strong>specifications</strong> after taking into account the appropriateness of the test<br />
methods for <strong>particular</strong>s applications under consideration.<br />
1.24 QUALITY CONTROL ON WORK AND MATERIAL<br />
The Contractor shall be responsible for quality of work in entire<br />
construction work within the contract. Quality control shall be done as<br />
per Clause 900 of Ministry of Road Transport and Highway (Road<br />
Wings) specification for Road and Bridge work, 4 th revision. The<br />
contract rate quoted for various items of work in the bill of quantities<br />
shall be deemed to be inclusive of all costs of the provision indicated in<br />
that clause.<br />
1.25 SURVEYING AND MEASURING EQUIPMENTS<br />
Equipments for surveying and measurement on the <strong>works</strong> shall be<br />
procured by the Contractor for his use. The same shall also be made<br />
available to the Engineer at site for any work connected with the<br />
contract without any additional charges.<br />
2.0 EXCAVATION<br />
Work shall be carried out to Indian Standards and Code of Practices. In<br />
absence International Standards shall be followed. These shall be latest<br />
issue. List given hereunder is not to be considered as conclusive and is<br />
for reference and guidance only. Any discrepancies / conflict noticed
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 332<br />
2.1 SCOPE<br />
shall be directed to the Engineer for his direction/approval. However as<br />
a general rule more stringent specification shall take precedence.<br />
(1) IS 1200 Method of measurement of building and civil<br />
(Part I) engineering <strong>works</strong> - Part I : Earth Work.<br />
(2) IS 2720 Methods of test for soils. (All Parts)<br />
(3) IS 2809 Glossary of terms and symbols relating to soil<br />
mechanics.<br />
(4) IS 3764 Safety code for excavation work.<br />
(5) IS 4081 Safety code for blasting and related drilling operations<br />
(6) IS 4988 Glossary of terms and classifications of earth moving<br />
machinery (all parts).<br />
This part of the specification deals with general requirements for<br />
earthwork in excavation in different materials, site grading, filling in<br />
area shown in drawings, filling back around foundations, plinths and<br />
approach ramps, conveyance and disposal of excavated soil and<br />
stacking them properly as shown on the drawings or as directed by the<br />
Engineer and all operations covered within the intent and purpose of<br />
the <strong>specifications</strong>. The excavation in rock by blasting is not permitted.<br />
2.2 Classification of Earth :<br />
For purpose of earthwork soil shall be classified as under :<br />
Loose/soft soil : Any soil which generally yields to the application of<br />
picks and shovels, phawras, rakes or any such ordinary excavating<br />
implements or organic soil, gravel, silt sand, turf loam, clay, peat etc.<br />
fall under this category.<br />
Dense/Hard Soil: Any soil which generally requires the close<br />
application of picks, or jumpers or scarifiers to loosen it. Stiff clay,<br />
gravel and cobble stone etc. fall under this category. (Note : Cobble
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 333<br />
stone is the rock fragment usually rounded or semi-rounded having<br />
maximum diameter in any one direction between 80 & 300 mm.)<br />
Mud : Mud is a mixture of ordinary soft soil and water in fluid or weak<br />
solid state.<br />
Soft/Disintegrated rock : (Not requiring blasting). This shall include<br />
the type of rock and boulders which may be quarried or split with crow-<br />
bars. Laterite and hard conglomerate also come under this category.<br />
Hard Rock: (Requiring blasting) : This shall include the type of rock or<br />
boulder which for quarrying or splitting requires the use of mechanical<br />
plant or blasting.<br />
2.3 GENERAL<br />
(Note : Boulder is a rock fragment usually rounded by weathering,<br />
disintegration and explosion or abrasion by water or ice having a<br />
maximum dimension in any direction of more than 600 mm).<br />
Hard Rock : (Requiring blasting but where blasting is prohibited) under<br />
this category shall fall hard rocks which though normally require<br />
blasting for their removal but blasting is prohibited and excavation has<br />
to be done by chiseling, wedging or other suitable method.<br />
2.3.1 The Contractor shall furnish all tools, plant, instruments, qualified<br />
supervisory staff, labour, materials, any temporary <strong>works</strong>, consumables<br />
and everything necessary, whether or not such items are specifically<br />
stated herein, for completion of the job in accordance with the<br />
specification requirements.<br />
2.3.2 The Contractor shall carry out the surveys of the site before excavation<br />
and set out properly all lines and establish levels for various <strong>works</strong> such<br />
as earthwork in excavation for grading, foundations, plinth filling, <strong>road</strong><br />
drains, cable trenches, pipelines, culverts, retaining walls etc. Such
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 334<br />
surveys shall be carried out taking accurately cross sections of the area<br />
perpendicular to the grid lines at intervals determined by the Engineer<br />
depending on the ground profiles. These will be checked by the<br />
Engineer or his representative and thereafter properly recorded.<br />
2.3.3 The excavation shall be done to correct lines and levels. This shall<br />
include where required, proper shoring to maintain excavation and<br />
also the furnishing, erection and maintaining of substantial barricades<br />
around excavations and warning lamps at night for safety purposes.<br />
2.3.4 The rates quoted shall include for dumping of excavated material in<br />
regular heaps, bunds, rip rap with regular slopes as directed by the<br />
Engineer within the lead specified and leveling the same so as to<br />
provide natural drainage. Rock/soil excavation shall be properly<br />
stacked as directed by the Engineer. As and more resistant materials,<br />
forming the casing on the sides and the top. Rock shall be stacked<br />
separately.<br />
2.4 CLEARING<br />
The area to be excavated/filled shall be cleared of all fences, trees,<br />
plant logs, stumps, bush, vegetation, rubbish, slush etc. and other<br />
objectionable matter. If any roots or stumps of trees are met during<br />
excavation, they shall be removed. The material so removed shall be<br />
disposed off as directed by the ENGINEER.<br />
Where earthfill is intended, the area shall be cleared of all<br />
matter/materials before filling commences. No separate payment shall<br />
be made for such clearing <strong>works</strong>.<br />
2.5 PRECIOUS OBJECTS, RELICS, OBJECTS OF ANTIQUITIES ETC.<br />
All gold, silver, oil, minerals, archaeological and other findings of<br />
importance or other materials of any description and all precious<br />
stones, coins, treasure troves, relics, antiquities and similar things
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 335<br />
which may be found in or upon the site shall be the property of the<br />
<strong>CIDCO</strong> and the Contractor shall duly preserve the same to the<br />
satisfaction of the ENGINEER and from time to time deliver the same<br />
to him.<br />
2.6 EXCAVATION FOR STRUCTURES<br />
2.6.1 Description<br />
2.6.2 Setting out :<br />
2.6.3 Excavation :<br />
Excavation for structures shall consist of removal of materials for the<br />
construction of the foundations of columns, footings, walls and other<br />
similar structures in accordance with the requirements of this<br />
specification and the lines and dimensions shown on the drawings or<br />
as indicated by the ENGINEER. The work shall include all necessary<br />
sheeting, shoring, bracing, draining and pumping; the removal of all<br />
logs, stumps, shrubs and other deleterious matter and obstruction<br />
necessary for placing the foundations, trimming bottoms of excavation;<br />
backfilling, cleaning up the site and disposal of all surplus materials.<br />
After the site has been cleared as per clause 4.0 above, the limits of<br />
excavation shall be set out true to lines, curves, slopes, grades and<br />
sections as shown on the drawings or as directed by the ENGINEER.<br />
The Contractor shall provide all labour, survey instruments and<br />
materials such as string, pegs, nails, bamboos, stones, lime, mortar,<br />
concrete, etc. required in connection with the setting out of <strong>works</strong> and<br />
establishment of bench marks. The Contractor shall be responsible for<br />
the maintenance of bench marks and other marks and stakes as long<br />
as they are required for the work in the opinion of the ENGINEER.<br />
a) Excavation shall be taken to the width of the lowest step of<br />
footing or the pile caps and the sides shall be left plumb where
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 336<br />
the nature of the soil allow it. Where the nature of the soil or<br />
the depth of excavated trench/pit does not permit vertical sides,<br />
the Contractor at his own expense shall put up necessary<br />
shoring, strutting and planking or cut slopes to a safe angle or<br />
both with due regard to the safety of personnel and the <strong>works</strong><br />
and to the satisfaction of the ENGINEER.<br />
b) The depth to which the excavation is to be carried out shall be as<br />
shown on the drawings unless the type of material encountered<br />
is such as to require changes, in which case the depth shall be<br />
as ordered by the ENGINEER.<br />
c) If contractor prefers for mass excavation of building, he may do<br />
so with the prior permission of ENGINEER. The payment of<br />
excavation and disposal shall be restricted only to minimum<br />
excavation allowed as per mode of payment. Excavation shall be<br />
fully protected against the slide and slopes.<br />
d) The material suitable for backfilling shall be stacked separately.<br />
2.6.3.1 Excavation in all types of soil except rock:<br />
Shall mean excavation in vegetation soil, turf, loam, clay, mud black-<br />
cotton soil, earth murrum (hard or soft) shingle and generally any<br />
material which requires close application of picks or scarifies to loosen<br />
and not affording much resistance to digging.<br />
2.6.3.2 Excavation in rock not requiring blasting:<br />
Shall mean excavation in lime stone, sand stone, laterite, hard<br />
conglomerate or other rock which can be quarried or split with crow<br />
bars or, wedges. This shall include unblasted boulders.<br />
2.6.3.3 Excavation in rock requiring blasting:<br />
Shall mean excavation in hard rock requiring blasting encountered at<br />
places of excavations.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 337<br />
The Contractor shall obtain license from District/Public authorities for<br />
carrying out blasting work as well for obtaining transporting and<br />
storing explosives as per 'Explosives Rules 1940' or as amended. He<br />
shall purchase the explosives, fuses, detonators etc. only from a<br />
licensed dealer. He shall maintain the account of explosives etc.<br />
purchased and used by him. He shall be responsible for safe custody<br />
and proper accounting of explosive materials. Contractor will be fully<br />
responsible for any breach of the aforesaid Act.<br />
Blasting shall normally be done with gun powder. Dynamite, Gelatin or<br />
any other high explosives shall only be used in special cases with<br />
written permission of the Architect and District authorities concerned<br />
under ‘Explosive Rules'.<br />
Blasting operations shall be carried out under supervision of a<br />
responsible representative of the Contractor during certain hours,<br />
preferably during lunch break as approved in writing by the Architect.<br />
The representative shall be conversant with the rules of blasting.<br />
Proper precautions for safety of persons shall be taken. Red flags shall<br />
be prominently displayed around the area to be blasted and all people<br />
on work except those who actually light the fuses shall be withdrawn to<br />
safe distance of not less than 100 meters from the blast. Blasting shall<br />
not be done within 100 metres of an existing masonry or any other<br />
kind of structure unless special precautions are taken by heavy<br />
blanketing etc. The Contractor shall be responsible for any damage to<br />
the person and/or property either directly or incidental to such blasting<br />
including his employees.<br />
Where blasting is not practical or is prohibited, excavation shall be<br />
done by wedging or chiseling and it shall be restricted to the quantity<br />
required to enable the necessary foundation to be put in. The item also<br />
covers bailing out subsoil water or rainwater including pumping at any<br />
stage of the work, shoring strutting etc.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 338<br />
2.6.4 Dewatering and Protection :<br />
Where water is met with in excavation due to stream flow, seepage,<br />
springs, rain or other reasons, the Contractor shall take adequate<br />
measures such as bailing, pumping, construction of diversion channels,<br />
drainage channels, bunds, cofferdams and other necessary <strong>works</strong> to<br />
keep the foundation trenches/pits dry when so required and to keep the<br />
green concrete / masonry against damage by erosion or sudden rise of<br />
water level. The method to be adopted in this regard and other details<br />
thereof shall be left to the choice of the Contractor but subject to the<br />
approval of the Engineer. Approval of the Engineer shall, however, not<br />
relieve the Contractor of his responsibility for the adequacy of<br />
dewatering and protection arrangements and the safety of the <strong>works</strong>.<br />
Where cofferdams are required, these shall be carried to adequate<br />
depths and heights, be safely designed and constructed and be made<br />
as watertight as is necessary for facilitating construction to be carried<br />
out inside them. The interior dimensions of the cofferdams shall be<br />
such as to give sufficient clearance for constructions and inspection and<br />
to permit installation of pumping machinery inside the enclosed area.<br />
Pumping from inside of any foundation enclosure shall be done in such<br />
a manner as to preclude the possibility for the movement of water<br />
through any freshly placed concrete. No pumping shall be permitted<br />
during the placing of concrete or for any period of at least 24 hours<br />
thereafter, unless it is done from a suitable sump separated from the<br />
concrete work by a water tight wall or similar means. At the discretion<br />
of the Contractor shall take all precautions in diverting channels and in<br />
discharging the drained water so as not to cause damage to the <strong>works</strong><br />
or to the adjoining property.<br />
2.6.5 Preparation of Foundation :<br />
The bottom of the foundation shall be leveled both longitudinally and<br />
transversally or stepped as directed by the Engineer. Before the footing
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 339<br />
is laid, the surface shall be slightly watered and rammed. In the event<br />
of the excavation having been made deeper than that shown on the<br />
drawing or as otherwise ordered by the Engineer, the extra depth shall<br />
be made up with concrete or masonry of the foundation grade at the<br />
cost of the Contractor. Ordinary filling shall not be used for the<br />
purpose to bring the foundation to level.<br />
When rock or other hard strata is encountered, it shall be freed of all<br />
loose and soft materials, cleaned and cut to a firm surface either level,<br />
stepped, or serrated as directed by the Engineer. All seams shall be<br />
cleaned out and filled with cement mortar or grout to the satisfaction of<br />
the Engineer.<br />
2.6.6 Slips and Blows :<br />
2.6.7 Backfilling :<br />
If there are any slips or blows in the excavation, these shall be removed<br />
by the Contractor at his own cost.<br />
To the extent available, selected surplus soil from the excavation shall<br />
be used as backfill. Fill materials shall be free from clods, salts,<br />
sulphates, organic or other foreign materials. All clods of earth shall<br />
be broken or removed. Where excavated material is mostly rock, the<br />
boulders shall be broken into pieces not larger than 250 mm size<br />
mixed with properly graded fine materials consisting of murrum or<br />
earth to fill up the voids and the mixture used for filling.<br />
If any selected fill material is required to be borrowed, the Contractor<br />
shall make his own arrangement for bringing the material from outside<br />
borrow pits. The material sources shall be subject to the prior approval<br />
of the Engineer. The Contractor shall make necessary access <strong>road</strong>s to<br />
such borrow areas at his own cost, if such access <strong>road</strong>s do not exist.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 340<br />
The Contractor shall make necessary payment of royalty charges with<br />
the concern Authority for obtaining quarry permit.<br />
The selected fill material shall be approved quality murrum having<br />
liquid limit not more than 40 and plasticity index not more than 20 and<br />
minimum dry density not less than 1700 kg per cu.m.<br />
Backfilling of the foundation trenches/pits shall be done as soon as the<br />
foundation work has been completed to the satisfaction of the<br />
ENGINEER and measured but not earlier than the full setting of the<br />
concrete or masonry of the foundation. Backfilling shall be carried out<br />
in such a manner as not to cause undue thrust on any part of the<br />
structure. Backfilling shall be done in space around the foundations<br />
after clearing it of all debris and in layers of 250 mm loose thickness,<br />
watered and compacted to the satisfaction of the ENGINEER and upto<br />
the original surface.<br />
2.6.8 Disposal of Surplus Excavated Materials:<br />
All the excavated materials shall be the property of the <strong>CIDCO</strong> where<br />
the excavated material is directed to be used in the construction of the<br />
<strong>works</strong> for the general grading, plinth filling or embankments, the<br />
operations shall be arranged in such a manner that the capacity for<br />
cutting, haulage and compaction are nearly the same.<br />
All hard materials such as hard murum, rubble etc. not intended for<br />
filling in foundations, plinth or embankments, shall be stacked neatly<br />
for future use as directed by the ENGINEER within the lead specified.<br />
Unsuitable or surplus materials not intended for use in part of the<br />
<strong>works</strong> or for reuse shall be disposed of as directed by the ENGINEER.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 341<br />
2.7 MEASUREMENT AND RATES:<br />
The measurement shall be generally conforming to IS:1200, Part-I<br />
unless otherwise specified. Measurement for excavation of foundations<br />
and footing shall be as required for the exact width, length and depth<br />
as shown of figured on the drawings or as may be directed by the<br />
ENGINEER. If taken out to a greater width, length or depth than shown<br />
or required, the extra work occasioned thereby shall be done at the<br />
Contractor's expenses.<br />
The dimensions of the trenches and pits shall be measured correct to<br />
the nearest cm. and cubical contents worked out in cubic metres,<br />
correct to two places of decimal.<br />
Measurements of filling excavated earth or sand in plinth or under<br />
floors: depth of consolidated earth fillings, shall be measured for the<br />
purpose of payments. The dimensions of the fillings shall be measured<br />
correct to the nearest cm. and cubical contents worked out in cubic<br />
metres correct to the two places of decimal.<br />
Rate for earth work shall include the following :<br />
a) Excavation and disposing of all excavated materials as specified.<br />
b) Setting out <strong>works</strong>, profiles etc.<br />
c) Site clearance such as cleaning of rank vegetation, shrubs,<br />
brushwood.<br />
d) Forming (or leaving)" dead mean" or "tell tales" and their<br />
removals after measurement<br />
e) Bailing out water in excavation from rains, sub-soil water etc.<br />
f) Protection and temporarily supporting of existing services, of<br />
pipes, water mains, cables etc. met within the course of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 342<br />
excavation. Care shall be taken not to disturb electric and<br />
communication cables. Removal of such cables, if necessary,<br />
shall be arranged by the ENGINEER.<br />
g) Forming (or leaving) steps in sides of deep trenches and their<br />
removal.<br />
h) Removing slips or falls in excavation including necessary shoring<br />
& strutting.<br />
i) Fencing and/or other suitable measures for protection against<br />
risk of accidents as approved by the ENGINEER.<br />
j) Excavation for insertion of planking and strutting where required,<br />
and<br />
k) Backfilling the trenches foundations (sides of footings) with<br />
selected excavated materials.<br />
l) Payment of necessary royalty charges for excavation and<br />
contractor’s material brought from outside.<br />
3.0 Providing and laying dry trap rubble soling 23 cm. thick including hand<br />
3.1 General:<br />
packing and filling the voids with rubble chips including watering and<br />
compaction etc. complete.<br />
The item provides for supply of dry trap rubble soling and labour for<br />
laying of specified type of stones in the specified thickness including<br />
preparing the subgrade to proper section by scraping, dressing,<br />
watering and compaction with vibratory roller etc. and hand packing<br />
the rubble chips to the required line, curve, grade and section.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 343<br />
3.2 Diversion:<br />
When the traffic can be allowed on the <strong>road</strong> side berms without much<br />
inconvenience to traffic or impediment to the work, this shall be<br />
provided by the contractor at his own cost. He shall provide the<br />
necessary barricading, warning boards and signals and watchmen by<br />
day and red lights at night and comply with relevant provisions of<br />
specification. Otherwise, a separate diversion shall be provided.<br />
3.3 Construction:<br />
3.3.1 Preparation of sub-grade:<br />
The sub-grade shall be marked by stakes and strings for the required<br />
width for laying of the soling in line, curve, section and grade with<br />
reference to the centre line. The edge line stakes shall be ranged for a<br />
sufficiently long length to obtain straight lengths and uniform curves.<br />
The contractor shall clear off the area and do the necessary trimming<br />
or filling for laying of the soling in line, curves, grades and section. All<br />
fillings shall be watered and compacted to get maximum consolidation.<br />
The camber, super elevation etc. of the sub-grade shall conform in<br />
shape to loose, undulating or uneven, the contractor shall at his own<br />
cost make it up with suitable material, water and compact it and obtain<br />
the correct section. Camber boards shall be used to get the required<br />
section.<br />
3.3.2 Laying soling:<br />
The rubble collected by the <strong>road</strong>side shall be laid with the largest face<br />
downwards and in contact with each other. The stone shall break joint<br />
as far as possible. The full thickness of the soling shall generally be<br />
made with one stone only. The junction of the old <strong>road</strong> and the new
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 344<br />
construction shall be diagonal in plan and the soling shall be in level<br />
with the corresponding course of the <strong>road</strong>.<br />
Unless otherwise provided in the plans or directed by the Engineer, the<br />
width of the soling shall be 23 cm. more than that of the metal above.<br />
3.3.3 Hand-packing:<br />
As the laying of rubble advances the soling shall be hand packed by<br />
wedging and packing with 80 mm metal collected for the purpose in<br />
the joints of the soling and driving them by hammers in place so as to<br />
fill the voids as completely as possible. This operation of hand packing<br />
shall follow the rubble laying closely.<br />
3.4 Item to include:<br />
1) Setting out including labour and materials like stakes, strings,<br />
fish line, boning rods, and camber boards.<br />
2) Diversion, barricading, signaling and controlling traffic if<br />
necessary unless separately provided in the tender.<br />
3) Conveying the rubble from stacks on the <strong>road</strong>side and laying the<br />
soling to the required line, curve, grade and section including<br />
clearing, sectioning, dressing grades and section and<br />
compacting the section, breaking rubble and hand packing with<br />
80mm metal, filling the voids with rubble chips, sand, stone<br />
screening etc.<br />
4) All labour, materials and use of equipment and tools required<br />
for carrying out the work satisfactorily.<br />
3.5 Mode of Measurement & Payment:<br />
The contract rate shall be for one cubic metre of soling laid, hand<br />
packed and finished.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 345<br />
The width and depth shall be restricted to the specified width and<br />
depth. The dimensions shall be recorded correct upto two places of<br />
decimals of metre and the quantity calculated correct upto two places<br />
of decimals of a cubic metre. No deduction shall be made for voids.<br />
4.0 Providing trap/granite/quartzite/gneiss rubble filling behind<br />
4.1 Materials:<br />
the abutments, returns or wings.<br />
The stones to be used shall be broken rubble with fairly regular shape<br />
and not weathered or decayed stones and confirming to Appendix-6 of<br />
IRC:78-2000 Specifications. Stones shall be selected for their larger<br />
size. The stone shall be about 0.015 cub. M. or 15 litres (about ½ c.ft.)<br />
in size unless otherwise ordered by the Engineer, having regard to the<br />
nature of the stone being quarried. The stones to be used for wedging<br />
in the joints between stones shall be chips of such size as to snugly fill<br />
up the interstices in most cases. All suitable rubble obtained from<br />
foundation excavation shall be made use of first. The rate to be<br />
charged for this rubble to the contractor shall be that which is entered<br />
in the schedule A and if not so entered, the Divisional schedule rate<br />
current at the time of tender.<br />
4.2 Details of construction:<br />
Dewatering if necessary shall be done. The bed on which rubble filling<br />
is to be laid shall be cleared of all loose materials leveled and<br />
consolidated and got approved by the Engineer before starting rubble<br />
filling. Rubble filling behind abutments, returns or wings shall be laid in<br />
regular horizontal layers of not more than 30 cm. (about 12”) in<br />
thickness closely packed and compacted and firmly set with their<br />
b<strong>road</strong>est face downwards. The interstices between adjacent stones shall<br />
be wedged in with spalls of the proper size, well driven in with
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 346<br />
hammers or wooden mallets to ensure tightly packed layers. Such<br />
wedging shall be carried on simultaneously with the placing in position<br />
of the larger stones in each layer and shall in no case be permitted to<br />
fall behind. Each layer shall be packed and completed before the<br />
upper layer is started.<br />
Backfilling required to be done if any, on the river-side of the<br />
abutment, wings or returns shall be done simultaneously with the filling<br />
on the landside. Special precautions should also be taken to prevent<br />
wedging action against masonry. The masonry shall have been fully<br />
cured before rubble filling.<br />
4.3 Item to Include:<br />
1) Supplying broken rubble and spalls of approved quality and<br />
size.<br />
2) All labour, materials and use of equipment and tools for<br />
properly laying, hand packing and compacting the rubble.<br />
3) Any other incidental charges to complete the work as per<br />
sanctioned plan including dewatering unless separately provided<br />
in the tender.<br />
4.4 Mode of measurement and payment:<br />
Rubble filling shall be measured in cubic metre limiting the dimensions<br />
to those shown in the plan or as directed by the Engineer. The<br />
dimensions shall be measured to two places of decimals in metres and<br />
quantities worked out to two places of decimals of a cubic metre.<br />
No deduction shall be made for voids.<br />
The contract rate shall be for a unit of one cubic metre.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 347<br />
5.0 CONCRETE – PLAIN AND REINFORCED LIST OF BUERAU OF<br />
5.1 CEMENT :<br />
INDIAN STANDARD CODE OF PRACTICE (ISI)<br />
12269-53 grade ordinary Portland cement<br />
8112-43 grade ordinary Portland cement<br />
269-33 grade ordinary Portland cement<br />
383- Coarse and fine aggregates from natural source for<br />
concrete<br />
456- Code of practice for plain and reinforced concrete<br />
516- Method of tests for strength of concrete<br />
2386- Method of test for aggregate for concrete work<br />
9103- Admixture for concrete<br />
4926- Specification for Ready Mix Concrete<br />
2386- Methods of test for aggregates for concrete<br />
The cement used shall be of the following type with the prior approval<br />
of the Engineer :<br />
Type of Cements I.S. No. Remarks<br />
O.P.C. 53 Grade IS: 12269 For all RCC & PCC <strong>works</strong><br />
O.P.C. 43 Grade IS: 8112 For all RCC & PCC <strong>works</strong><br />
Mineral admixture are allowed to be used in the concrete as per IS:<br />
456-2000.<br />
USE :<br />
Cement shall be used in the order in which it is received on site.<br />
Cement in bags in bag in storage for a period more than 3 months,<br />
shall be retested before use and rejected by Engineer in charge if found<br />
unsuitable.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 348<br />
TESTING :<br />
A sample shall be tested for every batch of cement delivered on site on<br />
once or for every 1000 bags, whichever is more frequent. Tests shall<br />
be carried out for consistency fineness, soundness initial and final<br />
setting time, and compressive strength (IS : 4031) and the results<br />
approved by the Engineer before use of the cement in permanent<br />
<strong>works</strong>. Samples shall be taken immediately on receipt of cement at<br />
site. The methods and procedure of sampling shall be in accordance<br />
with IS:3535. The Engineer may specify other forms of sampling and<br />
tests including chemical analysis, (IS : 4032) if in his opinion the<br />
cement is of doubtful quality; the costs of such additional tests shall be<br />
borne by the Contractor. Each and every lot of cement shall be<br />
accompanied by the manufacturer’s Test Certificate.<br />
5.2 FINE AGGREGATES (SAND)<br />
5.2.1 It shall be river sand conforming to IS : 383, obtained from sources<br />
approved by the Engineer. These sands, if found coarser, shall be<br />
suitably blended with finer sand obtained from approved source to<br />
obtain the desired grading. The two types of sand will be stacked<br />
separately and their mixing in the specified proportions shall be at the<br />
Contractor’s cost.<br />
The sand shall not contain more than a total of 3% by weight of shale,<br />
clay, silt and other structurally weak particles.<br />
If permitted by the Engineer crushed stone sand produced from stones,<br />
suitable for concrete aggregate, and manufactured in special sand<br />
producing crushers such as impactors, hammer mills and processed<br />
through stone on stone, vertical shaft crushers for particle shaping and<br />
excess fines removed by suitable dust extractors. The particle shape
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 349<br />
shall be nearly cubical. If crushed stone sand contains high percentage<br />
of fines, the sand will be separated in two fractions viz. 0 –2.36 mm<br />
and 2.36 – 4.75 mm size. These two fractions will be suitably blended<br />
to obtain desired grading of sand. If case of crushed stone sand the<br />
fines 0.15 mm shall be less than 5%. The crushed stone sand shall be<br />
tested for flow time and voids as per ASTM 1252, and if found suitable<br />
shall only will be used.<br />
5.2.2 The grading of the sand shall conform to IS : 383<br />
The grading of sand can be improved by mixing two sands. The sand<br />
shall be screened on 4.75 mm size vibratory screen to eliminate over –<br />
size particles.<br />
The sand shall be washed in screw type mechanical washers in potable<br />
water to remove excess silt, clay and chlorides. The screening and<br />
washing of sand shall be completed at least one day before using it in<br />
concrete.<br />
The washed sand shall be stored on a sloping concrete platform to<br />
drain excess water and in such a manner as to avoid contamination.<br />
The fine aggregate shall be subjected to tests in accordance with IS :<br />
2386 as may be ordered by the Engineer.<br />
5.3 COARSE AGGREGATES :<br />
5.3.1 Coarse aggregates for the <strong>works</strong> shall be crushed stone conforming to<br />
IS : 383, obtained from sources, approved by the Engineer. Quarries<br />
production aggregates of nearly cubical shape shall be approved.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 350<br />
Aggregates shall be properly screened and if necessary washed clean<br />
before use.<br />
5.3.2 Coarse aggregates containing flat or flaky pieces or mica shall be<br />
rejected.<br />
5.3.3 Coarse aggregates shall be supplied in the following sizes:<br />
Nominal Size Maximum size Minimum size<br />
10 mm 12 mm 5 mm<br />
20 mm 25 mm 10 mm<br />
40 mm 40 mm 20 mm<br />
80 mm 80 mm 40 mm<br />
5.3.4 The grading of coarse aggregate shall be such that not more than 5%<br />
shall be larger than the maximum size and not more than 10% shall be<br />
smaller than the minimum size. Between these sizes the coarse<br />
aggregate shall be well graded.<br />
5.3.5 The aggregates shall be subjected to tests in accordance with IS 2386<br />
as may be ordered by the Engineer.<br />
5.3.6 Aggregates shall be stored in such a way as to prevent segregation of<br />
sizes and avoid contamination with fines.<br />
5.4 BLENDING OF AGGREGATES:<br />
In order to obtain optimum workability, individual aggregates of<br />
nominal size 20mm, 10mm and 4.75 mm and 2.36mm will be<br />
blended in such a way that the grading curve for all in aggregates will<br />
be a smooth curve from size 0.15mm to 25mm, falling within the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 351<br />
established envelope grading curve. Contractor shall establish<br />
envelope grading curve for each grade of concrete for given M.S.A.<br />
and get it approved by engineer, before finalizing the mix design.<br />
5.5 MIXERS AND VIBRATORS :<br />
5.5.1 For all structural concreting work the contractor shall provide weigh<br />
batching plant of suitable capacity which shall be got approved before<br />
bringing it to the site or procure the concrete from <strong>CIDCO</strong> approved<br />
RMC plant.<br />
5.5.2 For non-structural concreting work concrete may be produced at site by<br />
approved method.<br />
5.5.3 The contractor shall provide at site concrete Vibrators, Immersion Type,<br />
IS:2505 – Screed Board Concrete Vibrators, IS : 2506 supplied by<br />
recognized manufacturers. Also suitable capacity form vibrators will be<br />
used if required.<br />
5.6 GRADE OF CONCRETE :<br />
The concrete is designated as follows :-<br />
Concrete M30/20, the letter M refers to the mix, the number 30<br />
represents the characteristic compressive strength of 150 mm size<br />
cubes in Mpa at 28 days. The number 20 represents the maximum<br />
nominal size of aggregate in the mix, in this 20 mm.<br />
5.7 DESIGN OF CEMENT CONCRETE MIXES :<br />
The design of concrete mixes for various concrete items to the work<br />
shall be obtained by the contractor at his cost from an approved<br />
laboratory preferably from <strong>CIDCO</strong>’S Lab. The contractor shall submit
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 352<br />
in advance details of such designs to the Engineer-in-charge for his<br />
prior approval. All the cement concrete of grade M-15 and higher<br />
strength shall be carried out as controlled concrete only and shall be<br />
done with proper mix design. The mix design shall be got approved<br />
from the Engineer-in-charge from time to time whenever there is source<br />
and type of cement and aggregates and change in the gradation of<br />
aggregates.<br />
5.7.1 For Concrete of Grade M-15, M-20, M-25, M-30 :<br />
Preliminary mix design must be carried out from laboratory.<br />
5.7.1.1 The minimum size of aggregate permissible shall be as per IS : 383-<br />
1970 & IS : 456-2000 and in latest amendments, if any.<br />
5.7.1.2 No extra payment over and above the accepted tender rate shall be<br />
made or as reduction in the accepted tender shall be effected in case of<br />
variation in the construction of cement concrete because of the mix<br />
designs or change in the mix design from the standard requirements<br />
for equivalent nominal mix.<br />
5.7.1.3 All the expenses of preliminary mix design, subsequent field laboratory<br />
mix design, work tests shall be borne by the contractor.<br />
5.7.1.4 If the average strength of concrete cube falls below the required<br />
strength, fresh preliminary mixes for that grade shall be made as<br />
before/ Until the trial mixes yield cubes of compressive strength at 28<br />
days greater than the required average strength at the age i.e. fck + 4<br />
N/mm2 as per I.S. 456-2000.<br />
5.7.1.5 Whenever there is a significant change in the quality of any of the<br />
ingredients for concrete, the Engineer may at his discretion order to<br />
carrying out of fresh trail mixes. All costs for trial mixes and tests shall<br />
be to contractor’s account and held to be included in the contract rates.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 353<br />
5.7.1.6 Before commencing the <strong>works</strong> the contractor shall submit the Engineer<br />
for approval full details of all preliminary trial mixes and tests.<br />
5.7.1.7 When the proportions of a concrete mix have been approved by the<br />
Engineer the contractor shall not vary the quality or source of the<br />
materials or the mix without the written approval of the Engineer.<br />
5.7.2 The cement content W.C. ratio and maximum size of aggregate for<br />
different grades of concrete and the required average strengths at 28<br />
days for which the mixes shall be designed are specified below:-<br />
Grade of<br />
concrete<br />
Characteristic<br />
strength<br />
(f’ ck Mpa)<br />
TABLE-1<br />
Min.<br />
cement<br />
Content<br />
kg/m 3<br />
Max<br />
W/C<br />
Remarks<br />
M-20 20 310 0.45 For PCC bedding<br />
M-20 20 310 0.40<br />
M-30 30 400 0.40<br />
For PCC bridge<br />
work<br />
For RCC bridge<br />
work<br />
M-35 35 400 0.40 For all RCC work<br />
Note: 1) If the contractor is unable to obtain the required concrete strength, with<br />
the given minimum dosage of cement, he can with specific approval of<br />
Engineer, increase the cement dosage. In such cases, no extra<br />
payments will be made for the use of extra cement.<br />
2) Use of approved super plasticizer, at contractor’s cost is mandatory.<br />
Table – 2 given below, shown, the range of slump for concreting in<br />
various areas and conditions.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 354<br />
TABLE - 2<br />
Sr.<br />
No.<br />
Area of Concrete work Slump mm<br />
1a Structure with exposed inclined surface requiring low slump 25<br />
concrete to allow proper compaction<br />
1b Plain C.C. 25<br />
2 R.C.C. structure with widely spaced reinforcements i.e. solid<br />
columns, piers, abutments, footings, well-steinings<br />
3 R.C.C. structures with fair degree of congestion of<br />
reinforcement. Viz. pier and abutment caps, box culvers, weil<br />
curbs, well caps, wall with thickness greater than 300mm<br />
4 R.C.C. and PSC structures, with highly congested<br />
reinforcement viz deck slab, girders box girders, wall with<br />
thickness less than 300mm.<br />
5 Under water concreting through tremie, bottom plug, cast in<br />
situ piling<br />
40 to 50<br />
50 to 75<br />
75 to 125<br />
100 to 200<br />
6 Cast in situ piling work using tremie pipe 100 to 180<br />
Note:<br />
1. The slump of structure concrete with water will be 25mm (Max). Any<br />
slump in excess of 25mm, shall be obtained by adding suitable dose of<br />
approved super plasticizer.<br />
2. In case of pumped concrete the slump requirement may be kept as per<br />
RMC mix design. Excess slump (above 25mm) shall be obtained by<br />
adding suitable dose of approved admixture/plasticiser.<br />
The mixes are designed to yield mean strengths (f’ cm) greater than the<br />
corresponding specified characteristic strengths (f’ ck) as indicated in<br />
Table 1. The difference between f’ cm and f’ ck is called the ‘Current<br />
Margin’. The concrete mixes shall be designed on the basis of required
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 355<br />
strength, impermeability, desired workability, the maximum size of<br />
aggregate and also the various cements. Accordingly the required<br />
cement content shall be ascertained.<br />
5.7.3 For each grade a total of 18 cubes and 3 cylinders of size 150 mm dia<br />
and 160 mm highs shall be made. Of these 18 cubes made not more<br />
than 6 may be made on any day and further, of the 6 cubes made in<br />
one day not more than 2 each representing a different batch of<br />
concrete shall be tested at the age of 28 days. The making of the<br />
cubes, their curing, storing, transporting and testing shall be in<br />
accordance with Indian Standards I.S. 516. After 28 days of curing the<br />
cylinders will be tested for permeability as per MORT&H clause 1716.5<br />
and DIN 1048. The tests shall be carried out in a laboratory approved<br />
by the Engineer.<br />
5.7.4 If the average strength of the concrete cubes falls below the required<br />
target mean strength (f’ cm), fresh preliminary mixes for that grade<br />
shall be made as before, until the trial mixes yield cubes of compressive<br />
strength at 28 days greater than the required average target mean<br />
strength (f’ cm) at that age.<br />
5.7.4.1 Where concrete is produced at continuous production unit, such as<br />
ready mix concrete plant, the Engineer may allow use of established<br />
mix design, provided it complied with all requirements of tender<br />
<strong>specifications</strong>. In this case, the responsibility of attaining required<br />
strength and other properties lies with the supplier and contractor. The<br />
manufacturer shall submit the detailed calculation of mix design if<br />
desired by Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 356<br />
5.7.5 Whenever there is significant change in the quality of any of the<br />
ingredients for concrete, the Engineer may at his discretion order to<br />
carry out fresh trial mixes. All costs for trial mixes and tests shall be to<br />
be Contractor's account and held to be included in the contract rate.<br />
5.7.6 Before commencing the <strong>works</strong> the Contractor shall submit to the<br />
Engineer for approval full details of all preliminary trial mixes and tests<br />
including complete calculation of mix design and properties various<br />
ingredients.<br />
5.7.7 The Contractor shall carry out trials to establish the correctness of<br />
grading of aggregates, suitability of plasticiser, formwork, mould<br />
release agent etc. to obtain necessary strength and surface finish. All<br />
costs of such trial casting shall be included in the contract rates.<br />
5.7.8 When the proportions of a concrete mix have been approved by the<br />
Engineer, the Contractor shall not vary the quality of source of the<br />
materials or the mix without the written approval of the Engineer.<br />
5.7.9 It is complete responsibility of contractor to design the concrete mixes,<br />
by approved standard methods and to produce, the concrete<br />
confirming to MORT&H <strong>specifications</strong>. It is expected that the contractor<br />
employ competent staff to carry out this work.<br />
5.8.0 Concrete Test:<br />
5.8.1 Concrete Cubes Tests:<br />
The quality of hardened concrete will be verified by the following<br />
procedure during routine concreting work.<br />
5.8.2 Sampling and Strength of designed concrete mix:<br />
5.8.2.1 General:<br />
Samples from fresh concrete shall be taken as per IS:1199 and cubes<br />
shall be made, cured and tested at 28 days in accordance with IS: 516.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 357<br />
5.8.2.1.1 In order to get a relatively quicker idea of the quality of Concrete,<br />
optional tests on beams for modules of rupture at 72 + 2 hours or at 7<br />
days, or compressive strength tests at 7 days may be carried out in<br />
addition to 28 days compressive strength tests. For this purpose the<br />
values should be arrived at based on actual testing. In all cases, the 28<br />
days compressive strength specified in Table-11 of ISl 456-2000 shall<br />
alone be the criteria for acceptance or rejection of the concrete.<br />
5.8.2.2 Frequency of Sampling:<br />
5.8.2.2.1 Sampling Procedure:<br />
A random sampling procedure shall be adopted to ensure that each<br />
concrete batch shall have a reasonable chance of being tested that is,<br />
the sampling should be spread over the entire period of concreting and<br />
cover all mixing units.<br />
5.8.2.2.2 Frequency:<br />
The minimum frequency of sampling concrete of each grade shall be in<br />
accordance with the following:<br />
Quality of concrete in the work (M3)<br />
Samples<br />
Number of<br />
1-5 1<br />
6-15 2<br />
16-30 3<br />
31-50 4<br />
51 and above<br />
4 plus one additional<br />
sample for each additional<br />
50m 3 or part thereof<br />
Note: At least one sample shall be taken from each shift. Where<br />
concrete is produced at continuous production unit, such as ready-<br />
mixed concrete plant, frequency of sampling may be agreed upon<br />
mutually by suppliers and purchasers.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 358<br />
5.8.2.3 Test Specimen:<br />
Three test specimens shall be made from each sample for testing at 28<br />
days. Additional samples may be required for various purposes such as<br />
to determine the strength of concrete at 7 days or at the time of striking<br />
the formwork, or to determine the duration of curing, or to check the<br />
testing error. Additional samples may also be required for testing<br />
samples cured by accelerated methods as described in IS: 9103. The<br />
specimen shall be tested as described in IS 5116.<br />
5.8.2.4 Test results of sample:<br />
The test results of the sample shall be the average of the strength of<br />
three specimens. The individual variation should not be more than +<br />
15 percent of the average. If more, he test results of the sample are<br />
invalid.<br />
5.8.2.5 Determination of Standard Deviation:<br />
Where:<br />
Concrete of each grade shall be analyzed separately to determine its<br />
standard deviation.<br />
The standard deviation of concrete of a given grade shall be calculated<br />
using the following formula from the results of individual tests of<br />
concrete of that grade obtained as specified in Table.<br />
Estimated standard deviation = S =<br />
ΣΔ 2<br />
n - 1<br />
Δ = Deviation of the individual test strength from the average<br />
strength 'n' samples and<br />
n = Number of samples test results.<br />
When significant changes are made in the production of concrete<br />
batches (for example changes in the material used, mix design,<br />
equipment or technical control), the standard deviation value shall be<br />
separately calculated for Such batches of concrete.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 359<br />
5.8.2.6 Assumed Standard Deviation:<br />
Where sufficient test results for a <strong>particular</strong> grade of concrete are not<br />
available, the value of standard deviation given in Table 8 of IS: 456 of<br />
2000 may be assumed.<br />
5.8.3 Permeability Test:<br />
5.8.3.1 Concrete Cylinders:<br />
The quality of hardened concrete will be verified by the following<br />
procedure:<br />
5.8.3.2 The Engineer shall select random batches of concrete for examination<br />
without warning the Contractor and sampling will generally be done at<br />
the point of discharge form the mixer and at placing point.<br />
5.8.3.3 From the batches thus selected 2 concrete cylinders shall be made in<br />
accordance DIN 1048.<br />
5.8.3.4 All cylinders shall be made, cured, stored, transported and tested in<br />
accordance with Clause 1716.5 of MORT & H. The tests shall be<br />
carried out in a laboratory approved by the Engineer.<br />
5.8.3.5 Frequency of testing – 1 set (2 cylinders representing concrete from a<br />
different batch) for every 40m 3 of concrete.<br />
5.8.4 The permeability of hardened concrete will be verified by the following<br />
procedure:<br />
i) Prepare a cylindrical test specimen 150mm dia and 160mm<br />
high.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 360<br />
ii) After 28 days of curing, test specimen will be fitted in a machine<br />
such that the specimen can be placed in water under pressure<br />
upto 7 bars. The typical machine shall be similar to one shown<br />
in Appendix 1700/II of MORT&H 4th revision, 2001 reprint.<br />
iii) At first a pressure of one bar is applied for 48 hours, followed by<br />
3 bars for 24 hours and 7 bars for next 24 hours.<br />
iv) After the passage of the above period, the specimen is taken out<br />
and split in the middle by compression applied on two round<br />
bars on opposite sides above and below.<br />
v) The water penetration in the broken core is measured with scale<br />
and the depth of penetration assessed in mm (max permissible<br />
limit 25mm)<br />
5.9.0 ACCEPTABILITY CRITERIA<br />
5.9.1 Concrete Cubes<br />
5.9.1.1 The strength requirement of any <strong>particular</strong> grade of concrete will be<br />
considered satisfactory if the 28 day’s compressive strengths of<br />
individual sets (each set consists of 3 cubes) and of individual cubes<br />
satisfy the requirements as per IS: 456-2000, Clause No.16:<br />
Acceptance Criteria.<br />
5.9.1.2 Whenever a mix is redesigned due to a change in the quality of<br />
aggregates or cement or plasticiser or for any other reason, it shall be<br />
considered as a new mix and initially subject to the acceptability<br />
criteria.<br />
5.9.1.3 If the concrete produced at site does not satisfy the above strength<br />
requirements, the Engineer will reserve the right to require the<br />
Contractor to improve the methods of batching, the quality of the<br />
ingredients and redesign the mix with increased cement content if<br />
necessary. The Contractor shall not be entitled to claim any extra cost
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 361<br />
for the extra cement or plasticiser used for the modifications stipulated<br />
by the Engineer for fulfilling the strength requirement specified.<br />
5.9.2 Permeability Test:<br />
The concrete shall pass the permeability test if it is properly compacted<br />
and is not considered permeable when tested as per DIN 1048 and the<br />
water penetration in the broken core is less than 25mm. No extra<br />
payment shall be made for this test and cost of the same will be<br />
included in his rate for concrete work.<br />
5.10 FAILURE TO MEET SPECIFIED REQUIREMENTS :<br />
5.10.1 If from the cube test results is appears that some portion of the <strong>works</strong><br />
has not attained the required strength, the Engineer may order that<br />
portion of the structure be subjected to further testing of any kind<br />
whatsoever as desired by the Engineer, including, if so desired by him.<br />
Full load testing of the suspected as well as adjacent portions of the<br />
structure as specified in the Conditions of Contract. Such testing shall<br />
be at the Contractor’s cost. The Engineer may also reject the work and<br />
order its demolition and reconstruction at the contractor’s cost.<br />
5.10.2 If the strength of concrete in any portion of the structure is lower than<br />
the required strength, but is considered nevertheless adequate by the<br />
Engineer so that demolition is not necessary, the Contractor shall be<br />
paid a lower rate for such lower strength concrete as determined by the<br />
Engineer.<br />
5.10.3 If the concrete is not able to meet the prescribed acceptance standard<br />
the effect of such deficiency on structure shall be investigated by the<br />
contractor as directed by the Engineer. The Engineer may accept the<br />
work as sub-standard work. Any additional work required by the<br />
Engineer for such acceptance shall be carried out by the contractor at<br />
his cost. In case the concrete is not found to be acceptable after<br />
investigation, the contractor shall remove the rejected work forthwith.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 362<br />
5.11 Test for concrete and concrete making ingredients:<br />
As frequently as the Engineer may require, testing shall be carried out<br />
in the field/approved laboratory for:<br />
1) Concrete cube test.<br />
2) Permeability test for concrete as per DIN<br />
The Contractor shall provide and maintain at all times, until the <strong>works</strong><br />
are completed, equipment, Technicians, staff required for carrying out<br />
these tests. The Contractor shall grant the Engineer or his<br />
representative full access to his laboratory at all times and shall<br />
produce on demand complete records of all tests carried out on site.<br />
Before concreting commences on any section of the <strong>works</strong> contractor<br />
shall obtain approval of the Engineer or his representative as regards<br />
the formwork and reinforcement conforming with the drawings. He<br />
shall also indicate to the Engineer in writing and obtain his approval for<br />
positions of construction joints. The Engineer or his representative’s<br />
approval shall not relieve the Contractor of any of his obligations to<br />
comply with the provisions of this specification or contract.<br />
5.12 ADMIXTURES :<br />
No materials other than the essential ingredients i.e. cement,<br />
aggregates and water, shall ordinarily be used of manufacture of<br />
concrete or mortar. But the Engineer may permit the use of approved<br />
admixtures conforming to IS:9103 for importing special characteristics<br />
to the concrete, on satisfactory evidence that its use does not in any way<br />
adversely affect the properties of concrete <strong>particular</strong>ly its strength,<br />
volume changes, durability an has not deleterious effect on the<br />
reinforcement. The admixtures shall not be paid separately.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 363<br />
5.13 WATER:<br />
5.13.1 Storage:<br />
5.13.2 Tests:<br />
Water supplied shall conform to the various provisions of IS:456-2000.<br />
B<strong>road</strong>ly stated, water used for mixing and curing of aggregates shall be<br />
clean and fresh, free from oils, acids, alkalis, salts, sugar, organic or<br />
other deleterious matter whether in solution or in suspension in such<br />
amounts as may impair the strength and/or durability of concrete or<br />
steel. Water which is potable is generally considered satisfactory for<br />
concrete mixing. Sea water or water from excavation shall not be used.<br />
Water shall be so stored that it remains free from all deleterious matter<br />
as mentioned above.<br />
No water shall be used until tested for its chemical and other impurities<br />
as per IS:3025 to ascertain its suitability. Tests shall be conducted<br />
whenever the source is changed or during reasonable variation.<br />
5.14 Batching of Concrete Ingredients:<br />
For all structural concreting, only Ready Mixed Concrete (R.M.C.)<br />
manufactured at site in automatic weigh batching plant or obtained<br />
from approved R.M.C. supplying agencies will be used. The R.M.C.<br />
supplying agency will supply mix design details at least 10 days in<br />
advance before start of delivery.<br />
5.15 TRANSPORTING, PLACING, COMPACTING, FINISHING AND<br />
CURING :<br />
Transporting, placing, compacting, finishing and curing of concrete<br />
shall be in accordance with IS:456.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 364<br />
5.15.1 Transporting:<br />
For all concreting, the concrete after discharge from batching plant will<br />
be loaded in transit mixers and kept continuously agitated while mix is<br />
in transit. At destination the mix will be unloaded in to the hoppers of<br />
concrete pump.<br />
5.15.2 Placing:<br />
The concrete, when discharged from transit mixer in pump hopper shall<br />
be kept continuously agitated and pumped to destination placing point.<br />
The height of any single lift of concrete shall not exceed 1.5 m for walls<br />
and 2.0m. for columns. For columns where the height of pour is more<br />
than 2.0m., suitable arrangement in formwork should be made so that<br />
the vertical drop of concrete is restricted to less than 2.0m. Any such<br />
arrangement should be approved from the Engineer in advance before<br />
execution.<br />
The thickness of horizontal layers shall not exceed 300 mm. High<br />
velocity discharge of concrete causing segregation of mix shall be<br />
avoided. The concrete shall be placed in the forms gently and not<br />
dropped from a height exceeding 1.5 m except in columns where the<br />
maximum allowed will be 2.0m. Each batch of concrete will be placed<br />
in layer. Each layer of concrete shall be compacted fully before the<br />
succeeding layer is placed and separate batches shall be placed and<br />
fully compacted before the layer immediately below has taken initial<br />
set. The layers should be sufficiently shallow, to permit stitching of two<br />
layers together by vibration.<br />
Concreting of any portion or section of the work shall be carried out in<br />
one continuous operation and no interruption of concreting work will<br />
be allowed without approval of the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 365<br />
Plain concrete in foundations shall be placed, in direct contact, with the<br />
bottom of excavation, the concrete being deposited in such a manner,<br />
as not to get mixed with the earth. The concrete placed below the<br />
ground level shall be protected from falling earth during and after<br />
placing. Concrete placed in ground containing deleterious substances,<br />
shall be kept free from contact, with such ground and with water<br />
draining therefrom during placing and for a period of 7 days of or<br />
otherwise instructed there after. Approved means shall be taken to<br />
protect immature concrete from damage by debris, excessive loading,<br />
abrasion, vibrations, deleterious ground water, mixing with earth and<br />
other materials and other influences, that may impair strength and<br />
durability of concrete.<br />
Before starting of work contractor will get the concrete pouring<br />
programme and its sequence approved by Engineer to avoid cold<br />
joints.<br />
5.15.3 Compaction:<br />
External, Internal (needle) and surface (screed board) vibrators of<br />
approved make shall be used for compaction of concrete.<br />
a) External and internal vibrators shall be used for compaction of<br />
concrete in foundations, columns etc. for sections such as slabs,<br />
the concrete shall be compacted by external, internal and<br />
surface type vibrators, depending on the thickness of layer to be<br />
compacted. 25mm, 40mm and 60mm dia internal vibrators will<br />
be used. The concrete shall be compacted by use of appropriate<br />
diameter vibrator by holding the vibrator in position until:<br />
i) Air bubbles cease to come to surface.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 366<br />
ii) Resumption of steady frequency of vibrator after short<br />
period of dropping the frequency, when the vibrator is first<br />
inserted.<br />
iii) The tone of the vibrator becomes uniform.<br />
iv) Flattened, glistening surface, with coarse aggregates<br />
particles blended into it, appears on the surface.<br />
After the compaction is completed, the vibrator should be<br />
withdrawn slowly from concrete so that concrete can flow<br />
in to the space previously occupied by the vibrator. To<br />
avoid segregation during vibration, the vibrator shall not<br />
be dragged through the concrete nor used to spread the<br />
concrete. The vibrator shall be made to penetrate into<br />
layer of fresh concrete below if any, for a depth about<br />
150 mm. The vibrator shall be made to operate at regular<br />
pattern of spacing. The effective radii of action will<br />
overlap, approximately half a radius to ensure complete<br />
compaction.<br />
v. To secure even and dense surfaces free from aggregate<br />
pockets, vibration shall be supplemented by tamping or<br />
rodding by hand in the corners of forms and along the<br />
form surfaces while the concrete is plastic.<br />
vi. A sufficient number of spare vibrators shall be kept readily<br />
accessible to the place of deposition of concrete to assure<br />
adequate vibration in case of breakdown of those in use.<br />
25mm diameter immersion vibrators shall be used in thin<br />
sections upto 125mm, 40mm diameter immersion
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 367<br />
5.15.4 Curing :<br />
vibrators in fairly wide sections like beams, slabs, columns<br />
etc. and 60mm diameter vibrators in foundations,<br />
pilecaps or such large section members. Screed vibrators<br />
shall also be used for slab concreting.<br />
vii. Plain concrete also shall be vibrated to achieve full<br />
compaction, using needle and screed vibrators as<br />
necessary.<br />
Curing shall be started at the earliest by spreading wet jute cloth<br />
(hessian) and cover top with plastic sheet and subsequently cured with<br />
spraying water. In inaccessible area to start with, curing be started by<br />
spraying curing compound before starting membrane curing.<br />
5.16 Placing Temperatures :<br />
During extreme hot weather, the concreting shall be done as per<br />
procedures set out in IS: 7861, Parts I and II.<br />
Fine and coarse aggregates for concreting shall be kept shaded and<br />
the concrete aggregates sprinkled with water for a sufficient time before<br />
concreting, in order to ensure that the temperature of these ingredients<br />
is as low as possible prior to batching. The mixer and batching<br />
equipment shall be also shaded and if necessary painted white in order<br />
to keep their temperatures as low as possible. The placing temperature<br />
of concrete shall be as low as possible I warm weather and care shall<br />
be taken to protect freshly placed concrete from overheating by sunlight<br />
in the first few hours of its laying. The time of day selected for concrete<br />
shall also be chosen so at the minimize placing temperatures. In case<br />
of concreting in exceptionally hot weather the Engineer may in his<br />
discretion specify the use of ice either flaked and used directly in the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 368<br />
mix, or blocks, used for chilling the mixing water. In either case, the<br />
contractor shall be paid only the cost of such ice delivered on site and<br />
nothing extra for additional labour involved in weighing and mixing.<br />
5.17 Construction Joints :<br />
5.18 CRACKS :<br />
Construction joints in all concrete work shall be made as directed by<br />
the Engineer. Where vertical joints are required, these shall be<br />
shuttered and two coats of approved surface retarders shall be applied<br />
as directed by the Engineer on the surface of formwork in contact with<br />
concrete. The joint concrete shall not be allowed to take the natural<br />
slope of the concrete.<br />
In case of freshly hardened concrete, before fresh concrete is placed<br />
against a vertical joint, the old concrete shall be wire brushed and<br />
cleaned by water jet and surface dried with jet of air and cleaned. In<br />
case of old hardened concrete the surface shall be chipped and<br />
cleaned. When horizontal joint is formed the top layer of previously laid<br />
concrete will cleaned as described earlier depending on whether the<br />
concrete is fresh or fully hardened. Before fresh layer of concrete is<br />
placed, the surface shall be wetted by waterjet and dried by air jet a<br />
joint made as per MORT&H <strong>specifications</strong>.<br />
5.18.1 If cracks develop in concrete construction, which in the opinion of the<br />
Engineer may be detrimental to the strength of the construction, the<br />
contractor at his own expense shall test the slab or other construction as<br />
specified in Special Conditions. If under such test loads the cracks<br />
develop further, the Contractor shall dismantle the construction, carry<br />
away the debris, replace the construction and carry out all<br />
consequential work thereto.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 369<br />
5.18.2 If any cracks develop in the concrete construction, which in the opinion<br />
of the Engineer, are not detrimental to the strength of the construction,<br />
the contractor at his own expense shall grout the cracks with polymer<br />
cement grout of approved quality at his own expense and risk and shall<br />
make good to the satisfaction of the Engineer the surface finish which<br />
in the opinion of the Engineer has suffered damage either in<br />
appearance or stability owing to such cracks. The Engineer’s decision<br />
as to the extent of the liability of the Contractor in the above matter<br />
shall be final and binding.<br />
5.19 DEFECTIVE CONCRETE :<br />
Should any concrete be found honeycombed or in any way defective,<br />
such concrete shall on the instruction of the Engineer be cut out by the<br />
Contractor and made good at his own expenses.<br />
5.20 Exposed Faces, Holes and Fixtures :<br />
On no account shall concrete surfaces be patched or covered up or<br />
damaged concrete rectified or replaced until the Engineer or his<br />
representative has inspected the <strong>works</strong> and issued written instructions<br />
for rectification. Failure to observe the procedure will render that<br />
portion of the <strong>works</strong> liable to rejection; in which case it will be treated<br />
as rejection, which has failed to meet specified strength requirements<br />
and dealt with according to relevant Clause 10.<br />
Holes for foundation or other bolts or for any other purposes shall be<br />
moulded, and steel angles, holdfasts or other fixtures shall be<br />
embedded, according to the drawing or as instructed by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 370<br />
5.21 OTHER APPLICABLE CODES OF PRACTICE FOR IN-SITU REINFORCED<br />
CONSTRUCTION :<br />
All other requirements not covered by the above clause shall be<br />
governed by relevant clauses of IS 456, IS 3370, IS 2571 and other<br />
relevant standards as may be applicable.<br />
5.22 PRECAST CONCRETE :<br />
The provision in this section apply to all precast concrete executed<br />
within site and shall be considered supplementary to general provisions<br />
for reinforced concrete <strong>works</strong>.<br />
5.22.1 Handling and Storage :<br />
The precast units shall be stored as directed by the Engineer. The area<br />
intended for the storage of precast units should be surfaced in such a<br />
way that no unequal settlement can occur.<br />
To prevent deformation of slender units, they should be provided with<br />
supports at fairly close intervals and should also be safeguard against<br />
tilting. Lifting and handling positions should conform to the Engineer’s<br />
directions and drawings. In addition, location and orientation marks<br />
should be put on the members as and where necessary. During<br />
erection the precast units should be protected against damage caused<br />
by local crushing, chafing, effects of lifting and transport equipment.<br />
5.22.2 Temporary Supports and Connections :<br />
Temporary supports provided during erection should take into account<br />
all construction loads likely to be encountered during the completion of<br />
joints between any combination of precast and in-situ concrete<br />
structural elements.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 371<br />
The supports should be arranged in a manner that will permit the<br />
proper finishing and curing of any in-situ concreting and grouting<br />
associated with the precast member being supported when the gaps of<br />
joints have to be cleaned, the faces of the joints should be wetted. The<br />
mixing, placing and compacting of cement and mortar should be done<br />
with special care. Where mortar is specified, or a dry consistency, it<br />
should be in the proportion of 1 part of cement to 1 ½ parts of sand<br />
and should be placed in stages and packed hard from both sides of the<br />
joint.<br />
5.22.3 Tolerances :<br />
The following tolerances apply to finished precast products at the time<br />
of placement in the structure. The forms must be constructed to give a<br />
casting well within these limits.<br />
1. Overall dimensions of members should not vary more than + 6<br />
mm per 3 m length with a maximum variation of + 20 mm.<br />
2. Cross-sectional dimensions should not vary more than the<br />
following:<br />
+ 3 mm for sections less than 150 mm thick.<br />
+ 4 mm for sections over 150 mm and less than 450 mm.<br />
+ 6 mm for sections over 450 mm to 1000 mm.<br />
+ 10 mm for sections over 1000 mm.<br />
3. Deviation from straight line in long sections should not be more<br />
than + 6 mm up to 3 m, + 10 mm for 3 m to 6 m, + 12 mm<br />
for 6 m to 12 m.<br />
5.23 Mode of Measurement (For Precast Items) :<br />
Concrete and reinforcement shall be paid separately unless otherwise<br />
specified.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 372<br />
The volume of concrete measured in cubic meter shall include that<br />
occupied by :<br />
1) Reinforcement and other metal sections.<br />
2) Cast in components each less than 0.01 m3 in volume.<br />
3) Rebates, fillets or internal splays each less than 0.005 m2 in<br />
cross sectional areas.<br />
4) Pockets and holes not exceeding 0.01 m3 in volume.<br />
5) Rates for precast concrete shall include demoulding, handling,<br />
storing, transporting and erecting at site, including all clamping,<br />
bolting, bracing that may be required during erection, including<br />
erection equipment.<br />
5.24 READY-MIXED CONCRETE AND PUMPING CONCRETE :<br />
The provision in this section apply to all Ready Mix Concrete and shall<br />
be considered supplementary to general provisions for reinforced<br />
concrete <strong>works</strong>. The test shall be carried out at RMC manufacturer’s<br />
laboratory on all concrete ingredients as per the <strong>specifications</strong>.<br />
However, if directed by Engineer, test will be carried out on random<br />
sample at <strong>CIDCO</strong> approved laboratory by RMC manufacturer<br />
/contractor.<br />
5.24.1 Ready-mixed concrete may be manufactured in a central automatic<br />
weight Batching plant and transported to the job in agitating transit<br />
mixer.<br />
The maximum size of coarse aggregate shall be limited to one-third of<br />
the smallest inside diameter of the hose or pipes used for pumping.<br />
Provision shall be made for elimination of over-sized particles by<br />
screening or by careful selection of aggregates. To obtain proper<br />
gradation it may be necessary to combine and blend certain fractional<br />
sizes to aggregates. Uniformity of gradation throughout the entire job<br />
shall be maintained.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 373<br />
The quantity of coarse aggregate shall be such that the concrete can be<br />
pumped, compacted and finished without difficulty.<br />
5.24.2 Fine Aggregates :<br />
The gradation of fine aggregate shall be such that 15 to 30 percent<br />
should pass the 0.30 mm screen and 5 to 10 percent should pass 0.15<br />
mm screen so as to obtain a pumpable concrete. Sands that are<br />
deficient in either of these two sizes should be blended with selected<br />
finer sands to produce these desired percentages. With this gradation,<br />
sands having a fineness modulus between 2.4 and 2.8 are generally<br />
satisfactory. However, for uniformity, the fineness modulus of the sand<br />
should not vary more than 0.2 from the average value used in<br />
proportioning.<br />
5.24.3 Water, Admixtures and Slump :<br />
The amount of water required for proper concrete consistency shall<br />
take into account the rate of mixing, length of haul, time of unloading<br />
and ambient temperature conditions.<br />
Additions of water to compensate for slump loss should not be resorted<br />
to nor should the design maximum water-cement ratio be exceeded.<br />
Additional dose be retarder/plasticizer/superplasticizer shall be used<br />
with prior approval of engineer to compensate the loss of setting time<br />
and slump at contractor’s cost. Retempering water shall not be allowed<br />
to be added to mixed batches to obtain desired slump.<br />
5.24.4 Transportation :<br />
The method of transportation used should efficiently deliver the<br />
concrete to the point of placement without significantly altering its<br />
desired properties with regard to water-cement ratio, slump and<br />
homogeneity.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 374<br />
The revolving-drum truck bodies of approved make shall be used for<br />
transporting the concrete. The number of revolutions at mixing speed,<br />
during transportation, and prior to discharge shall be specified and<br />
agreed upon. Reliable counters shall be used on revolving-drum truck<br />
units. Standard mixer uniformity tests, conformity to ASTM Standards C<br />
94-69 “Standard Specifications for Ready Mix Concrete”, shall be<br />
carried out if desired by engineer to determine whether mixing is being<br />
accomplished satisfactorily.<br />
5.24.5 Pumping of Concrete :<br />
Only approved pumping equipment, in good working condition, shall<br />
be used for pumping of concrete. Concrete shall be pumped through a<br />
combination of rigid pipe and heavy-duty flexible hose of approved size<br />
and make. The couplings used to connect both rigid and flexible pipe<br />
sections shall be adequate in strength to withstand handling loads<br />
during erection of pipe system, misalignment, and poor support along<br />
the lines. They should be nominally rated for at least 3.5 Mpa pressure<br />
and greater fore rising runs over 30 m. Couplings should be designed<br />
to allow replacement of any section without moving other pipe sections,<br />
and should provide full cross section with no construction or crevices to<br />
disrupt the smooth flow of concrete.<br />
All necessary accessories such as curved sections of rigid pipe, swivel<br />
joints and rotary distributors, pin and gate valves to prevent backflow in<br />
the pipe line, switch valves to direct the flow into another pipe line,<br />
connection devices to fill forms from the bottom up, extra strong<br />
couplings for vertical runs, transitions for connecting different sizes of<br />
pipe, air vents for downhill pumping, clean-out equipment etc. shall be<br />
provided as and where required. Suitable power controlled booms or<br />
specialized crane shall be used for supporting the pipe line.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 375<br />
5.24.6 Field Control :<br />
5.25 Planning :<br />
Sampling at both truck discharge and point of final placement shall be<br />
employed to determine if any changes in the slump and other<br />
significant mix characteristics occur. However, for determining strength<br />
of concrete, cubes shall be taken form the placement end of line. The<br />
RMC supplied should nominate a technically qualified representative at<br />
site for sampling, testing and placing of concrete.<br />
Proper planning of concrete supply, pump locations, line layout,<br />
placing sequence and the entire pumping operation shall be made and<br />
got approved. The concrete production, transportation and placing<br />
shall be planed in such a manner that duration between addition of<br />
water during mixing and placing of concrete in desired location is well<br />
within time limits prescribed by the RMC manufacturer, however this is<br />
subjected to fulfillment of slump and other properties of concrete as<br />
specified in tender. On failure to adherer to the line time schedule by<br />
the supplier the Engineer may reject the concrete.<br />
The pump should be as near the placing area as practicable, and the<br />
entire surrounding area shall have adequate bearing strength to<br />
support concrete delivery pipes. Lines from pump to the placing area<br />
should be laid out with a minimum of bends. For large placing areas<br />
alternate lines should be installed for rapid connection when required.<br />
Standby power and pumping equipment should be provided to replace<br />
initial equipment, should breakdown occur.<br />
The placing rate should be estimated so that concrete can be ordered<br />
at an appropriate delivery rate.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 376<br />
5.26 Finishes:<br />
As a final check, the pump should be started and operated without<br />
concrete to be certain that all moving parts are operating properly. A<br />
grout mortar should be pumped into the lines to provide lubrication for<br />
the concrete, but this mortar shall not be used in the placement.<br />
When the form is nearly full and there is enough concrete in the line to<br />
complete the placement, the pump shall be stopped and a go-devil<br />
inserted and shall be forced through the line by the water under<br />
pressure to clean it out. The go-devil should be stopped at a safe<br />
distance from the end of the line so that the water in the line will not<br />
spill into the placement area. At the end of placing operation, the line<br />
shall be cleaned in the reverse direction.<br />
SUBMISSION OF DOCUMENTS FROM RMC MANUFACTURER<br />
If Contractor intend to install Ready Mix Concrete plant at side then<br />
following document should be submitted for approval. The RMC Plant<br />
should confirm to IS-2722.<br />
1. Checklist for ready mix concrete supply of concrete (RMC) in a<br />
prescribed format given in the tender.<br />
2. Design Mix<br />
3. Manufacturer’s Test Certificate for cement and plasticizer<br />
4. Lab test certificates for all ingredient of concrete.<br />
5. Delivery docket sheet mentioning the grade of concrete, quality<br />
of ingredient used, slump, transit mixer vehicle no. placement,<br />
location, time of concrete produce and placing etc.<br />
Unless otherwise instructed the face of exposed concrete placed against<br />
formwork shall be rubbed down immediately on removal of the<br />
formwork to removal irregularities. The face of concrete for which
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 377<br />
formwork is not provided other that slabs shall be smoothed with a<br />
float to give a finish equal to that of the rubbed down face, where<br />
formwork is provided. The top face of a slab which is not intended to<br />
be covered with other materials shall be leveled and floated to a<br />
smooth finish at the levels or falls shown on the drawings or as<br />
directed. The floating shall be done so as not to bring as excess of<br />
mortar to the surface of the concrete. The top face of a slab intended<br />
to be surfaced with other materials shall be left with a spaded finish.<br />
Faces of concrete intended to be plastered shall be roughened by<br />
approved means to form a key.<br />
5.27 Concrete for flooring on grade:<br />
Concrete for flooring on grade shall be over well packed stone<br />
metalling or on earth as specified with or without reinforcement, placed<br />
in alternate bas not exceeding more than 6m x 6m or as specified<br />
including hacking the joints or adjacent bays. The water cement ratio<br />
shall not exceed 0.4. The stiff mix shall be thoroughly vibrated and<br />
finished to receive the floor finish.<br />
5.28 Other applicable codes of practice for in-situ reinforced construction<br />
All other requirements not covered by the above clauses shall be<br />
governed by relevant clause of Specifications for Road and Bridge Works<br />
of MORT&H latest version IS 456, IS 3370, IS 2571 and other relevant<br />
standards as may be applicable.<br />
5.29 Grouting of base plates & bolt holes:<br />
Mixing :<br />
Dry grout should be mixed in a mechanical mixer, the conventional<br />
200/400 litre capacity concrete mixer can be used to mix four bags of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 378<br />
dry grout; alternatively, paddle type mortar mixers can be used. The<br />
quantity of grout to be mixed at one time should not exceed that amount<br />
which can be placed in approximately 10 to 15 minutes.<br />
Batching :<br />
Batching of grout by fraction of a bag is not allowed. The quantity of<br />
mixing water should be the minimum commensurate with workability,<br />
compaction, and filling of the grout in all corners and crevices. Mixing<br />
should be done for a minimum of three minutes to obtain a fluid grout of<br />
uniform consistency.<br />
Shrinkage Compensated Grout:<br />
Shrinkage compensated grout of Associated Cement Companies Limited<br />
or any other approved manufacturer should be used. The batching shall<br />
be as per the manufacturer's <strong>specifications</strong>, other procedures being as<br />
above.<br />
5.30 CONCRETING OF SUBSTRUCTURE AND SUPERSTRUCTURE<br />
5.30.1 Construction and concreting of substructure and superstructure shall<br />
conform to the requirements laid down in “Specifications for Road and<br />
Bridge Works – published by MORT&H and IS-456-2000 and the<br />
requirements specified hereunder. Relative applicability of codes shall<br />
be as mentioned in para-3 of Part-I Special Specifications.<br />
5.30.2 Grade of Controlled Concrete<br />
The grades of concrete, maximum size of aggregates, Minimum and<br />
maximum cement content per m3 of concrete, max water cement ratio<br />
and slump shall be as follows.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 379<br />
Grade of Cement Concrete<br />
Nominal<br />
size of<br />
aggregate in<br />
mm.<br />
W/C<br />
Max<br />
Cement<br />
Content<br />
kg/m 2<br />
M-20 20 0.45 310<br />
PCC/RCC/PSC/Structural Concrete<br />
M-20 20 0.45 310<br />
M-30/M-35 20 0.40 400<br />
M-30/M-35 (Tremmie Concrete) 20 0.40 400<br />
NOTE : For controlled concrete <strong>works</strong>, if the contractor is unable to<br />
obtain the required concrete strength, with the above given<br />
maximum dosage of cement, he can with the specific approval<br />
of Engineer increase the cement dosage.<br />
In Such cases no extra payment will be made for the use of extra<br />
cement. Use of approved plasticiser super plasticiser for increase in<br />
workability only at contractor's cost is mandatory. Lignosulphonate<br />
based Admixtures/plasticizers will not be permitted.<br />
5.30.2.1 Requirements of Consistency<br />
The mix shall have the consistency which will allow proper placement<br />
and consolidation in the required position. Every attempt shall be<br />
made to obtain uniform consistency.<br />
The optimum consistency for various types of structures shall be as<br />
indicated in Table, or as directed by the Engineer. The slump of<br />
concrete shall be checked as per IS:516.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 380<br />
SR.<br />
NO.<br />
5.30.2.2 Additional Requirements<br />
As per Clause 1704.4 of MORT&H Standard Specifications, concrete<br />
shall meet with any other requirements as specified on the drawing or<br />
as directed by the Engineer. Additional requirements shall also consist<br />
of the following overall limits of deleterious substances in concrete:<br />
For substructure:<br />
a) Variation in cross-sectional<br />
dimensions<br />
b) Misplacement from specified position<br />
in plan<br />
TYPE<br />
1. (a) Structure with exposed inclined surface<br />
requiring low slump concrete to allow proper<br />
compaction<br />
: +10mm, -5mm<br />
: 10mm<br />
c) Variation of levels at the top : +10mm<br />
SLUMP<br />
(mm)<br />
(b) Plain cement concrete 25<br />
2. RCC structures with widely spaced<br />
reinforcements e.g. solid columns, piers,<br />
abutments, footings, well staining<br />
3. RCC structures with fair degree of congestion of<br />
reinforcement; e.g. pier and abutment caps, box<br />
culverts well curb, well cap, walls with thickness<br />
greater than 300 mm.<br />
4. RCC and PSC structures with highly congested<br />
reinforcement e.g. deck slab girders, box girders,<br />
walls with thickness less than 300 mm.<br />
5. Underwater concreting through tremie e.g.<br />
bottom plug, cast-in-situ piling<br />
25<br />
40 -50<br />
50-75<br />
75-125<br />
100-200
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 381<br />
d) Variations of reduced levels of<br />
bearing areas<br />
e) Variations from plumb over full<br />
height<br />
f) Surface irregularities measured with<br />
3m straight edge<br />
: +5mm<br />
: +10mm<br />
All surfaces except bearing areas : 5mm<br />
Bearing areas : 3mm<br />
For substructure:<br />
Variation in thickness of top and<br />
bottom slab for box girders, top and<br />
bottom flange for T-girders or slabs<br />
: -5mm, +10mm<br />
b) Variations in web thickness : -5mm, +10mm<br />
c) Variations in overall depth or width : +5mm<br />
d) Variations in length overall and<br />
length between bearings<br />
e) Permissible surface irregularities<br />
when measured with a 3m straight<br />
edge or template<br />
Setting up of Field Laboratory by Contractor :<br />
: Shall not exceed<br />
+ 10mm or<br />
+0.1 percent of<br />
the span length,<br />
whichever is<br />
lesser<br />
: 5mm<br />
The Contractor shall set up a field laboratory of his own at work site<br />
which should be open for use and inspection by Engineer at any time.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 382<br />
The laboratory shall be equipped with necessary equipments to carry<br />
out the various tests such as sieve analysis, compression tests on cubes,<br />
slump test, workability test etc. On aggregate, cement, water and<br />
concrete required for ensuring the required quality and standard<br />
conforming to codal provision and special <strong>specifications</strong>.<br />
All the pressure gauges, machines, equipments and other measuring<br />
and testing equipments and other measuring and testing equipments of<br />
the laboratory shall be got checked/calibrated regularly as directed by<br />
the Engineer and the necessary certificates furnished to the Engineer by<br />
the Contractor.<br />
The Contractor shall render all reasonable assistance and help in<br />
making the checks and tests. All the equipments, machineries etc. shall<br />
be kept in good working conditions.<br />
The cost of setting up the laboratory, equipping the same, maintaining,<br />
conducting all tests on materials and cubes shall be borne by the<br />
Contractor.<br />
5.30.3 KEEPING RECORD<br />
Contractor shall maintain records in approved format as specified by<br />
the Engineer at site of work containing the following<br />
details/information.<br />
a) Daily receipt of cement and use of cement in various items;<br />
b) Time of starting of concrete work and closure;
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 383<br />
c) Number of batches through mixer, source of water, water cement<br />
ratio;<br />
d) Testing of cubes and results;<br />
e) Dates of erection of work passing of formwork and striking of<br />
formwork.<br />
5.30.4 Mode of Measurement<br />
All concrete shall be measured net to the nearest centimeter subject to<br />
the following:<br />
a) Thickness of slabs, partitions etc. and sectional dimensions in<br />
case of posts, columns, beams and the raft shall be measured to<br />
the nearest half centimeter. Measurement shall be as per<br />
drawing.<br />
b) No deductions or additions shall be made on any account for<br />
following.<br />
i) For ends of dissimilar materials (for e.g. joints, beams,<br />
posts, girders, rafter, purlins, steps, corbels, upto 500 sq.,<br />
each in section)<br />
ii) Openings upto 0.1 sq.metre each:<br />
iii) Joints of any kind (plain, rebated, locking tongue and<br />
groove etc.)<br />
iv) Small linear labours including, mouldings, chamfering,<br />
splays, rounded or curved angles, beds, grooves and<br />
rebates upto 10cm. width or 15cm in girth.<br />
v) Wall plates, the volume occupied by wall plates and the<br />
like upto 10 cm deep.<br />
vi) Incidental labor (e.g. stops, metres, returns, rounded<br />
ends, junctions, dishings) in connection with liner or super<br />
labour)
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 384<br />
c) Volume occupied by reinforcement, water pipes, conduits upto<br />
25 sq.cm. shall not be deducted.<br />
d) Pilasters, buttresses, plinth, courses and similar projects beyond<br />
the general surfaces shall be measured and included with the<br />
wall.<br />
e) Length of roof beams shall be measured from face to face of<br />
columns and shall include haunches if any between the columns<br />
and beams. The depth of beams shall be measured form the<br />
bottom of the slab to the bottom of the slab to the bottom of the<br />
beam taking the floor or roof slab as running continuously<br />
over/below the beam.<br />
f) Columns shall be measured from the top of the column base to<br />
the top of the first floor slab and subsequently from top of floor<br />
slab to top of subsequent floor or roof slab above as the case<br />
may be. Measurement of chajjas shall be exclusive of bearing,<br />
where the chajja is combined with lintel, slab etc. the common<br />
portion shall be measured under respective item with which it is<br />
combined.<br />
5.30.5 The rates generally include for<br />
a) All removing by head or wheeling, hoisting, lowering,<br />
transporting required in order to convey concrete of any<br />
description, from the place of mixing to the actual place of<br />
incorporation in work.<br />
b) Keeping concrete well wetted for 28 days or as directed by<br />
Engineer, after depositing and necessary protection.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 385<br />
c) Small linear and incidental labour.<br />
d) The working up or hacking of concrete for the purpose of<br />
providing key to receive further plaster, finishing top surfaces to<br />
falls, roughening to suit other title finishes; finishing smooth and<br />
even with cement mortar (1:3) surfaces with neeru finish which<br />
are not to receive further finishes.<br />
e) All necessary centering and form work for plain and reinforced<br />
concrete.<br />
f) Work whether straight, or curved;<br />
g) Machine mixing of concrete of all RCC work especially controlled<br />
concrete, with weight batching facilities and use of vibrator for<br />
all reinforced and plain concrete work.<br />
h) Tests of materials/ingredients of controlled concrete work as per<br />
IS 456 (latest revision)<br />
i) Cube test for all concrete plain and reinforced at the discretion<br />
of Engineer, for controlled concrete, cube tests as prescribed in<br />
<strong>particular</strong> <strong>specifications</strong> for controlled concrete.<br />
j) Design of mix for controlled concrete work.<br />
k) Concreting the irregular pockets in foundation.<br />
l) Finishing of concrete ceiling and sides underside of beams, RCC<br />
pardis lintels, not in conjunctions with walls with cement plaster<br />
(1:3) not less than 6mm thick.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 386<br />
m) Columns and footings below G.I. shall be painted with two coats<br />
of bitumen.<br />
n) The rate shall include use of plasticizer, curing compound,<br />
Hackaid plast, chemical adhesives or bonding agents etc.<br />
wherever necessary as per directive of Engineer.<br />
o) The rate for concrete items shall be for lifting concrete from<br />
ground level only. The contractor shall keep this point in view<br />
while quoting the rates.<br />
p) Whenever concrete has been specified by strength as per the<br />
<strong>particular</strong> specification the cement content shall not be less than<br />
the specified.<br />
q) In all RCC work rates shall be exclusive of reinforcement (unless<br />
otherwise specified) which shall be paid for separately.<br />
r) The rates quoted for beams shall include for plinth beams,<br />
cantilevers, inverted cantilevers, pergola rib and sloping beams,<br />
gutter beams, etc.<br />
s) When columns and beams with different mixer, are specified, the<br />
rate shall include the extra cost involved to fill the columns with<br />
the specified mix at the junction of columns and beams.<br />
t) The rates quoted for columns shall be for columns of all shapes<br />
and sizes.<br />
u) Holes in RCC slabs, parapets, steps, walls etc., for rain water<br />
pipes, railing, plumbing pipes, spouts etc., shall be left at the<br />
time of casting concrete. Nothing extra shall be paid on this<br />
account. These holes will be made good after fixing the<br />
pipes/railing etc. for which nothing extra will be paid.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 387<br />
v) For exposed cement concrete (plain/reinforced) surfaces, only<br />
surface which are finally required to be maintained exposed as<br />
per Architectural drawings shall be measured and paid for.<br />
However, if one side of a concrete member is partly exposed and<br />
partly unexposed then the whole side will be treated as exposed.<br />
Rate quoted for this item shall be deemed to account for extra<br />
care required for making better shuttering for other unexposed<br />
concrete surfaces contiguous to surfaces required to be kept<br />
exposed.<br />
w) Groves shall be made as per drawing and design or as per<br />
Architect’s instructions in RCC member without any extra<br />
payment. No deduction will be made on concrete quantities for<br />
making such grooves. No extra payment shall also be made.<br />
x) Nothing extra shall be paid on any account for rounding off<br />
corners and ends of concrete members or for making throating<br />
or chamfering or edges where required unless otherwise<br />
specifically included as in item for RCC and shuttering work in<br />
the schedule.<br />
y) Starter column of 100mm in height shall be cast with 12mm<br />
(Maximum size) aggregate and 20% extra cement. No extra<br />
payment for casting of starter column will be made.<br />
z) The rate for PCC/RCC concrete work should also include cost of<br />
procurement and use of plasticizers as approved by Engineer,<br />
for achieving desired workability with w/c ratio and minimum<br />
cement content, slump etc., parameters specified in tender<br />
<strong>specifications</strong> of relevant items of <strong>works</strong> and taking into account<br />
of retardation of setting time if needed to avoid cold joints in<br />
superstructure elements.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 388<br />
6.0 FORMWORK<br />
6.1 DEFINITION:<br />
6.2 MATERIALS:<br />
The term “Formwork” or “Shuttering” shall include all forms, moulds,<br />
sheeting, shuttering planks, waters, poles, posts, stores, struts and<br />
strutting, ties, uprights, wallings, steel rods, bolts, wedges and all other<br />
temporary supports to the concrete during the process of setting.<br />
6.2.1 All materials required for shuttering/formwork should preferably be<br />
steel only. All facing formwork to come in contact with concrete in<br />
different elements of the structure shall be of such materials and size as<br />
specified on drawings or as instructed by the Engineer.<br />
6.2.2 Steel facing formwork to come in contact with concrete for “Exposed<br />
Concrete Surface” shall consist of lab-jointed or tongue and grooved<br />
planks as directed by the Engineer and no joints shall permit leakage of<br />
mortar at all form cast-in-situ concrete.<br />
6.2.3 The materials for other backing and supporting formwork and their<br />
6.3 DESIGN:<br />
sizes shall be selected by the contractor and shall be subject to the<br />
approval of the Engineer.<br />
The formwork shall be designed and constructed so that the concrete<br />
can be properly placed and thoroughly compacted to obtain the<br />
required shape, position and level subject to specified tolerances. The<br />
contractor shall get approved the design, including the deflection check<br />
calculation, and drawings of formwork from the Engineer. The design<br />
of the formwork shall conform to ACI 347 & MORT&H-2001:<br />
Formwork for concrete or equivalent IS Codes. The deflection of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 389<br />
sheathing in direct contact with concrete and other formwork elements<br />
like wales, struts etc. shall not exceed 3mm under operating conditions,<br />
i.e. placing & vibrating concrete. The Contractor shall then prepare the<br />
actual size mock-up of the formwork for all typical structural elements,<br />
such a slabs and coping beams, footing, intersecting beams, beam and<br />
column junction etc., as a model to be preserved at site for the artisans<br />
to follow during the execution of <strong>works</strong>. This mock-up shall represent<br />
the exact procedure the contractor intends to follows, especially at and<br />
around the jointing of different structural members. The Contractor<br />
shall obtain approval of this mock-up formwork from the Engineer<br />
before procuring the materials for the rest of the formwork. It is the<br />
responsibility of the Contractor to obtain the results required by the<br />
Engineer, whether or not some of the work is sub-contracted. Approval<br />
of the proposed formwork by the Engineer will not diminish the<br />
Contractors responsibility for the satisfactory performance of the<br />
formwork, nor for the safety and co-ordination of all operations.<br />
6.4 FORMWORK FOR CONCRETE SURFACES :<br />
Formwork, unless indicated otherwise on drawings, or specifically<br />
approved by the Engineer in writing, shall generally be made with<br />
materials not less than the thickness mentioned below for different<br />
elements of the structure.<br />
6.4.1 Plain slab soffits, and sides of beams, girders, joists ribs and sides of<br />
walls, fins, parapets, pardis, sub-breakers etc. shall be made with:<br />
a) Steel plates not less than 5 mm thick of specified sizes stiffened<br />
with a suitable structural frame work, fabricated true to plane<br />
with a tolerance of +/- 2 mm within the plate.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 390<br />
6.4.2 Bottoms of beams, girders and ribs, and sides of columns shall be<br />
made with: a) Steel plates not less than 5 mm thick of specified sizes<br />
stiffened with a suitable structural fame, fabricated true to planes with a<br />
tolerance of +/- 2mm within the plate.<br />
6.5 ERECTION OF FORMWORK :<br />
The following shall apply to all formwork:<br />
6.5.1 To avoid delay and unnecessary rejection, the Contractor shall obtain<br />
the approval of the Engineer for the design of forms and the type of<br />
materials used before fabricating the forms. (Ref. ACI 347 Formwork<br />
for concrete of equivalent I.S. Code).<br />
6.5.2 All shutter planks and plates shall be adequately backed to the<br />
satisfaction of the Engineer by a sufficient number and size of walers or<br />
formwork to ensure rigidity during concreting. All shutters shall be<br />
adequately strutted, braced and propped to the satisfaction of the<br />
Engineer to prevent deflection under deadweight of concrete and<br />
superimposed live load of workmen, materials and plant, and to<br />
withstand vibration.<br />
6.6 Vertical props shall be supported on wedges or other measures shall be<br />
taken where the props can be gently lowered vertically during removal<br />
of the formwork. Props for an upper storey shall be placed directly<br />
over those in the storey immediately below, and the lower props shall<br />
bear on a sufficiently strong area.<br />
1. Care shall be taken that all formwork is set plumb and true to<br />
line and level or camber or batter where required and as<br />
specified by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 391<br />
2. Provisions shall be made for adjustment of supporting struts<br />
where necessary. When reinforcement passes through the<br />
formwork care should be taken to ensure close fitting joints<br />
against the steel bars so as to avoid loss of fines during the<br />
compaction of concrete.<br />
3. If the formwork is held together by bolts or wires, these shall be<br />
so fixed that no iron will be exposed on surfaces against which<br />
concrete is to be laid. In any case wires shall not be used with<br />
exposed concrete formwork. The Engineer may at his discretion<br />
allow the Contractor to use tie-bolts running through the<br />
concrete and the Contractor shall decide the location and size of<br />
such tie-bolts in consultation with Engineer. Holes left in the<br />
concrete by these tie-bolts shall be filled as specified by the<br />
Engineer at no extra cost.<br />
4. Provision shall be made in the shuttering for beams, columns,<br />
and walls for a port hole of convenient size so that al extraneous<br />
materials that may be collected could be removed just prior to<br />
concreting.<br />
5. Formwork shall be so arranged as to permit removal of forms<br />
without jarring the Concrete. Wedges, clamps and bolts shall be<br />
used wherever practicable instead of nails.<br />
The formwork for beams and slabs shall be so erected so that<br />
forms on the sides of the beams and the soffit of slabs can be<br />
removed without disturbing the beam bottoms and/or props<br />
under beams.<br />
6. Surfaces of forms in contract with concrete shall be oiled with a<br />
mould oil of approved quality. If required by the Engineer the<br />
contractor shall execute different parts of the work with different<br />
mould oils to enable the Engineer to select the most suitable oil.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 392<br />
The use of oil which results in blemishes on the surface of the<br />
concrete shall not be allowed. Oil shall be applied before<br />
reinforcement has been placed and care shall be taken that no<br />
oil comes in contract with the reinforcement while it is being<br />
placed in position. The formwork shall be kept thoroughly wet<br />
during concreting and for all the whole time that it is left in<br />
place.<br />
7. Immediately before concreting is commenced, the formwork<br />
shall be carefully examined to ensure the following:<br />
a. Removal of all dirt, shavings, sawdust and other refuse by<br />
brushing and washing<br />
b. The tightness of joints between panels of sheathing and<br />
between these and any hardened core. To prevent<br />
leakage of concrete slurry a thin layer of sponge shall be<br />
placed between all such joints and then tightened.<br />
c. The correct location of tie bars, bracing and spacers, and<br />
especially connections of bracing.<br />
d. That all wedges are secured and firm in position.<br />
e. That provision is made for human traffic on formwork not<br />
to bear directly on reinforcing steel.<br />
8. The Contractor shall obtain the Engineer’s approval for<br />
dimensional accuracy of the work and for the general<br />
arrangement of propping and bracing. (IS:3696 – Safety Code<br />
of Scaffoldings and Ladders, IS : 4014 Steel Tubular Scaffolding<br />
I & II). It is imperative that for scaffolding heights of 3.6 m and<br />
above only steel scaffolding be used with adequate bracings in<br />
horizontal and vertical planes, Bracings with bamboos will not<br />
be permitted.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 393<br />
The contractor shall be entirely responsible for the adequacy of<br />
propping, and for keeping the wedges and other locking<br />
arrangements undisturbed through the decentring period.<br />
It has to be noted that only steel props should be used.<br />
(IS: 8989 Safety code for erection of concrete framed structures)<br />
9. Formwork shall be continuously watched during the process of<br />
concreting. If during concreting any weakness develops and<br />
formwork shows any distress the work shall be stopped and<br />
immediately and remedial action shall be taken.<br />
6.7 EXPOSED CONCRETE WORK<br />
6.8 CAMBER :<br />
Exposed concrete surfaces shall be smooth and even originally as<br />
stripped without any finishing or rendering and the formwork-materials<br />
and workmanship, shall ensure this. Where directed by the Engineer,<br />
the surface shall be rubbed with carborundum stone immediately on<br />
striking the forms. The Contractor shall exercise special care and<br />
supervision of formwork and concreting to ensure that the cast<br />
members are made true to their sizes, shapes and positions and to<br />
produce the surface patterns desired. No honeycombing shall be<br />
allowed. Honeycombed parts of the concrete shall be removed by the<br />
Contractor as directed by the Engineer and fresh concrete placed<br />
without extra cost, as instructed by Engineer. All materials, sizes and<br />
layouts of formwork including the locations for their joints shall have<br />
prior approval of the Engineer or the Architect.<br />
Forms and falsework shall be generally cambered as indicated in the<br />
drawings or as instructed by the Engineer. However, for beam up to<br />
5m span and slabs upto 4m span camber is not normally required to<br />
be provided.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 394<br />
6.9 TOLERANCES :<br />
In accordance with IS:456 2000 and MORT&H section 1500.<br />
6.10 AGE OF CONCRETE FOR REMOVAL OF FORMWORK :<br />
The Engineer may vary the periods specified in IS:456-2000 if he<br />
considers it necessary. Immediately after the forms are removed, they<br />
shall be cleaned with a jet of water and a soft brush.<br />
6.11 STRIPPING OF FORMWORK:<br />
Formwork shall be removed carefully without jarring the concrete, and<br />
curing of the concrete shall be commenced immediately. Concrete<br />
surfaces to be exposed shall, where required by the Engineer, be<br />
rubbed down with carborundum stone to obtain a smooth and even<br />
finish. Where the concrete requires plastering or other finish later the<br />
concrete surface shall be immediately hacked lightly all over as directed<br />
by the Engineer. No extra charge will be allowed to the Contractor for<br />
such work on concrete surfaces after removal of forms.<br />
6.12 REUSE OF FORMS:<br />
The Contractor shall not be permitted reuse of timber facing formwork<br />
brought new on the <strong>works</strong> more than 5 times for exposed concrete<br />
formwork and 8 times for ordinary formwork. 5 or 8 uses shall be<br />
permitted only if forms are properly cared for, stored and repaired after<br />
each use. The Engineer may in his absolute discretion order rejection of<br />
any forms he considers unfit for use for a <strong>particular</strong> item, and order<br />
removal from the site of any forms he considers unfit for use in the<br />
<strong>works</strong>. Used forms brought on the site will be allowed proportionately<br />
fewer uses as decided by the Engineer. Use of different quality boards<br />
or the use of old and new boards in the same formwork shall not be<br />
allowed.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 395<br />
6.13 HACKING- OUT :<br />
Immediately after removal of forms, the concrete surface to be<br />
plastered shall be roughened with a bush-hammer or with chisel and<br />
hammer as directed by the Engineer to make the surfaces sufficiently<br />
coarse and rough to provide a key for plaster.<br />
7.0 APPROACH SLAB :<br />
7.1 General :<br />
Wearing coat shall be provided as indicated on the drawings.<br />
7.2 Approach Slab :<br />
Reinforced concrete approach slab covering the entire width of the<br />
<strong>road</strong>way shall be provided as per details given on the drawing. The sub<br />
base for the approach slab shall be as shown on the drawings or as<br />
directed by the Engineer.<br />
7.3 MODE OF MEASUREMENT & ITEM TO INCLUDE :<br />
The measurement for wearing coat shall be measured in cubic meters.<br />
The contract unit rate for wearing coat is inclusive of all the cost of all<br />
materials including steel, labours, tools and plant and other costs for<br />
the satisfactory completion of the work as per the above <strong>specifications</strong>.<br />
8.0 APRON & PITCHING :<br />
8.1 APRON :<br />
8.1.1 Description :<br />
This work shall consist of laying boulders directly in wire, crates on the<br />
bed for protection against scour.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 396<br />
8.1.2 General :<br />
The stones used in apron shall be sound, hard, durable and fairly<br />
regular in shape. Stone subject to marked deterioration by water or<br />
weather shall not be used. The thickness and shape of apron shall be<br />
as indicated on the drawings. The surfaces on which the apron is to be<br />
laid shall be leveled and prepared for the length and width as shown<br />
on the drawings.<br />
8.1.3 Leaving boulder Apron :<br />
The size of stone shall be as large as possible. In no case and<br />
fragment shall weigh less than 40 kg. The specific gravity of stones<br />
shall be as high as possible and it shall not be less than 2.50.<br />
To ensure regular and orderly disposition of the full intended quantity<br />
of stone in the apron, template cross walls in dry masonry shall be built<br />
about a meter thick and to the full height of the specified thickness of<br />
the apron at intervals of 30 meter, all along the length and width of the<br />
apron.<br />
8.1.4 Leaving crates and Mattresses in the Apron :<br />
The crates shall be made from 5mm galvanised iron wire. The mesh of<br />
the crate shall not be more than 150 mm.<br />
Wire crates for shallow or accessible situations shall be 3 meter x 1.50<br />
meter x 1.25 meter in size. Where these have to be deposited so that<br />
there is a change of overturning, the care shall be divided into 1.50<br />
meter compartments by cross matting.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 397<br />
For deep or inaccessible situations, wire crates can be made smaller<br />
subject to the approval of the Engineer.<br />
Wire crates built in-situ, shall not be larger than 7.50 meter x 3 meter x<br />
0.60 meter, nor smaller than 2 meter x 1 meter x 0.30 meter. Sides of<br />
large crates shall be securely stayed at intervals of not more than 1.50<br />
meter to prevent bulging.<br />
The netting shall be made by fixing a row of spikes on a beam at a<br />
spacing equal to the mesh. The beam must be a little longer than the<br />
width of neeting required. The wire is to be cut to lengths about three<br />
times the length of the net required.<br />
Each piece is bent at the middle round one of the spikes and the<br />
weaving commenced from one corner. A double twist shall be carefully<br />
done by means of a strong iron bar, five half turns being given to the<br />
bar at each splits.<br />
The bottom and two ends of the grate or mattress shall be made at one<br />
time. The other two sides shall be made separately and shall be<br />
secured to the bottom and the ends by twisting adjacent wires together.<br />
The top shall be made separately and shall be fixed in the same<br />
manner as the sides after the crate of mattress has been filled.<br />
Wherever possible, crates shall be placed in position before filling with<br />
boulders. The crate shall be filled be carefully hand packing the<br />
boulders as tightly as possible and not by merely throwing in boulders.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 398<br />
8.2 PITCHING OF SLOPES :<br />
8.2.1 Description :<br />
8.2.2 General :<br />
This work shall consist of covering the slopes of guide banks training<br />
<strong>works</strong> and round embankment with stones boulders or bricks over a<br />
layer of granular materials called filler.<br />
The pitching shall be provided as indicated on the drawings. Stones<br />
subject to marks of deterioration by water or weather will not be<br />
accepted.<br />
The stone shall be sound, hard, durable and fairly regular in shape.<br />
The largest stones procurable shall be supplied, and in no case shall<br />
nay fragment weight less than 4kg. Unless otherwise permitted by the<br />
Engineer. The sizes of spalls shall be minimum 25mm and shall be<br />
suitable to fill the voids in the pitching.<br />
To drain off the seepage water and to prevent erosion of the bank<br />
material, one or more layers of graded materials, commonly known as<br />
a filter medium shall be provided underneath the pitching. The material<br />
for the filter shall consist of round gravel, sound or brick ballast and<br />
coarse sand. For a single layer filter the compacted thickness of the<br />
filter shall not be less than 159 mm. For a multi-layer filter, the<br />
compacted thickness of each layer of filter material shall not be less<br />
than 115mm.<br />
The gradation of the filter material to satisfy the following requirements.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 399<br />
8.2.3 Requirement of filter material:<br />
NOTE:<br />
1. D15 of filter/D15<br />
of Base material<br />
2. D15 of filter/D85<br />
of base material<br />
– 5 to 40, provided that the filter<br />
dose not contain more than 5% of<br />
material filter than 0.075mm.<br />
- 5 or less<br />
3. The grain-size curve of the filter should be roughly parallel to<br />
that of the base material.<br />
Filter may not be required if embankment consists of CH or CH soils<br />
with liquid limit grater than 30, resistant to surface erosion. If a layer of<br />
material is used in this case as bedding for pitching, it shall be well<br />
graded and its D85 size shall be at least twice the maximum void size<br />
in the pitching.<br />
1. In the forgoing, D15 means the size of the sieve that allows 15%<br />
by weight of the filter material to pass through it, and similar is<br />
the meaning of D 85.<br />
2. If more than one filter layer is required, the same requirement as<br />
given above shall be followed.<br />
3. The finer filter shall be considered as the base material for<br />
selection of gradation of the coarser filter.<br />
4. The filter material shall be suitable complete to a firm condition.<br />
8.2.4 Construction Operations:<br />
Before laying the pitching the sides of banks shall be trimmed to the<br />
required slope and profiles put up by means of line and page at
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 400<br />
interval of 3 meters to ensure regular straight work and an uniform<br />
slope throughout. Depressions shall be filled and thoroughly<br />
compacted.<br />
The filter granular material shall be laid over the prepared base and<br />
suitable compacted to a thickness of 150 mm or as specified on the<br />
drawings.<br />
The lowest course of pitching shall be started from the toe wall and<br />
built up in courses upward. The toe walls shall be in dry rubble<br />
masonry (uncoursed) conforming to clauses in case of dry rubble<br />
pitching and shall be in brick work in cement mortar 1:4 in case of<br />
brick pitching.<br />
The stone pitching shall commence in a trench below the toe of slope.<br />
Stone shall be placed by derrick or by hand to the required length,<br />
thickness and depth conforming to the drawings. Stones shall be set<br />
normal to the slope, and placed so that the largest dimension is<br />
perpendicular to the face of the slope, unless such dimension is greater<br />
than the specified thickness of pitching. The largest stones shall be<br />
placed in the bottom courses and for use as headers for subsequent<br />
courses.<br />
When full depth of pitching can be formed with a single stone, the<br />
stones shall be laid breaking joints and all interstices between adjacent<br />
stones shall be filled in with spalls of the proper size and wedged in<br />
with hummers to ensure right packing.<br />
When two or more layers of stone must be laid to obtain the design<br />
thickness of pitching, dry masonry shall be used and stones shall be<br />
well bonded.<br />
Where bricks are to be used, same shall be laid on the prepared base<br />
in one or more layers as specified. When more than one layer is to be<br />
adopted, adjacent layers shall be properly bonded by means of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 401<br />
sufficient number of pin headers, extending from one layer to the other.<br />
The bond used in laying shall be directed by the Engineer.<br />
9.0 WEEP HOLE<br />
Weep holes shall be provided in solid plain concrete/reinforced<br />
concrete, brick/stone masonry, abutment, wing wall and return walls as<br />
shown on the drawing or directed by the Engineer to drive moisture<br />
from the back filling. Weep holes shall be provided with 110mm dia<br />
HDPE pipes for structures in plain/reinforced concrete or brick<br />
masonry. In case of stone masonry, weep holes shall be 80mm wide,<br />
150mm high or circular with 150mm diameter. Weep holes shall<br />
extend through the full width of concrete/masonry with slope of about 1<br />
vertical : 20 horizontal towards the draining face. The spacing of weep<br />
holes shall generally be 1m. in either direction or as shown in the<br />
drawing with the lowest at about 150mm above the low water level or<br />
ground level whichever is higher or as directed by the Engineer.<br />
10.0 Providing & Fixing galvanized iron 150mm (about 6”) diameter water<br />
10.1 General:<br />
spouts as per drawings.<br />
The item refers to the provision of 150mm (about 6”) diameter<br />
galvanized iron pipe water spouts as detailed on the drawings for the<br />
draining of water from over the bridge without falling the masonry or<br />
concrete of decking or piers, by suitably taking water spouts sufficiently<br />
down.<br />
10.2 Materials:<br />
150mm (about 6”) diameter galvanized iron pipe of required length as<br />
indicated on the drawings.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 402<br />
10.3 Construction:<br />
The galvanized iron 150mm (about 6”) diameter pipe shall be cut to<br />
the length and shape indicated on the drawings and shall be suitably<br />
fixed in the masonry or form-work of concrete symmetrically at 6m<br />
(about 20’) center to center or at other intervals or places as directed by<br />
the Engineer while the masonry is being laid or concreting of the slab is<br />
taken up. These pipes should be placed symmetrically to the span i.e.<br />
at half point or at 1/3 points or at ¼ points. The pipe shall be suitably<br />
embedded in the masonry or concrete while masonry or concrete is<br />
being laid and not after laying. The inside end of the pipe shall be<br />
neatly shaped and finished to fit in the surface of masonry or concrete<br />
without any projection so as to provide smooth and unobstructed<br />
passage for the water to enter.<br />
10.4 Item to include:<br />
The cost of pipes, other materials, fastenings, labour, use of tools etc.<br />
and operations required to complete the item satisfactorily.<br />
10.5 Mode of measurement and payment:<br />
The contract rate for the water spouts shall be for one number of the<br />
water spout. The water spouts shall be measured for their numbers<br />
provided on the bridge.<br />
11.0 Providing & Fixing 50mm Dia. PVC pipe with required length including<br />
whole assembly & fitting:<br />
11.1 Scope of work, item to include:<br />
i) Pipes of respective diameter, fitting, cement mortar, cement<br />
concrete and necessary fixtures.<br />
ii) All necessary labour, materials and use of tools.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 403<br />
11.2 Mode of Measurement and Payment :<br />
The contract rate shall for one meter or part thereof pipe actually<br />
laid. The measurement shall be over all the fittings along with the<br />
centre line from end to end.<br />
12.0 REINFORCEMENT:<br />
12.1 STEEL:<br />
Mild steel, round shall conform to IS :431. TMT/HYSD bars shall<br />
conform to IS: 1786, hard drawn steel wire fabric shall conform to<br />
IS:1566-1877, or rolled steel made from structural steel conforming<br />
to IS: 226. Any other steel specific for reinforcement shall conform in<br />
every respect to the latest relevant Indian Standard Specifications<br />
and shall be of tested quality under the I.S.I. certifications scheme.<br />
All reinforcing work for concrete work shall be executed in<br />
conforming with the drawings supplied and instructions given by the<br />
Engineer and shall generally be carried out in accordance with the<br />
relevant Indian Standard Specifications IS:2502.<br />
12.2 Inspection and Testing:<br />
12.3 Lapping:<br />
Every bar shall be inspected before assembling on the <strong>works</strong> and<br />
any defective brittle, excessively rusted or burnt bars shall be<br />
removed. Cracked ends of bars shall be cut out. Specimens sufficient<br />
for three Tehsile Tests per 10 tonnes of bars and for each different<br />
size shall be sampled and tested by the Contractor, batches shall be<br />
rejected if the average results of each batch are not in accordance<br />
with <strong>specifications</strong>.<br />
As far as possible bars of the maximum length available shall be
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 404<br />
used. Laps shown in the drawings or otherwise specified by the<br />
Engineer will be based on the use of bars of maximum length. In<br />
case the Contractor wishes to use shorter bars, laps shall be<br />
provided at the Contractor's cost in the manner and locations<br />
approved by the Engineer.<br />
As and when necessary welded laps shall be provided as specified<br />
by the Engineer. No extra payment shall be made for welding the<br />
joints.<br />
12.4 Mode of Measurement :<br />
Actual length of a steel reinforcement provided in the work will be<br />
measured & weight of steel reinforcement will be calculated on the<br />
basis of standard weight per Rmt of each diameter & will paid<br />
accordingly.<br />
13.0 Providing and applying cement polymer composite coating<br />
anti corrosive treatment to TMT steel bar reinforcement as<br />
per cement polymer composite coating treatment developed<br />
by CECRI including cleaning the bar by means of any<br />
established mechanical or manual method for removing the<br />
rust and deleterious matter applying rapid setting primer<br />
and cement polymer sealing coat of approved and licensed<br />
by CECRI. All accessories, labour and materials required,<br />
loading, unloading, stacking as required and giving the<br />
anticorrosive treatment using chemicals (CPC) method etc<br />
complete, as directed by Engineer.<br />
13.1 GENERAL:<br />
The Standard covers the code of practice for corrosion protection of<br />
reinforcing steel using cement polymer composite coating system. In<br />
this preparation, assistance has been derived from the following:
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 405<br />
13.2 Scope:<br />
a) ASTM A775/A775M-94 standard specification for Epoxy-coated<br />
reinforcing steel bars.<br />
b) Test methods specified by Central Electro-chemical Research<br />
Institute, Karaikudi-630 006.<br />
This practice covers the various test procedures required to ensure the<br />
quality of the coated product.<br />
13.2.1 This specification covers the code of practice for cement-polymer<br />
composite coating system which shall be applicable to reinforcing bars<br />
conforming to BIS:432 (Part 1): 1982- Specification for mild steel and<br />
medium tensile steel bars and hard drawn steel wire for concrete<br />
reinforcement- Part I Mild Steel and Medium Tensile Steel Bars.<br />
BIS:432 (Part 2): 1982-Specification for mild steel and medium tensile<br />
steel bars and hard drawn steel wire for concrete reinforcement – Part<br />
2 Hard – drawn steel.<br />
BIS:1139:1966-Specification for hot-rolled mils steel, medium tensile<br />
steel and high yield strength steel deformed bars for concrete<br />
reinforcements.<br />
13.2.2 This standard specifies the recommended practice for surface<br />
preparation, method of application, testing, inspection; handling and<br />
stacking of coated reinforcing bars.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 406<br />
13.3 METHOD OF APPLICATION OF COATING SYSTEM<br />
The application of the cement polymer composite coating system<br />
compresses the following sequence:-<br />
Surface Preparation<br />
The surface of the steel reinforcing bars to be coated shall be cleaned<br />
by abrasive (dry sand) blast cleaning to the near-white metal in<br />
accordance with SPC-SP10/NACE No.2-1994. It includes the following<br />
procedures.<br />
(a) Prior to blast cleaning visible deposits or oil or grease shall be<br />
removed by suitable cleaning method.<br />
(b) Clean dry compressed air shall be used for nozzle blasting.<br />
(c) Dry uniformly graded silica sand shall be used for blast cleaning<br />
which should be free from contaminants.<br />
(d) Suitable arrangements shall be made in the sand blasting unit to<br />
suit automation.<br />
(e) During the operation, the pressure at the nozzle shall be regulated<br />
as per the supplier’s specification.<br />
(f) Dust and residues shall be removed from prepared surface by<br />
brushing, blowing off with clean, dry air, vacuum cleaning or other<br />
methods.<br />
(g) Any visible rust that forms on the surface of the steel after blast<br />
cleaning shall be removed by reblasting the rusted areas before<br />
coating.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 407<br />
(h) The prepared surface shall meet the visible standards of<br />
comparisons as in SSPC-VIS 1 or SSPC-VIS2.<br />
13.4 Application of coating:<br />
13.4.1 The coating shall be applied to the cleaned surface as soon as after<br />
cleaning, and before oxidation of the surface discernible to the inaided<br />
eye occurs. However, the application of the coating shall not be<br />
delayed more than 4 hrs after cleaning.<br />
13.4.2 A rapid setting primer shall be applied over the prepared surface of the<br />
reinforcing steel either by brushing or dipping.<br />
13.4.3 After 30 minutes of application of the primer a cement polymer sealing<br />
coat shall applied either by brushing or dipping.<br />
13.4.4 The coated rods shall be handed after 6 hrs.<br />
14.0 SPECIFICATION FOR PROVIDING ANTI CORROSIVE TREATMENT TO<br />
M.S. OR TMT REINFORCEMENT BARS WITH CEMENT POLYMER<br />
COMPOSITE COATING SYSTEM (CPCC)<br />
14.1 REQUIREMENS OF THE COATED BARS<br />
The coated reinforcement rods of cement polymer composite coating<br />
system shall meet the following requirements:-<br />
(a) Thickness of the coating :<br />
a) After curing the minimum dry film thickness of the coated rods<br />
shall not be less than 150 + 25 microns.<br />
b) Measurements shall be made using commercially available<br />
coating thickness meter which should be specifically suitable for<br />
curved surfaces.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 408<br />
c) The minimum dry film thickness should be ensured atleast on<br />
five deformations/ribs over each one metre length of the coated<br />
rod.<br />
d) The thickness of the coating shall also be measured on the<br />
straight length of the bar between the ribs and that also shall not<br />
be less than 150 + 25 microns.<br />
(b) Continuities of the coating:<br />
The coated rod when visually examined should be fairly uniform in<br />
thickness and should be devoid of any defects such as cracks, peeling,<br />
bulging etc. No surface area should be left uncoated. No rust spot<br />
should be visible with the unaided eye.<br />
(c) Adhesion of coating:<br />
The adhesion of the coating shall be evaluated by mandrel bend test.<br />
The coated rods shall be bent around a mandrel through 1800 as per<br />
the test procedure-A given in the test procedure. When visually<br />
examined with unaided eye there shall not be any cracking or<br />
disbanding at the outside radius of the bent bar.<br />
(d) Relative bond strength:<br />
The relative bond strength of the coated/uncoated bars shall be<br />
evaluated by conducting pullout test (three cured coated bars and three<br />
uncoated bars) as per the procedure given in BIS 2770-Part I methods<br />
of testing bonds in Reinforced Concrete Part I - Pullout test (1967).<br />
The average bond strength at 0.25mm slip for coated bar shall not be<br />
less than of the uncoated bar.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 409<br />
(e) Resistance to applied voltage test:<br />
The resistance of the coating against chloride permeation and the film<br />
integrity on the rod shall be tested by conducting 2V- Impressed voltage<br />
test as per the test procedure – B given in the test procedure. At the end<br />
of 1 hour, there shall not be any evaluation of hydrogen gas at the<br />
cathode or appearance of corrosion products of iron at the anode.<br />
(f) Abrasion resistance:<br />
The Abrasion Resistance of the coating by labour abrasion should not<br />
be more than 100 mgn/1000 cycles using CS 10 wheel under 1 kg<br />
load per wheel (As per test procedure C).<br />
(g) Tolerable limit for chloride<br />
Tolerable limit for chloride in 0.0.1 N NaOH medium using anodic<br />
polarisation technique shall be 10.000 PPM (As per test procedure D).<br />
(h) Chemical resistance of coating:<br />
The chemical resistance of the coated bar shall be evaluated as per the<br />
test procedure- E by partially keeping the coated rods immersed in the<br />
following four environments for 45 days.<br />
a) 3M NaOH<br />
b) 3m CaCI 2<br />
c) Saturated Ca(OH) 2<br />
d) Distilled water<br />
At the end of the test period, when visually examined there shall not be<br />
any blistering, softening or peeling on the coated rods.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 410<br />
(i) Impact Resistance of the Coating:<br />
The resistance of the coated rebar to mechanical, damage shall be<br />
assessed by standard falling weight test as per the test procedure-F with<br />
an impact force of 9Nm. No shattering, cracking or bond-loss of the<br />
coating shall be observed except at the impact area.<br />
(j) Acceptance/inspection:<br />
The coated rods shall be not meet the requirements of the above<br />
specification shall be rejected.<br />
The manufacturer of the coated rebar, shall submit a certificate from an<br />
appropriate testing agency that the coated rebars meet the<br />
requirements of the specification.<br />
14.2 QUALITY CONTROL MEASURES TO BE TAKEN AT SITE<br />
1) The application steps are to be supervised strictly as per the<br />
specification.<br />
2) Sand-blasting of the surface of reinforcement steel is to be<br />
done as per the surface preparation mentioned in<br />
application system.<br />
3) Primer coat and sealing coat are to be applied by brush, or<br />
by spraying or by dipping under supervision.<br />
4) Coating thickness of the finished bar can be checked<br />
frequently by per types alcometer.<br />
5) The 2 V Impressed Current Test (ASTM A-775/775/5M-<br />
90) is to be taken randomly at site laboratory (every 15<br />
days). It is the most critical test for finished product.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 411<br />
6) The coated bars bending test can be observed frequently at<br />
site.<br />
14.3 GUIDELINES FOR HANDLING, STACKING AND TRANSPORTING OF<br />
14.4 STACKING:<br />
COATED REINFORCING BARS<br />
The durability of the coated rebars is related to the coating quality. The<br />
more damage to the coating is more prone to corrosion. Good, job<br />
site practices can minimize the coating damage. For this reason,<br />
standards from ASTM, JSC, NACE(USA) have laid down specific<br />
procedures for stacking and transporting coated bars. Some important<br />
guidelines are referred here.<br />
i) It is preferable to store the coated bars on buffer material placed<br />
at suitable intervals instead of placing them directly on the<br />
ground.<br />
ii) It is not desirable to store coated bars by piling them on top of<br />
one another they are to be stored by piling buffer materials such<br />
as wood, rubber, jute sacks etc., should be used to separate the<br />
layers. However, the number of layers allowed shall be limited<br />
to a maximum of five.<br />
iii) The coated rods shall be stored in yard.<br />
iv) If any damage had occur during stacking it should be repaired<br />
immediately by the same coating formulation before any rusting<br />
occur.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 412<br />
14.5 HANDLING AND TRANSPORTATION:<br />
i) The coated bars shall be securely bound together using a buffer<br />
material (padding) and it is desirable that the bent bars shall<br />
supplied with some canny cover.<br />
ii) When loading and unloading of bundles of coated bars, it shall<br />
be preferable lift them with a strong back, spreader bar multiple<br />
supports etc. To avoid external bending nylon slings at 2 or 3<br />
points shall be used.<br />
iii) The bundles of bars shall not be dropped.<br />
iv) If damage had occurred to the coating during transportation it<br />
must be repaired before rusting occurs.<br />
14.6 SPECIFICATIONS FOR PATCH REPAIRING OF COATING DAMAGES<br />
a) Coating repair is required when peeling off and other damages<br />
occur during fabrication or handling.<br />
b) The patch repair shall be done at site using the same coating<br />
material as per manufacturer’s recommendations.<br />
c) It is essential to ensure a minimum coating thickness of 150<br />
microns at all the repaired portions before embedding in<br />
concrete.<br />
14.7 SPECIFICATION FOR CUTTING, BENDING AND WELDING OF<br />
COATED REBARS AT FIELD.<br />
i) It is desirable that the coated rods shall be bent gradually.<br />
ii) In the field, the cut and welded portions of the coated rebars<br />
shall be repaired by the same formulations.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 413<br />
iii) The cut ends of the coated rebars shall be repaired by the same<br />
formulation.<br />
iv) It is advisable that the binding wires shall also be coated by the<br />
same formulation.<br />
14.8 SAFETY PRECAUTIONS AND GUIDELINES<br />
To be followed during the preparation and application of the cement<br />
polymer composite coating (A know how released by CECRI).<br />
(i) A solvent resistant hand gloves must be used during the<br />
handling of chemicals.<br />
(ii) Face masks should be worn during the preparation and<br />
application.<br />
(iii) Other safety measures should be adopted for the persons<br />
handling solvents, chemicals, finished products and during<br />
application.<br />
(iv) Closed sand blasting unit shall be used to avoid dust spreading.<br />
(v) Aprons should be made preferably from plastics and rubber<br />
must be used.<br />
(vi) The containers containing chemicals and finished products shall<br />
be properly sealed.<br />
(vii) Adequate safety measures should be adopted for field<br />
operations.<br />
(viii) In general, all the safety measures should be followed as per<br />
Industrial safety regulations.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 414<br />
14.9 SPECIFICATION FOR THE COATED REBARS<br />
Specifications:<br />
1) Bond strength<br />
Name of process Cement-polymer composite coating system for the<br />
corrosion protection of reinforcing and prestressing steels.<br />
(The bend strength of the coated rebar<br />
in 7 days cured M20 concrete).<br />
2) Flexibility of the coating (The flexibility<br />
of the coated rebar under mandrel<br />
test).<br />
: 1.2 N/mm²<br />
: Not affected<br />
3) Thickness of the coating : 150 + 25 Microns<br />
4) Hardness of the coating (Pencil<br />
Hardness)<br />
: Passed 7 H<br />
5) Salt spray test : Passed 1000 Hrs.<br />
6) Impressed voltage test : Passed 1 hour critical test.<br />
7) Resistance to sulphate : 10,000 PPM.<br />
8) Resistance to chloride (by anodic<br />
polarisation test)<br />
: 10,000 PPM.<br />
9) Shelf life of the coated bars : 6 months
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 415<br />
10) Resistance to UV Rays (As per ASTM D<br />
4060/84) using CS10 wheel 1 kg.<br />
load for 1000 cycles.<br />
11) Stress corrosion cracking test (As per<br />
FIP 200 hrs. test in 20% NH4CN<br />
solution)<br />
14.10 Tests for CPCC:<br />
14.10.1 Test procedure A:<br />
: Weight loss 70mg<br />
Allowable weight –loss<br />
100mg<br />
: Passes<br />
Determination of Adhesion of the Coating:<br />
Adhesion of the coating is to be tested as per ASTM A775/775 M 94 d.<br />
10mm dia coated rods of length 1m shall be used in this test. The<br />
coated rods shall be padded with sponge and bent to 180 0 around a<br />
75mm diameter mandrel. The bending shall be done at an uniform<br />
rate and not suddenly. No cracking of the coating shall be visible to the<br />
unaided eye on the outside radius of the bar. If the test is to be<br />
conducted on other than 10mm diameter rod, then the diameter of the<br />
mandrel has to be changed accordingly as tabulated below.<br />
14.10.2 Test Procedure B:<br />
Diameter of the Rod (mm) Diameter of the mandrel (mm)<br />
8mm and 10mm 75<br />
Applied Voltage Test:<br />
16 100<br />
25 200<br />
32 250<br />
Two identical coated bars of same size and length shall be used in the<br />
test. 14mm gauge copper wire shall be soldered on soldered on the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 416<br />
one end of the each bar. The other end of the bars shall be sealed with<br />
an insulating material to a length of 2.5 cm. The exposed area on<br />
which test is to be conducted shall not be less than 240cm 2 . If 10mm<br />
dia rods are used then the length exposed shall not be less than 80cm.<br />
A non-conductive plastic container of size not less than 150 x 150mm x<br />
850mm is filled with 7% NaCl solution (70 gms/litre) up to the height<br />
of 800mm. The coated rebars shall be suspended vertically so as to<br />
have a clearance of 25mm from the bottom, 40mm from the sides and<br />
40mm in between the rods. A potential of 2 V in between the coated<br />
rods shall be impressed for a period of 60 minutes using suitable DC<br />
power source. The voltage and current shall be measured by using a<br />
high resistance voltmeter having an internal resistance of not less than<br />
10 Mega Ohms and having a range upto 5 V (minimum). Storage<br />
batteries may also be used for impressing the voltage.<br />
During this 60 minutes of testing, there shall not be any coating failure<br />
as evidenced by evolution of hydrogen gas at the cathode or by<br />
appearance of corrosion production of iron at the anode.<br />
14.10.3 Test Procedure C:<br />
Determination of Abrasion Resistance of the Coating:<br />
Test shall be conducted as per ASTM D4060 using Taber abraser using<br />
CS-10 wheel under 1kg. load per wheel. Abrasion resistance of the<br />
coating shall be conducted on panel of size 100mm x 100mm in which<br />
8mm dia. hole shall be drilled. The panel shall be coated as per<br />
specified procedure. After curing, thickness of the coating shall be<br />
measured in several locations along the path to be abraded. The initial<br />
weight of the panel shall be measured to the nearest 0.1mg. Then the<br />
coated panel shall be mounted on the turn table. The abrading heads
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 417<br />
shall be placed on the panel and the vacuum pick up nozzle kept in<br />
position. The counter shall be set in position. The vacuum, pick up and<br />
turn table of the abrader shall be fixed for 1000 cycles. After 1000<br />
cycles loose abradings remaining on the test specimen shall be<br />
measured for finding the loss in weight. The weight loss shall not<br />
exceed 100mg. The test shall be conducted on duplicate specimens.<br />
14.10.4 Test Procedure D:<br />
Chloride Tolerable Limit:<br />
10mm dia. cement polymer coated rod of length 10cm shall be used.<br />
Bottom edge of the coated rod shall be sealed using lacquer. Then test<br />
specimen is kept immersed in 0.04 N NaOH + 10,000 ppm chloride<br />
and potential is monitored using high impedance Multimeter against<br />
suitable reference electrode such as saturated calomel electrode. After<br />
getting stabilized potential, using appropriate current regulator (0-<br />
100mA), the test specimen is anodically polarized at a constant current<br />
density of 290 uA/cm2 using a platinum/stainless steel/TSIA/Polished<br />
mild steel as cathode. Potential with time is followed for 5 minutes. At<br />
the end of 5 minutes, no rust spots shall be observed on the coated<br />
rod.<br />
14.10.5 Test Procedure E:<br />
Chemical Resistance of the Coating:<br />
The coated rods (any diameter) of length 30cm shall be used in this<br />
test. The bottom edge of the coated rods are to be sealed using<br />
lacquer. Transparent PVC cylindrical container shall be used. 3M<br />
CaC123M NaOH, Saturated Ca (OH) 2 and distilled water are prepared<br />
as individual test solution and filled in the separate container up to the<br />
half of its height. Then the coated rods are kept partially immersed in<br />
the test solution so that they are in long term contact with both the<br />
liquid and vapor phase of the test solution. The test shall be conducted<br />
for 45 days. The coating should not blister, soften or disband during<br />
this period.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 418<br />
14.10.6 Test Procedure F:<br />
Impact Resistance of the Coating:<br />
The resistance of a cement polymer coated reinforcing bar to<br />
mechanical damage shall be determined by the failing weight test. A<br />
test apparatus similar to the described in test method G14 of the ASTM<br />
standard shall be used. Impact shall occur on the low lying areas of the<br />
coated bar, that is between deformation and ridges. The test shall be<br />
performed at room temperature. With an impact force of 9NM, no<br />
shattering, cracking or disbondment of the coating shall occur except at<br />
the impact area, that is, area permanently performed by the tup.<br />
Reference documents:<br />
a) ASTM G8-90 Standard Test methods for cathodic disbanding of<br />
pipeline coatings (method A).<br />
b) ASTM G20-88 Standard Test method for chemical resistance of<br />
pipeline coating.<br />
c) ASTM G12-83 Standard Test method for non-destructive<br />
measurement of film thickness of pipeline coating on steel.<br />
d) ASTM D-4060-90 Standard Test method for abrasion resistance<br />
of organic coatings by the Taber abraser.<br />
e) ASTM G14-88 Standard Test method for impact resistance of<br />
pipeline coating (Falling-weight test)<br />
f) BIS 2770- Part 1: 1967 – Methods of Testing bond in Reinforced<br />
Concrete Part 1- Pullout Test (1967).
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 419<br />
g) SSPC-SP10/NACE No.2-1994 Near white blast cleaning.<br />
h) SSPC VIS 2- Guide to standard method of evaluating degree of<br />
rusting on painted steel surface.<br />
i) SSPC SP COM-Surface preparation <strong>specifications</strong>.<br />
15.0 Coal Tar Epoxy Painting/Polymer Synthetic Elastomeric Coating cum<br />
Paint.<br />
15.1 General:<br />
The item shall be carried out in conformity to item description in<br />
Schedule ‘A’.<br />
15.2 Materials:<br />
15.3 Brushes:<br />
Paints shall confirm to relevant IS codes. All paints shall be mixed and<br />
stirred thoroughly in proportion as per manufacturers specification with<br />
a clean stick before use. While being use the paint shall be stirred often<br />
to keep the pigment in uniform suspension. Sample colour boards shall<br />
be prepared by the contractor and got approved by the Engineer<br />
before painting is started.<br />
Unless other methods of application like spraying are specified, paint<br />
shall be applied with brushes. All brushes shall be round or oval<br />
shaped.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 420<br />
15.4 Containers:<br />
15.5 Scaffolding:<br />
15.6 Cleaning:<br />
The paint while being applied shall be kept in shallow pans and not in<br />
deep cans and must be kept well stirred. All paint cans must be cleaned<br />
out at the end of each day’s work.<br />
Sturdy scaffolding as necessary shall be provided. Paint workers must<br />
be warned to avoid getting smeared with the paint and all safety<br />
measures shall be provided.<br />
Cleaning operations shall precede painting. The work shall be carried<br />
out in such a manner that dirt and matter removed by the cleaning will<br />
not come in contact with freshly applied paint. The method of<br />
preparing the surfaces for painting shall be as per manufacturers<br />
recommendations.<br />
15.7 Application:<br />
Preferably painting shall be done immediately, after cleaning on the<br />
same day. Paints shall be mixed and applied strictly as per the<br />
manufacturers recommendations. Paints shall not be applied when the<br />
air is misty or atmospheric conditions are such as in the opinion of<br />
Engineer, the conditions are otherwise unsatisfactory for the work. It<br />
shall not be applied upon dump and moist surfaces. Paint shall be<br />
worked into all crevices and corners where possible and surfaces not<br />
accessible to brushes shall be painted by sheep skin or any other<br />
method approved by the Engineer. Painting shall be done in a neat<br />
and workmanlike manner. Paint shall be applied in specified coats as<br />
per the manufacturing recommendations so as to produce a uniform<br />
even coating over the entire surface, free from streaks, pitting, wrinkles<br />
or other irregularities.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 421<br />
The number of priming and finishing coats shall be as specified for the<br />
<strong>particular</strong> item. Sufficient time shall be allowed for one coat of paint to<br />
dry before the next is applied. Boars indicating “Wet Paint” shall be put<br />
up wherever necessary.<br />
15.8 Item to include:<br />
The rate for the item shall include all labour, materials and use of tools<br />
necessary to carry out the work:<br />
1) Supply of specified approved paints for priming and finishing<br />
coats.<br />
2) Preparing the surfaces.<br />
3) Scaffolding including its erection and dismantling.<br />
4) Application of primer coat if specified.<br />
5) Application of specified numbers of coats.<br />
6) Protecting the painted surface till dry.<br />
7) Testing of material as per relevant IS codes.<br />
15.9 Mode of Measurement and Payment:<br />
The contract rate shall be per unit of one square metre of painted<br />
surface. The liner dimensions shall be measured correct upto cm. The<br />
corners shall be worked out connect to two places of decimal of square<br />
metre.<br />
16.0 Providing Expansion Joints as per detailed drawings.<br />
16.1 General:<br />
The item provides for the expansion joints in the cement concrete of<br />
wearing course.<br />
16.2 Material:<br />
The joint requires a copper plate and the bituminous filling material.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 422<br />
The width of joint shall correspond to the space between the ends of<br />
the slabs.<br />
For the expansion joint the copper plate shall be of 1.63 mm (16<br />
gauge) thickness with a width of 30 cm (about 12”).<br />
The bituminous filler shall be as under:<br />
1) Poured joint filler:<br />
The poured joint filler shall be composed of the following<br />
ingredients:<br />
Clean fine sand : 55 percent<br />
Bitumen S.35 grade of I.S. 73-1961 : 40 percent<br />
Asbestos Fibre : 5 percent<br />
The sand and the bitumen shall be heated separately to the<br />
temperature of 163 0 C (about 325 0 F). Both sand and bitumen<br />
shall be mixed intimately after heating. To this shall be added<br />
asbestos fibre and the whole mixed thoroughly. While hot, the<br />
mixture shall be poured into the clean dry joint and allowed to<br />
thicken. The mixture shall be laid slightly poured and if found to<br />
be very high, the surplus shall be removed by heated knife or<br />
trowel.<br />
When propriety product from the market is to be used, it shall<br />
conform to I.S. 1834-1961.<br />
2) Pre-moulded joint filler:<br />
The joint filler shall be composed of the following ingredients:<br />
Clean fine sand : 60 percent<br />
Bitumen S.35 grade of I.S. 72-1961 : 30 percent<br />
Cement : 8 percent<br />
Chopped Hemp : 2 percent
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 423<br />
The sand shall be heated in a flat pan to a temperature of 1770C (about 3500F). The bitumen shall be separately heated to a<br />
temperature of 1630C (about 3250F). The requisite quantity of bitumen<br />
shall be added to the heated sand and stirred well. The required<br />
quantity of cement and chopped hemp shall be added and the whole<br />
mixed intimately. All the materials shall be measured by weight. The<br />
mixture shall be then poured into moulds and allowed to cool. Width of<br />
the moulds shall be such as to fill the U of the copper plate and remain<br />
about 25mm. below the top of the slab. When proprietary product from<br />
the market is to be used it shall conform to I.S. 1838-1961.<br />
16.3 Construction:<br />
The copper plate shall be bent and shown on the drawings and shall<br />
be laid over the R.C.C. deck-slab with its U in the gap in between<br />
adjacent deck-slabs. The wearing coat concrete shall then be laid<br />
leaving requisite width of the joint in between the two wearing coat-<br />
slabs. If full width of bridge is not obtained in one piece of the copper<br />
plate, pieces of copper plates shall be brazed together to obtain the<br />
requisite width i.e. the width of the bridge. When the slabs are cured<br />
and are to be opened to traffic, all the dirt, mud etc. accumulated in<br />
the joints during the process of curing of the slabs shall be raked out,<br />
cleaned and washed before filling in the bituminous filler. The joint<br />
between the two wearing course slabs and the U of the copper plate<br />
shall then be filled with the bituminous filler.<br />
In case it is so ordered by the Engineer, the joints shall be formed of<br />
pre-moulded joint filler and in such a case, this pre-moulded joint filler<br />
shall be placed in the joint immediately before taking up the concreting<br />
of the adjoining slab of the wearing coarse. These pre-moulded joint<br />
fillers shall fit the U of the copper plates also and remain about 25mm.<br />
below the top of the slab. This gap shall be filled with poured joint<br />
filler.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 424<br />
16.4 Rate to Include:<br />
1) Copper plate, its bending, soldering, fixing in position and filling<br />
joint with the bituminous filler, pre-moulded and or poured.<br />
2) All labour, materials, use of equipment required for satisfactory<br />
completion of the item.<br />
16.5 Mode of measurement and payment:<br />
The contract rate shall be for one square metre of the deck slab joint as<br />
provided in the tender. The linear measurement of the joint shall be<br />
recorded correct upto 2 places of decimals of a metre.<br />
17.0 Demarcation of the Plots/Road/bridge by traverse survey, with one<br />
second theodolite. Taking angles & distance at turning points including<br />
transfer of co-ordinate from known pontto survey area and as directed<br />
by Engineer taking ground level on the alignment.<br />
On receipt of the Work Order, the Contractor should start survey<br />
immediately for finalization of alignment and preparation of<br />
Construction Drawings.<br />
The Contractor will demarcate the exact alignment of the Road/Bridge<br />
as per the guidelines furnished to him by the Engineer by stout pegs not<br />
apart than about 30 m c/c. and mark the changes on the pegs.<br />
Additional and distinctive pegs will be driven at all deviation points.<br />
The alignment, after demarcation, will be inspected -and approved by<br />
the Engineer and modification as directed will be given effect to. After<br />
final approval, the Contractor should take levels along the alignment at
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 425<br />
10m c/c and also at salient points. Similarly, the Contractor shall take<br />
4 levels (2.5 Mtrs. And 5 Mtrs.) on each side of level points as directed<br />
by Engineer. The deviation angles shall be measured by a theodolite.<br />
Structures, large trees, if any, etc. in the corridor under survey shall be<br />
accurately noted. Based on this information, the Contractor shall<br />
prepare drawings with scale:<br />
Horizontal I: 1000, Vertical: 100 or as directed.<br />
The Contractor shall submit 6 copies of the drawings to the Engineer.<br />
The Engineer will return two copies showing thereon all details required<br />
for execution of the work as 'CONSTRUCTION' drawing. On<br />
completion of work, the Contractor shall incorporate change on the<br />
original drawing, if done during execution of work, and hand over<br />
original tracing and two copies of the same AS-BUILT DRA WINGS to<br />
the Engineer.<br />
All the work described above shall be paid in the item provided in BOQ<br />
on running kilometer basis measured along the alignment of water<br />
main.<br />
18.0 Providing Dry Stone Pitching 23 cm. Thick.<br />
18.1 General:<br />
18.2 Material:<br />
The item provides for dry rubble stone pitching 23 cm (about 9”) thick<br />
for the bank work.<br />
The rubble stones for pitching shall be sound, hard and durable and<br />
fairly regular in shape. The depth of the stone shall be about equal to<br />
the specified thickness of pitching of stone shall generally be not less
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 426<br />
than 9.9 liters (about 1/3 cu.ft.) or other size ordered by the engineer<br />
having, regard to the nature of the stones being quarried. The smaller<br />
size stone required extent and they shall not be used in two or more<br />
thickness as a substitute for the stone of full thickness.<br />
18.3 Preparation of the Base:<br />
The slopes of the bank shall be made up with murum and trimmed to<br />
the required slope and properly compacted under this item. Profiles<br />
shall be put up with pegs and strings at required intervals for the<br />
pitching to ensure that is done true to line, curves, levels, thickness and<br />
slopes.<br />
18.4 Construction:<br />
A masonry toe wall or line of pain headers when necessary shall be<br />
provided at the toe to support the pitching and shall be paid for<br />
separately. The lowest course of pitching shall be started from the toe<br />
wall or the line of pin headers at the toe of the slopes and the pitching<br />
laid course by course up the slope.<br />
The stones for the pitching shall be used after merely knocking out<br />
weak corners and edges with a mason’s hammer. The stones shall be<br />
laid closely in position on the prepared bed and firmly set with the even<br />
face on top. The pitching shall be laid to lines, levels, curves and slopes<br />
as indicated in plans or as ordered by the Engineer. Each stone shall<br />
cover the full depth of pitching and shall be perpendicular to the<br />
sloping bed. The stone shall be laid breaking joints as far as possible.<br />
Additional murum bedding if required for getting proper slope, shall be<br />
carried out simultaneously with each course pitching, watered, if<br />
necessary and rammed.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 427<br />
The interstices in the joints between adjacent stones shall be filled in<br />
with spalls of the proper size and wedged in with hammers to ensure<br />
packing. Such filling shall be carried out immediately after packing<br />
larger stones and before the next upper layer is taken in hand.<br />
18.5 Item to Include:<br />
i) Preparing the base and putting up profiles.<br />
ii) Laying dry rubble pitching of the specified thickness to line,<br />
curves, slopes and levels including preparing base, making up<br />
trimming and compacting the bed and hand packing.<br />
iii) All labour, materials and use of tools and plant necessary for the<br />
satisfactory completion of the item.<br />
iv) Repairing disturbed pitching, if any within three months of<br />
completion.<br />
18.6 Mode of Measurement & Payment:<br />
The contract rate shall be for one sq. mt. of finished pitching. The<br />
Dimension shall be measured correct upto a cm. and the area worked<br />
out correct upto the second place of decimal of a sq. metre.<br />
19.0 Providing R.C.C. parapet with M-35 grade cement concrete of<br />
19.1 General:<br />
trap/granite/quartzite/gneiss metal with cast-in-situ/precast panels, as<br />
per the detailed drawing including reinforcement, scaffolding,<br />
centering, form work, compacting, finishing and curing complete.<br />
The item refers to the provision of R.C.C. parapet with precast or cast-<br />
in-situ panels as per the item as detailed in the working drawings.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 428<br />
19.2 Materials:<br />
19.3 Construction<br />
Steel bar reinforcement and wire shall comply with specification. The<br />
diameter of the bars shall be as shown in the working drawings.<br />
Cement concrete for R.C.C. shall comply with specification of controlled<br />
concrete. Proportion of concrete shall be as per mix design. Maximum<br />
size of coarse aggregate for R.C.C. panels and railing shall be 6mm<br />
(about ¼”) and 20mm (about ¾”) for the posts. Mixing the compacting<br />
shall be mechanical at the choice of the contractor subject to the<br />
production of concrete of uniform consistency with all coarse<br />
aggregates entirely covered with cement mortar and a dense concrete<br />
with good cast finish to the surfaces.<br />
The R.C.C. parapet shall be constructed as per detailed drawing after<br />
the centering of decking is removed.<br />
The R.C.C. parapet of the type mentioned in the item shall be built in<br />
between cast-in-situ R.C.C. posts to correct shape, dimensions and<br />
spacing specified on the drawings. The steel bar reinforcement of the<br />
posts shall be provided as specified and shown in the drawings and<br />
spliced to the bars protruding from the slab or the kerb.<br />
The concrete shall be cast to the shapes, sizes and spacings shown on<br />
drawings. The forms shall be such as to given the exact shape to the<br />
concrete members shown in the drawings or ordered by the Engineer.<br />
Cast-in-situ posts, panels and rails shall be plastered neatly with<br />
cement mortar of 1:3 mix to 5mm. (about ¼”) thickness and finished to<br />
smooth or sand face as ordered by the Engineer. Plastering shall be<br />
done immediately after and within one day of stripping the forms after<br />
roughening the concrete suitably. The plaster and concrete shall be well<br />
cured for 14 days.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 429<br />
Precast panels shall be cast to the required design with specified<br />
reinforcement and temped and cured for 14 days. They shall originally<br />
present smooth surfaces and shall be filled into the grooves left into the<br />
kerb properly supported and grouted. Thereafter the R.C.C. post and<br />
rail will be cast. Precast top rails may also be used along with precast<br />
panels in which case only posts will be cast in situ. The cast-in-situ<br />
members shall be plastered with 1:3 cement mortar 6mm (about ¼”)<br />
thick to smooth or sand face finish, immediately after and within one<br />
day of stripping the forms after roughening and cured for 14 days.<br />
19.4 Item to include:<br />
1) Providing R.C.C. cast-in-situ M-35 grade posts cast-in-<br />
situ/precast concrete panels and cast-in-situ/precast rails as<br />
shown in the drawing including form work and 6mm (about ¼”)<br />
thick plaster of cement mortar of 1:3 mix for cast-in-situ<br />
members.<br />
2) Reinforcement for precast and cast-in-situ members.<br />
3) All labour, materials, use of equipment, tools, plant, scaffolding<br />
etc. necessary for the completion of the item satisfactorily. No<br />
separate payment shall be made for concrete and reinforcement<br />
of R.C.C. members, the rate per metre being inclusive of all the<br />
necessary materials like those mentioned above.<br />
19.5 Mode of measurement and payment:<br />
The contract rate shall be for one metre length of the parapet<br />
completed to the shape and dimension shown on the drawings. The<br />
parapet shall be measured between the inside of the end pilasters over<br />
the abutments. Where there are only end posts, the parapet shall be<br />
measured from outside to outside of end posts. The length shall be<br />
measured correct upto two places of decimals of a metre.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 430<br />
20.0 Providing Flush/V groove pointing with cement mortar 1:3 for stone<br />
20.1 General:<br />
20.2 Pointing:<br />
masonry/brick work including scaffolding and curing complete.<br />
The item shall comply with Specification as per Schedule “A” in all<br />
respects and also as per <strong>specifications</strong> mentioned in the tender. The<br />
following <strong>specifications</strong> shall also be applicable. When the type of<br />
pointing is not mentioned in the item, groove pointing shall be done.<br />
At the center of the joints a ‘V’ shaped groove shall be made with its<br />
width and depth equal to half the thickness of the joint.<br />
20.3 Raking out joints:<br />
20.4 Colour:<br />
Where the joints have not been raked out when the mortar is green the<br />
joints shall be chipped to the required depth (without damaging the<br />
brick work or stone masonry) thoroughly cleaned of all loose particles<br />
and washed before pointing is done. The raked joints shall be kept<br />
damp when cement mortar is being applied to them.<br />
If color is ordered by the Engineer to be added to the mortar to match<br />
the colour of stones, approved pigment of the required colour shall be<br />
added to the cement in the mortar.<br />
20.5 Item to Include:<br />
Cement pointing shall include erecting and removal of scaffolding, all<br />
labour, materials and equipment incidental to complete the pointing,
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 431<br />
dewatering if necessary till the mortar is set unless separately provided<br />
for, raking out joints, cleaning, wetting, filling with mortar, trowelling,<br />
pointing with nayla and watering. The rate shall include any colouring<br />
pigment used.<br />
20.6 Mode of measurement:<br />
The contract rate shall be measured as per square metre.<br />
21.0 Providing vent holes in the slab and wearing course with iron grill at the<br />
21.1 General:<br />
top and galvanized iron pipe at bottom as per drawing.<br />
The item shall be carried out according to the detailed drawings. The<br />
holes shall be located as shown on the drawings or as ordered by the<br />
Engineer.<br />
21.2 Materials:<br />
1) Galvanised iron pipe 150mm (about 6”) diameter of required<br />
lengths.<br />
2) Grill and mild steel plates 6mm (about ¼”) thick, cut and welded<br />
as indicated on the drawings. It shall be welded to the pipe.<br />
Both combined shall be of such length as to be just flush with the top of<br />
<strong>road</strong> slab and bottom of deck slab.<br />
21.3 Construction:<br />
The 150mm (about 6”) diameter galvanized iron pipe shall be placed<br />
during the concreting of the deck slab and allowed to project for the<br />
required length over the deck slab so that the top of the grill shall be<br />
level with the finished wearing surface.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 432<br />
The edge of the exposed surface of the grill plates shall be neatly<br />
ground or filed flush with the wearing surface so that the wheels of<br />
vehicles shall not be injured.<br />
21.4 Item to Include:<br />
1) Galvanised iron pipes.<br />
2) Grills of mild steel flats or plates welded to the pipes.<br />
3) Fixing of galvanized iron pipes and grill.<br />
4) All labour, materials, use of equipment, tools etc. necessary for<br />
the satisfactory completion of the item.<br />
21.5 Mode of measurement and payment:<br />
The contract rate shall be for one vent hole provided. Measurement<br />
shall be for the number of such vent holes fixed on the bridge.<br />
22.0 BRICK MASONRY WORK<br />
a) Materials<br />
Bricks - Bricks to be whole, sound, well burnt, free from cracks to<br />
ring when struck and not to crack or break when soaked in water<br />
or thrown on the ground on their flat face in a saturated condition<br />
from a height of 60 cm, regular in shape and uniform size. They<br />
shall be of the best description obtainable in market and of the<br />
best quality and colour. They shall not absorb water more than<br />
20 per cent of dry weight when immersed in water for 24 hours.<br />
They shall have a crushing strength of not less than 35 kg./cm.<br />
i) Cement - Cement shall conform to the specification detailed in<br />
Clause No.88.<br />
ii) Sand - Sand shall conform to the <strong>specifications</strong> detailed in Clause<br />
No.88.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 433<br />
b) Cement Mortar<br />
All cement mortar to be used on this work shall be in proportion<br />
as specified and directed by the Engineer. The ingredient shall be<br />
measured dry, be means of properly made gauge boxes on a<br />
covered platform and shall be thoroughly mixed dry before<br />
adding water to get the required consistency. Only such quantity<br />
of mortar shall be prepared at a time as can be used up<br />
immediately. Mortar after it has begun to set, shall not be<br />
allowed to be raked up again, but shall be rejected and the<br />
contractors shall removes the same from the work site<br />
immediately.<br />
c) Workmanship<br />
This brick work shall be carried out in a workman like manner and<br />
in perfect plumb, line and level as required. Brick shall be<br />
thoroughly cleaned, well watered or soaked in water for atleast 12<br />
hours before being used on the work. No broken bricks shall be<br />
permitted to be used except as closers. Good bond shall be<br />
preserved throughout the work both laterally and transversely.<br />
All bed joints shall be horizontal in vertical walls, radial in arches<br />
and at right angles for the slopes in battered walls. In walling, the<br />
courses shall be kept perfectly horizontal and rise in plumb. The<br />
vertical joints shall break joints with the course below and above.<br />
Use of bats shall be avoided as far as practicable. The joint shall<br />
be close and regular and shall not exceed 12mm in thickness.<br />
The bond shall be English Bond unless otherwise permitted by the<br />
Engineer. The contractor shall provide at their own expense all<br />
moulds, tamplates, centres, scaffolding etc. as may be required for<br />
the proper execution of the work and nothing extra will be paid for<br />
the same.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 434<br />
The mortar used should be stiff. The brick work shall be kept wet<br />
while the work is in progress for atleast seven days after<br />
completion, to the entire satisfaction of the Engineer. On Sundays<br />
and Holidays, when the work is not in progress, the masonry shall<br />
be watered continuously by engaging Bhisties. Watering shall be<br />
done carefully so as not to wash out mortar of the joints. The<br />
Engineer shall be at liberty to engage labours at contractor’s cost<br />
to water the work, should the Contractors fail to do so. Should the<br />
mortar perish i.e. become dry, while or powdery, through neglect<br />
in watering, the work shall be pulled down and rebuilt at<br />
contractor’s cost.<br />
The whole of the masonry work shall be carried up at one uniform<br />
level throughout but where breaks are unavoidable, the joint shall<br />
be made in good long steps, raked so as to prevent cracks arising<br />
due to separation of old and new work. All junctions of walls shall<br />
be formed at the time the walls are being built and cross walls<br />
shall be carefully bonded into the main walls.<br />
When new work is to be added to existing structing, the old work<br />
must be prepared to receive new work by roughening and<br />
grouting with a layer of rich mortar and both be carefully bonded<br />
together.<br />
During the rains the <strong>works</strong> to be carefully covered without extra<br />
charge so as to avoid mortar being washed away.<br />
d) Colouring of Brick<br />
For colouring bricks, an earthern-ware box shall be provided a<br />
few cm longer each way than a common brick, and half filled<br />
with the liquid of the required description to about the consistency
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 435<br />
of thick crean. The brick to be coloured shall be laid on the iron-<br />
plate with a fire underneath and heated to a heat not too great to<br />
admit of their being handled. They are to be taken out one at a<br />
time and dipped into the liquid for a few seconds, and then placed<br />
on a table to dry (which they do in a few minutes). When dry, they<br />
are to be lightly washed in cold water and placed aside to dry<br />
agains. The material for the colouring liquid shall be linseed oil,<br />
turpentine and litharage with the proper colouring matter unless<br />
otherwise specified.<br />
Where yellow bricks are required, either Naosari yellow bricks or<br />
fire bricks of uniform colour shall be used.<br />
22.1 MODE OF MEASUREMENT & PAYMENT :<br />
The contract rate shall be for a unit of one cubic metre of Brick<br />
Masonry Work. The Brick Masonry Work shall be measured for its<br />
length, breadth and depth, limiting dimensions to those specified on<br />
the plan or as ordered by the Engineer. Individual dimension shall be<br />
measured correct to one cubic metre and quantities shall be worked<br />
out correct up to three places of decimals of a cubic metre.<br />
e) Cement Plaster to Brick Work<br />
Cement plaster shall be provided to brick masonry or rubble<br />
masonry wherever directed by the Engineer.<br />
1. Materials<br />
i) Cement<br />
Cement shall conform to the <strong>specifications</strong> detailed in<br />
Clause No.88
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 436<br />
ii) Sand<br />
Sand shall be conform to the <strong>specifications</strong> detailed in<br />
Clause No.88<br />
2. Cement Mortar<br />
All cement mortar to be used on this work shall be in proportion<br />
as specified and directed. The ingredient shall be measured dry,<br />
by means of properly made gauge boxes, on a covered platform<br />
and shall be thoroughly mixed dry before adding water to get<br />
the required consistency. Only such quantity of mortar shall be<br />
prepared at a time as can be used up immediately. Mortar,<br />
after it has begun to set, shall not be allowed to be raked up<br />
again, but shall be removed from the work site immediately.<br />
Cement mortar shall be used within 30 minutes after if leaves<br />
the mixing board or mill.<br />
3. Workmanship<br />
All stone or brick masonry shall be thoroughly wetted and joints<br />
raked to a depth of 12mm and walls washed.<br />
f) Pointing to Brick Work<br />
The whole of the exposed faces of brick work, cut-stone work and<br />
stone-paving when described as to be pointed are to have the joint<br />
raked out to a depth of a 13mm and pointed with cement and sand<br />
(unless otherwise described) in the proportion of one of cement to one<br />
fine sand flush with the face of the work and out straight, parallel and<br />
of uniform width.<br />
The exposed faces of the rubble work are to be similarly pointed (When<br />
described as to be pointed) but the joints shall be raked out to a depth<br />
of 20mm and shall be irregular in direction.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 437<br />
The above description of pointing shall apply generally to all classes<br />
except only as the pointing material which may in certain cases to be<br />
otherwise described in this specification.<br />
g) Bonding of old work with new work<br />
Wherever any new work meets the old, certain portions of the old work<br />
as may be ordered by the Engineer, shall be cut away in order that the<br />
new work may be properly bonded into the old. No payment will be<br />
allowed to the Contractors for cutting away any portion of the work<br />
done under this contract for the purpose of other similar work, or in<br />
such case for bonding and making good the same as above described.<br />
h) Cutting holes in new work<br />
Wherever any hole or other communication has to be cut into the wall<br />
or made with a drain or a sewer or a manhole or into or with other<br />
masonry, the hole or communication shall be cut or made neatly to the<br />
requisite size and pipe, tail piece, elbow or other article or work for<br />
which it is required shall be neatly and soundly stopped around with, or<br />
built in cement and sand (1 to 1). The rate of cutting the hole or that<br />
for the work for which the communication is required shall include the<br />
cost of such stopping, that of any making good that may be required<br />
and also that of any arrangements which the contractors may have to<br />
make in order to stop the access of sewage or water during the<br />
execution of their work. No payment will be allowed to the Contractors<br />
for cutting out any portion of the new work for the purpose of other<br />
work under this contract, or in such case stopping and making good as<br />
above described. If the sewer or the drain into which hole or<br />
communication is to be cut is in a working condition and if there is<br />
likely hood of the workman being exposed to the danger arising from
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 438<br />
these wage gases, such work and also that of removing such stop or<br />
plug shall be done by the <strong>CIDCO</strong> staff trained for such work and under<br />
the supervision of a responsible officer as may be directed by the<br />
Engineer and the cost of such work will be borne by the Contractor.<br />
i) Protection of Work from Sun<br />
All cement work, pointing plastering and concrete work shall be shaded<br />
from the sun, and surface kept mostaned until, in the opinion of the<br />
Engineer it is thoroughly set.<br />
Definition of Incomplete Work<br />
A line or stretch of pipe sewer (including the excavation thereof and all<br />
other accessories thereto) will be considered incomplete unless entirely<br />
laid jointed and fully tested, encased wherever required the trenches<br />
filled and consolidated, and the manhole at each and completely<br />
finished with floors, channels cover and all other detail. A manhole will<br />
be considered incomplete unless it is completely finished as above, and<br />
at least one of the lines of pipe sewer to which it belongs or it attached,<br />
is complete as described above.<br />
The Contractors shall have no claim for incomplete work and no<br />
incomplete work will be measured up for payment to the Contractors.<br />
22.2 MEASUREMENT FOR TRANSPORT OF RUBBLES<br />
Serviceable rock will be permitted to be used for refilling trenches.<br />
The measurement for the items of transport of rubble to specified<br />
distance will be either by lorry measurements or depot measurement as<br />
directed without deducting anything in quantities in excess of the<br />
calculated surplus material to be removed as per excavation item.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 439<br />
22.3 CONTRACTOR TO OBSERVE ALL CONDITIONS<br />
The contractors are <strong>particular</strong>ly directed to observe from the Articles of<br />
Agreement and the Specification what is to be included in their rate for<br />
the several portions of the work and also under what conditions<br />
payments are to be made.<br />
23.0 Dewatering including diversion of stream, providing cofferdams, bunds<br />
etc. as may be necessary for foundation and other parts of the work<br />
and bailing out and pumping out water during and after excavation as<br />
required.<br />
23.1 General:<br />
23.2 Method:<br />
The foundation trenches shall be kept dry by resort to pumping alone<br />
or pumping in combination with diversion channels, cofferdams,<br />
bunds, diversion weirs, drainage channels, well points or any other<br />
satisfactory method to suit local conditions at the choice of the<br />
contractor. The contractor shall supply details of his proposals for<br />
approval of the Engineer, but such approval shall in no way release the<br />
contractor from the responsibility for the adequacy of diversion and<br />
dewatering arrangements and for the quality and safety of the work, for<br />
all of which the contractor shall be solely responsible.<br />
The method to be adopted shall be entirely left to the choice of the<br />
contractor provided adequate dewatering is carried out and the<br />
scheduled programme is adhered to. The contractor shall plan,<br />
construct and maintain satisfactorily necessary diversion channels and<br />
temporary diversion and protective <strong>works</strong> so as to safely pass the<br />
stream flow and also satisfactorily deal with any sudden rise of flow
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 440<br />
23.3 Pumping:<br />
without damaging the foundation excavation or <strong>works</strong>. Where<br />
practicable, all substructures shall be constructed in open excavation<br />
and where necessary the excavation shall be shored and braced or<br />
protected by cofferdams. The cofferdam should be carried to adequate<br />
depts. And heights, safely designed and constructed with suitable<br />
dimensions and protection and shall be made as water-tight as<br />
practicable for facility of construction of the work to be done inside<br />
them. The interior dimensions of the cofferdams shall be such as to<br />
give sufficient clearance for the construction and inspection and to<br />
permit installation of pumping machinery etc. inside the enclosed area.<br />
The cofferdams shall be sufficient heights to prevent ingress of water<br />
into the foundation pits and to protect green concrete or masonry<br />
against damage from tides or sudden rising of the steam and to<br />
prevent damage of the foundation by erosion.<br />
Unless otherwise permitted, no excavation shall be made outside the<br />
enclosed area and the natural stream bed adjacent to the foundation<br />
shall not be disturbed without permission from the Engineer.<br />
Cement grouting or other approved methods may be used at the<br />
discretion of the contractor to prevent or reduce seepage and to protect<br />
the area to be excavated if the soil is porous.<br />
Adequate pumping arrangements shall be made for dewatering<br />
foundation trenches and other areas of construction where dewatering<br />
is essential and keeping them dry while masonry or concrete or other<br />
construction is in progress and till the concrete or mortar of masonry<br />
has sufficiently set and construction can be proceeded without<br />
pumping.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 441<br />
Pumping of adequate capacity and in required numbers shall be<br />
provided to ensure the above. Pumping from the foundation trenches<br />
or from the interior of the cofferdam or other areas of construction shall<br />
be done in such a manner as to preclude the possibility of the<br />
movement of water through any fresh concrete or masonry and<br />
washing away parts of concrete or mortar. No pumping will be allowed<br />
during placing of concrete or for a period of at least 24 hours<br />
thereafter unless it is done from suitable sump separated from concrete<br />
or masonry by effective means.<br />
The contractor should make his own arrangement for necessary labour,<br />
materials and equipment for cofferdams, pumps, engines and other<br />
machinery and devices required for successful execution of the item of<br />
dewatering.<br />
23.4 Desilting:<br />
23.5 Removal:<br />
If any foundation pits are filled due to floods or flow or blows or slips<br />
during the progress of the work or during the rainy season or due to<br />
any other cause, all pumping required to dewater the pits and to do<br />
desilting shall be done without making extra claims.<br />
The cofferdams and other <strong>works</strong> constructed from facility of diversion<br />
and/or dewatering shall not cause any damage to property and work<br />
and shall be removed after they have served their purpose in a manner<br />
and to the extent directed by the Engineer. If any excavation is made<br />
outside the enclosed area for facility of construction, the contractor<br />
shall refill the same with proper ramming after the foundation work is<br />
completed so as to bring the river bed to its original condition of and<br />
as directed by the Engineer. Similarly any material deposited within the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 442<br />
stream area from the filling of the cofferdam or from any excavation<br />
shall be removed and the stream area made free from obstruction<br />
caused thereby as directed by the Engineer.<br />
23.6 Item to include:<br />
1) All labour, materials, use of equipment and other arrangement<br />
necessary for dewatering during excavation and construction of<br />
other items requiring dewatering.<br />
2) Dewatering foundation trenches, excavation and other areas to<br />
be built upon to enable the masonry, concrete or other<br />
construction work to be done in the dry and till the Engineer<br />
considers that the mortar or concrete has sufficiently set.<br />
3) Dewatering all the items requiring dewatering are fully<br />
completed. This shall also include time required for passing<br />
foundations and taking measurements of all the items requiring<br />
dewatering.<br />
4) Removing liquid stuff of any sort which might find access into the<br />
trenches by blowing, slip or any other cause what-so-ever from<br />
the sides or bottom of the foundation or excavation or from<br />
elsewhere during or after dewatering.<br />
23.7 Mode of measurement and payment:<br />
The contract rate shall be per hours of pumping.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 443<br />
TECHNICAL SPECIFICATIONS<br />
(SEWERAGE WORK)<br />
I Manufacturing of R.C.C. pipe<br />
NP2 & NP3<br />
Pipes (NP2 or NP3 class) : Manufacturing of pipe as per IS 458 with<br />
the latest amendments as per Clause 6<br />
with amendment, casting pipe by<br />
spinning, vibrating the concrete method.<br />
Flexible Rubber joints like pipe socket –<br />
spigot shall provided.<br />
1) Cement : As per IS 8041, IS 8043 and IS 8112 a<br />
latest version for the manufacturer of<br />
concrete pipes.<br />
2) Steel wire fabric : i) Mild steel grade –I, as per IS : 432<br />
Part –I & II structural steel as per IS :<br />
2062.<br />
3) Class of pipe NP2<br />
(Rubber Ring Roll on Joint)<br />
NP3<br />
(Rubber Ring Roll on joint)<br />
: ii) As per IS 1566 and IS 1786 and IS<br />
226 of latest amendments.<br />
: Spigot and socket as per Table No.9 of IS<br />
code 458 with latest amendments and<br />
design as per Table No.2 with<br />
amendments.<br />
: Spigot and socket as per Table No.10 and<br />
10A of IS code 458 with latest<br />
amendment. Design as per Table No.3<br />
with amendments. Barrel thickness design<br />
should be approved before taking work of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 444<br />
manufacturing the pipe. For NP3 class<br />
pipes.<br />
4) Aggregates : Aggregates used as per IS 383 latest<br />
version and as per Clause No.4.3 of IS<br />
458-1988 with amendment No. 2<br />
5) Concrete : Pipe concrete should conforming to IS:456<br />
– 1978 code of practice for plain and RCC<br />
(fourth revision) as per clause No.4.5 with<br />
latest amendment.<br />
6) Water : As per IS 456-2000.<br />
7) Testing at factory : Contractor has to make arrangement of<br />
testing of pipe at factory before supply at<br />
site, Sampling as per IS code as per IS<br />
458 clause 9 with latest amendment/ cube<br />
test are as per IS 516-1959 and IS 5816-<br />
1999 at factory.<br />
Test are :<br />
i) Hydrostatic test as per IS 3599-1998.<br />
ii) Three edge bearing test as per IS<br />
3599-1998.<br />
iii) Permeability test as per IS 3597-<br />
1998.<br />
vi) Absorption test as per IS 3599-1998.<br />
v) Straightness test as per IS 3599-1998.<br />
Sampling and inspection should be as per<br />
clause No.10 of 458 with amendment.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 445<br />
8) Marking on pipes : i) Name of manufacturer with register<br />
trademark.<br />
ii) Class of pipe<br />
iii) Date of manufacturer<br />
iv) ISI mark<br />
II Rubber Rings : Rubber ring chords used for pipes joints<br />
shall conform to IS:5382-1967 with<br />
amendment. Gasket shall be made of a<br />
properly vulcanized virgin rubber<br />
compound of containing no scrap or<br />
reclaim.<br />
Tests : i) Hardness Test as per IS : 3400<br />
Sampling the time lapse for<br />
testing, Marking on Rings<br />
ii) Tensile Test of Ring as per IS :3400<br />
iii) Compression Test as per IS:3400<br />
iv) Accelerated ageing in air as per<br />
IS:3400<br />
v) Water absorption Test as per IS 3400.<br />
: As per IS code 5382 class 6 clause 7 with<br />
appendix - D<br />
i) The manufacturers name and Trade<br />
mark if any.<br />
ii) Month and year of manufacturer.<br />
iii) The type follower by a word such Gas<br />
or Water or Sewer depending on the<br />
applications.<br />
iv) ISI mark.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 446<br />
III Manholes : As per IS : 411 (Part –I) 1986 and as per<br />
drawing issued by <strong>CIDCO</strong> for execution<br />
purpose and as directed by Engineer.<br />
Type / spacing of manholes<br />
and construction of manholes.<br />
: As per <strong>CIDCO</strong> drawing and schedule of<br />
Rate.<br />
IV Steps : As per Schedule of item and drawing note.<br />
As per IS:5455-1969.<br />
Load Test : One sample of step of 50 samples may be<br />
Marking : ISI mark<br />
V Precast Concrete Manhole<br />
cover and frame<br />
subjected to load test as per Appendix A.<br />
Manufacturer Name<br />
: As per Tender Schedule and Drawing and<br />
IS Code 12592-2002.<br />
i) Grade and Type : Heavy duty HD 20 Rectangular or<br />
Circular.<br />
ii) Cement : IS-269, IS:455, IS-8043, IS-8112<br />
iii) Aggregates IS 383<br />
iv) Concrete : IS : 456- 2000 M-30 Grade.<br />
v) Steel : As per IS 4.4 of IS:12592.<br />
vi) Test : Load test as per clause o.9.3 of IS:12592.<br />
: Sampling and / or testing should be done
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 447<br />
in accordance with Clause No.11 of<br />
IS:12592.<br />
vii) Marking : ISI mark, BIS Mark.<br />
VI Laying of Sewer Line : As per Schedule of rate of Tender and<br />
Particular Specifications and IS Code 783.<br />
Width of excavation is as per Particular<br />
Specification.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 448<br />
1.0 SCOPE OF WORK<br />
PARTICULAR SPECIFICATIONS<br />
SEWERAGE WORK<br />
This specification is intended to provide generally for the following<br />
<strong>works</strong> viz.<br />
a) Construction of sewer,<br />
b) Construction of manholes on sewer,<br />
c) Erection of ventshafts,<br />
d) Such other work or <strong>works</strong> incidental to the construction of<br />
the sewer.<br />
2.0 DATUM FOR LEVEL<br />
All levels referred to in connection with these <strong>works</strong> are based on the<br />
plane known as G.T.S.<br />
3.0 EXCAVATION<br />
3.1 The total excavation will be classified and paid for under two heads<br />
only, viz. (a) General excavation to include excavation in <strong>road</strong><br />
surfaces of every description together with their foundation, clay,<br />
loose sand stone, murum, boulders, sand, lime, cement masonry<br />
and all other materials of whatever description not requiring to be<br />
blasted.<br />
3.2 Rock excavation (Definition of Rock)<br />
Rock excavation to compromise excavation in rock, big boulders<br />
more than 0.5 cubic metre in volume very hard sand stone or literal<br />
concrete, requiring to be blasted by an explosive or burst out in<br />
small pieces by iron wedges or chisels.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 449<br />
3.3 Class of excavation to be determined<br />
3.4 Trial holes<br />
In case of any question arising as to the class of excavation, the<br />
Engineer shall determine (subject to the Chief Engineer's decision in<br />
case of dispute by the Contractor) under which category, and to<br />
what extent, any <strong>particular</strong> excavation shall be classified.<br />
Trial holes/pits of such sizes and depths and such position as may be<br />
necessary or directed by the Engineer shall be dug and subsequently<br />
made good as may be ordered by and to the satisfaction of the<br />
Engineer.<br />
Trial holes/pits shall be allowed for in the rates for excavation and<br />
sufficient trial holes must be dug to accurately locate and determine<br />
the positions of service, culverts, and obstructions in advance of the<br />
main excavation.<br />
In all cases the trial pits are to be excavated in accordance with the<br />
<strong>specifications</strong> for excavation, refilling and reinstatement etc.<br />
3.5 Excessive excavation<br />
After excavating the sites on which the various parts of the <strong>works</strong> are<br />
to be constructed, if it is found that due to no fault of the contractor<br />
and part of the formation is unsuitable to provide a satisfactory<br />
foundation, such portions shall be further excavated to such depths<br />
as the Engineer may direct, and refilled to original formation level<br />
with mass concrete M-100 or hardcore of quarry waste as may be<br />
directed. Payment will be made for such additional excavation and<br />
filling at appropriate rates.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 450<br />
3.6 Widths of excavation for different diametre of pipes<br />
a) The width of excavation for a built up drain or sewer unless<br />
otherwise stated will be calculated to 250 mm on either side of the<br />
extreme edge of the footings and the depth upto the bottom of<br />
foundation. In case of pipes of different diametres and manholes<br />
the width of the trenches will, unless otherwise directed by the<br />
Engineer in writing, be paid for as mentioned in the table below.<br />
This width shall include the extra width required for shoring in one or<br />
more stages and working space required for construction brick<br />
masonry or plastering the same for laying and jointing of the pipes<br />
or any other purpose in connection with the excavation of the work.<br />
b) Where rock is met with unless otherwise determined by the Engineer,<br />
the width of the trench below the point at which the rock is met, shall<br />
be calculated as shown in the accompanying table, irrespective of<br />
the depth of the trench. In case of built up drains this shall be<br />
calculated to 75 mm on either side of the extreme edge of the<br />
footings.<br />
c) Statement showing widths to be given for excavation for either 1.20<br />
M. or 1.50 M. (Inside) Circular or 1.50 M. x 1.50 M. square<br />
manholes in sewerage <strong>works</strong>.<br />
Depth of Manhole<br />
Upto invert level<br />
1) For 1.20 M. dia. M.H.<br />
upto 2.30 M.<br />
Size of excavation Remarks<br />
2.50 M. Square Without drop<br />
arrangement<br />
For 1.50 M. dia. M.H. 3.0 M. Square -- do --<br />
For 2.30 M. to 5.00 M. 3.5 M. x 3.00 M. With drop arrangement<br />
on both sides.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 451<br />
Depth of Manhole<br />
Upto invert level<br />
Size of excavation<br />
A. Without drop arrangement<br />
Remarks<br />
Above 5.00 M. I - In ordinary soil<br />
3.4 M. Square 1st stage upto 5.00 M.<br />
3.0 M. Square 2nd stage below 5.0 M.<br />
II - In trenches where rock is met with<br />
3.4 M. Square Upto the point where rock<br />
is met with<br />
3.0 M. Square Below the point where<br />
rock is met with<br />
B. With drop arrangement on both sides<br />
I - In ordinary soil<br />
Across Along<br />
3.8 M. x 3.4 M. 1st stage upto 5.00 M.<br />
3.5 M. x 3.0 M. 2nd stage below 5.0 M.<br />
II - In trenches where rock is met<br />
3.8 M. x 3.4 M. Upto the point where rock<br />
is met with<br />
3.5 M. x 3.0 M. Below the point where<br />
rock is met with<br />
d) Statement showing widths to be given for excavation for 1.8 M. dia.<br />
circular manholes and 1.50 M. scraper type manholes.<br />
A - Without drop arrangement :<br />
I - In ordinary soil<br />
3.70 M. square 1 st stage upto 5.0 M.<br />
3.40 M. square 2 nd stage below 5.0 M.<br />
II - In trenches where rock is met with :<br />
3.70 M sq. upto the point where the rock is met with<br />
3.40 M sq. below the point where the rock is met with<br />
B - With drop arrangement on both sides :<br />
I - In ordinary soil : Across and along :<br />
4.10 M x 3.70 M 1 st stage upto 5.0 M<br />
3.80 M x 3.4 M 2 nd stage below 5.0 M
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 452<br />
II - In trenches where rock is met with<br />
4.10 M x 3.70 M upto the point where the rock is met<br />
with<br />
3.8 M x 3.4 M below the point where the rock is met<br />
with<br />
NOTE : 1) If the drop arrangement is provided only on one side the width<br />
given above for manholes with drop arrangement shall be reduced<br />
by 0.2 M across the trench.<br />
2) The size of the manhole etc. mentioned above are approximately<br />
rounded figures. Marginal variations in the sizes of manhole covers<br />
are acceptable.<br />
3) Statement showing widths to be given for excavation for 1.80 M x<br />
2.40 M scraper type manholes.<br />
A - Without drop arrangement<br />
I - Ordinary soil<br />
3.70 M x 4.30 M rectangular 1st stage below 5 M<br />
3.4 M x 4.00 M rectangular 2 nd stage below 5.0 M<br />
II - In trenches where the rock is met with :<br />
3.70 M x 4.30 M rectangular upto the point where the rock is met<br />
with<br />
3.40 M x 4.00 M rectangular below the point where the rock is met<br />
with<br />
B - With drop arrangement on both sides 1.80 M length<br />
I - In ordinary soil : across and along<br />
4.10 M x 4.30 M 1st stage below 5.0 M<br />
3.80 M x 4.00 M 2 nd stage below 5.0 M
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 453<br />
II - Trenches where the rock is met with :<br />
4.10 M x 4.30 M upto the point where the rock is met with<br />
3.80 M x 4.00 M below the point where the rock is met with<br />
Statement showing the proposed widths to be given for excavation of Trenches<br />
and paid for in Sewerage <strong>works</strong> :<br />
SIZE OF PIPE<br />
Excavation in Ordinary soil<br />
Shoring in one<br />
stage<br />
Upto<br />
3 M<br />
depth<br />
Above 3<br />
M & upto<br />
5 M<br />
depth<br />
Shoring in two stage<br />
more than<br />
5 M<br />
depth<br />
Excavation in rock<br />
wherever it is met with<br />
Shoring<br />
in one<br />
stage<br />
upto 5 M<br />
depth<br />
Shoring in<br />
two stages<br />
More than<br />
5 M depth<br />
150mm S.W. 0.80 M 0.90 M<br />
230mm S.W. 0.90 M 1.00 M 1.4 M upto 5 M<br />
1.0 M below 5 M<br />
0.90 M 1.00 M<br />
300mm S.W. 0.90 M 1.00 M 1.4 M upto 5 M<br />
1.0 M below 5 M<br />
0.90 M 1.0 M<br />
350mm R.C. pipe 1.30 M 1.50 M 1.8 M upto 5 M<br />
1.5 M below 5 M<br />
1.5 M below 5 M<br />
1.30 M 1.50 M<br />
400mm R.C. pipe 1.40 M 1.60 M 1.9 M upto 5 M<br />
1.6 M below 5 M<br />
1.40 M 1.60 M<br />
450mm R.C. pipe 1.50 M 1.70 M 2.0 M upto 5 M<br />
1.7 M below 5 M<br />
1.7 M below 5 M<br />
1.50 M 1.70 M<br />
500mm R.C. pipe 1.50 M 1.70 M 2.0 M upto 5 M<br />
1.70 M below 5 M<br />
1.50 M 1.70 M<br />
600mm R.C. pipe 1.60 M 1.80 M 2.10 M upto 5 M<br />
1.80 M below 5 M<br />
1.60 M 1.80 M<br />
700mm R.C. pipe 1.70 M 1.90 M 2.20 M upto 5 M 1.70 M 1.90 M<br />
1.90 M<br />
1.90 M below 5 M<br />
800mm R.C. pipe 2.00 M 2.30 M. 2.60 M upto 5 M<br />
2.30 M below 5 M<br />
2.00 M 2.30 M<br />
900mm R.C. pipe 2.10 M 2.40 M 2.70 M upto 5 M<br />
2.40 M below 5 M<br />
2.10 M 2.40 M
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 454<br />
SIZE OF PIPE<br />
Excavation in Ordinary soil<br />
Shoring in one<br />
stage<br />
Upto<br />
3 M<br />
depth<br />
Above 3<br />
M & upto<br />
5 M<br />
depth<br />
Shoring in two stage<br />
more than<br />
5 M<br />
depth<br />
Excavation in rock<br />
wherever it is met with<br />
Shoring<br />
in one<br />
stage<br />
upto 5 M<br />
depth<br />
Shoring in<br />
two stages<br />
More than<br />
5 M depth<br />
1000mm R.C. pipe 2.20 M 2.50 M 2.80 M upto 5 M<br />
2.50 M below 5 M<br />
2.20 M 2.50 M<br />
1100mm R.C. pipe 2.30 M 2.60 M 2.90 M upto 5 M 2.30 M 2.60 M<br />
2.60 M below 5 M<br />
1200mm R.C. pipe 2.40 M 2.70 M 3.00 M upto 5 M 2.40 M 2.70 M<br />
2.70 M below 5 M<br />
1400mm R.C. pipe 2.70 M 3.00 M 3.30 M upto 5 M 2.70 M 3.00 M<br />
3.00 M below 5 M<br />
1600mm R.C. pipe 2.90 M 3.20 M 3.50 M upto 5 M 2.90 M 3.20 M<br />
3.20 M below 5 M<br />
1800mm R.C. pipe 3.10 M 3.40 M 3.70 M upto 5 M 3.10 M 3.40 M<br />
3.40 M below 5 M<br />
4.0 DEPTH OF EXCAVATION OF TRENCHES<br />
The depth for the trenches will be calculated from the surface to the<br />
bed of the pipes and in case when a layer of concrete/or precast<br />
blocks are required to be placed below the pipeline, the depth of the<br />
bottom of the concrete/or the block below the underside of the<br />
pipeline will be paid.<br />
The depth of excavation for manhole shall be measured from the<br />
surface of the existing ground level to the bottom of foundation.<br />
No payment will be made for any excavation beyond this width or<br />
depth.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 455<br />
5.0 MEASUREMENT LENGTH OF EXCAVATION<br />
The lengths of excavation for trenches will be measured from and<br />
clear of the settled width allowed for the excavation of trench from<br />
which it starts on which it come into contact and the centre of the<br />
pipe or masonry for which the trench has been excavated shall be<br />
considered as the centre of such trench.<br />
6.0 A GRIP TO BE CUT WHERE PIPE SOCKET OCCURS<br />
Wherever a pipe socket occurs a grip is to be cut in the bottom of the<br />
trench or concrete bed to a depth of atleast 75 mm below the bed of<br />
the pipe so that the pipe may have a fair bearing on its shaft and to<br />
rest upon its socket. Such grip shall be of sufficient size in every<br />
respect to admit the hand all around the socket in order to make the<br />
joint, and the grip shall be maintained clear until the joint has been<br />
passed by the Engineer.<br />
7.0 TRENCHES IN ROCKY GROUNDS<br />
The trenches for pipe drains, if in stony or rocky ground, are to be<br />
excavated all along to the full depth of 75 mm below the intended<br />
level of the bed of the pipes to be laid therein, and layer of soft<br />
clean earth 75 mm thick is to be deposited for the reception of the<br />
pipes and in case where a layer of the concrete and/or precast block<br />
is required to be placed below the pipe line, the bottom of the<br />
excavation shall not be higher at any point than the bottom of the<br />
concrete layer or block.<br />
Wherever excavation is done in rock, the excavated stuff shall be<br />
stacked separately for chiselled rock and blasted rock. The<br />
excavation shall be paid or stack measurement with deduction of<br />
40% for voids to be made from the stack measurement.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 456<br />
8.0 CARRYING OUT EXCAVATION AND STACKING THE EXCAVATED<br />
STUFF<br />
a) In carrying out excavation, ground shall be broken at such places<br />
and in such lengths as shall be sanctioned by the Engineer. Work of<br />
excavation shall proceed in such proportion at one time as the<br />
Engineer may direct, and no permanent <strong>works</strong> shall be begun, until<br />
the Engineers have approve of the excavation which shall be out to a<br />
sufficient depth and width to receive the permanent work and to<br />
allow of their being sufficiently placed, built, constructed, laid or<br />
erected. The length of trench excavated ahead of the pipe laying<br />
and the length of trench which may remain open at one time shall at<br />
all times be subject to the approval of the Engineer. It shall be at no<br />
time greater than can properly be protected from caving.<br />
b) The <strong>road</strong> metal and also the rubble packing ad khankies (if any) first<br />
be stripped off for the whole width of the trench and for the whole<br />
extent of the masonry or chamber required and separately deposited<br />
in such place or places as may be determined upon by the Engineer.<br />
In case of the metal packing or khandkies not being so deposited or<br />
being mixed up with excavated materials and not available for<br />
refilling and making good the excavation the cost of the new metal,<br />
packing or khandkies required shall be charged to the Contractors.<br />
c) The other material from the excavation shall be deposited on either<br />
side of the trench leaving a clear berm on one side at least 40 cm<br />
wide or at such further distance from the edges of the trench as may<br />
be necessary to prevent the weight of materials from casting the side<br />
of the trench to slip or fall or at such a distance and in such a<br />
manner as to avoid covering fire hydrants sluice valves gas-syphone,<br />
manholes covers and the like and so as to avoid abutting any wall or<br />
structure or casing inconvenience to the public or other persons or<br />
otherwise as the Engineer may direct.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 457<br />
d) In case where the Engineer decides that the width of the <strong>road</strong> or lane<br />
where the work of excavation is to be carried out is so narrow as to<br />
warrant stacking or excavated material away from the site of the<br />
work the contractor shall have to remove the same if so directed<br />
within a lead of 250 M. The excavated stuff shall be brought back<br />
for refilling the trenches when required. The surplus material shall<br />
be removed as directed. No claims for stacking the excavated stuff<br />
away from the site of work or bringing it back for refilling trenches<br />
shall be entertained.<br />
9.0 FOUNDATION AND BOTTOM OF TRENCHES TO BE SATURATED<br />
WITH WATER<br />
All foundation and the bottom of all trenches shall be saturated with<br />
water well rammed wherever the Engineer may consider it necessary<br />
to do so.<br />
10.0 EXCESS EXCAVATION DUE TO NATURE OF SUB-SOIL FOR<br />
ADDITIONAL FOUNDATION<br />
If in any place the Engineer may consider that on account of the<br />
nature of sub-soil, additional foundations of concrete, rubble or<br />
otherwise are necessary or if in any place, he may require the<br />
excavation, for any purpose, whatsoever, to be carried deeper than<br />
shown on the plans or described in the specification, the excavation<br />
shall be carried out as may be ordered by the Engineer and such<br />
additional <strong>works</strong> shall be measured and paid for to the contractors<br />
according to the rates entered in the Bill of Quantities and Rates.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 458<br />
11.0 UNAUTHORISED EXCESS EXCAVATION<br />
Where excavation are made in excess of the limits delineated on the<br />
drawings, either by error or by accident, the voids so formed shall be<br />
filled in with lime concrete or rubble masonry or otherwise at the<br />
discretion and to the satisfaction of the Engineer and at the expense<br />
of the contractors.<br />
12.0 FENCING/LIGHTING AND WATCHING<br />
The contractor shall make all proper provisions for protecting the<br />
work be fences and by watching and lighting at night, or otherwise<br />
as may be directed by the Engineer. The posts of fencing shall be<br />
timber securely fixed in the ground not more than 3 M. apart, and<br />
they shall not be less than 75 mm in diametre or less than 1.2 M.<br />
above the surface of the ground. There shall be two rails, one near<br />
the top of the posts and the other about 450 mm above the surface<br />
of the ground and each shall be from 50 mm to 70 mm in diametre<br />
and sufficiently long to run from post to post, to which they shall be<br />
bound with strong rope. The method of projecting rails beyond the<br />
posts and tying them together where they meet will not be allowed<br />
on any account. All along the edges of the excavated trenches a<br />
bank of earth about 1.20 M. high shall be formed where required by<br />
the Engineer for further protection. Proper provisions shall be made<br />
for lighting at night and watchman shall be kept to see that this is<br />
properly done. In the event of the contractors not fully complying<br />
with the provisions of these clause, the Engineer may, with or without<br />
notice to the contractors, put up a fence or improve the fence<br />
already put up or provide or improve the lighting or adopt such<br />
measures as he may deem necessary and all the cost of such<br />
procedure as may be adopted by the Engineer, shall be borne by the<br />
contractors.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 459<br />
12.1 In addition to the normal lighting arrangements, the contractor shall<br />
provide, wherever a sewer work is in progress, battery operated<br />
blinking lights (6 volts) in the beginning and end of a trench with a<br />
view to provide suitable indication to the vehicular traffic. The<br />
contractor shall also provide and display special boards painted with<br />
fluorescent paints indicating the progress of the work along a<br />
<strong>particular</strong> <strong>road</strong>.<br />
13.0 MAINTENANCE OF WATER PIPES, GAS PIPES AND DRAINS, ETC.<br />
MET IN EXCAVATION<br />
The contractor shall, at the rates entered in the Bill of Quantities and<br />
Rates, excavate all such <strong>works</strong>, as the Engineer may requires in order<br />
to locate the position of water pipes, drains, sewers or any other<br />
work and all water pipes, gas pipes, drains, sewers or other work,<br />
which may be met up, in or about any excavation whatever, shall if<br />
the Engineer deem it practicable be properly maintained by the<br />
contractors, and by means of shoring, strutting, planking over,<br />
padding or otherwise as the Engineer may direct, shall be protected<br />
by the contractors from damage during the progress of the work or if<br />
damaged together with all matters and things resulting from the<br />
same, shall be made good and effectually remedied either by the<br />
contractors or by other agency, as the Engineer may decide and<br />
wholly in either case at the expense of the contractors. In the event<br />
of the failure on the part of the contractors to carry out to the<br />
satisfaction of the Engineer, any of the above protective provisions or<br />
to execute to his satisfaction of the Engineer, any of the above<br />
protective provisions or to execute to his satisfaction such remedial<br />
work, as he may decide that they shall do, the Engineer may, with or<br />
without notice to the contractors, adopt such measures as he may
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 460<br />
14.0 SHORING<br />
deem necessary at the expense and risk of the contractors. If,<br />
however, the Engineer considers impracticable for the contractors to<br />
maintain any such water pipes, gas pipes, drains, sewers or other<br />
<strong>works</strong>, and that exigencies of the work necessitate the breaking<br />
down, removal or diversion of any such water pipes, gas pipes,<br />
drains, sewers or other work, then, though the cost of breaking<br />
down or removing any such trench or sewers and of providing such<br />
chutes, pumps or other appliance, as the Engineer may direct for the<br />
raising and temporary passage of the water or sewerage which may<br />
escape from any such water pipes, gas pipes, drains, sewers or other<br />
work shall be borne by the contractors, yet the cost of breaking<br />
down and removing any such water pipes or gas pipes, and of<br />
rebuilding, replacing diverting or reinstating any such water pipes,<br />
gas pipes, drains, sewers or other <strong>works</strong>, as may be required by the<br />
Engineer shall be paid to the contractors as provided by the contract,<br />
if done by them, or the same or any part thereof may be carried out<br />
under the Engineer's orders by other agency and in such cases<br />
without charge to the contractors. The Engineer's opinion as to the<br />
amount of the charges, which under this clause are payable to the<br />
contractors, shall be final and binding on the contractor. It should<br />
be allowed for arbitration being non-technical matter.<br />
a) Wherever shoring may deemed necessary by the Engineer the<br />
contractor shall provide the same in the best possible manner with<br />
the best material and to the satisfaction of the Engineer. The<br />
contractor shall employ such kind or kinds of shoring as the<br />
Engineer may consider the exigencies of the work to require and it is<br />
to be distinctly understood that the work 'shoring' is to comprise all
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 461<br />
clauses of such work and all appliances and appurtenances<br />
including polling boards, sheet piling and runners (whether the joints<br />
be butt, groove and tongue feather edge and groove, birds mouth<br />
and double splay, rebated or otherwise), together with walling struts<br />
prope, point blank shores, raking shores, blocks, wedges, iron dogs,<br />
bolts, screws, nails and everything that may be required for due<br />
execution of the work.<br />
b) No part of the shoring shall at any time be removed by the<br />
contractor without obtaining permission from the Engineer. While<br />
taking out shoring plank the hollows if any, formed must<br />
simultaneously be filled in with soft earth well rammed with rammers<br />
and with water.<br />
c) Shoring left in trenches<br />
The Engineer may order portions of shoring to be left in the trenches<br />
at such places, where it is found absolutely necessary to do so as to<br />
avoid any damage which may be caused to building, cables, gas-<br />
mains, water mains, sewers etc. in close proximity of the excavation,<br />
by pulling out the shoring from the excavations. The contractors<br />
shall be paid at the rate inserted by them in the Schedule of Rates<br />
and Quantities or to be decided by the Engineer as per clause 22 of<br />
General Conditions, only by the order of Engineer, and they shall<br />
not claim, on any reason, whatsoever for the shoring which may<br />
have been left in by them at their own discretion.<br />
Any allowance for shoring left in the portions of rakers, struts, or<br />
other timber cut off and not permanently left in the work will not be<br />
included.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 462<br />
Any allowance for shoring such as plates struts or other timber cut<br />
off and not left permanently in any position of the trench will not be<br />
paid.<br />
d) Steel trench sheeting<br />
e) Rates<br />
i) Where the sub-soil conditions are expected to be of a soft and<br />
unstable character, in trench excavation the normal methods<br />
of timbering will probably prove insufficient to avoid<br />
subsidence of the adjoining <strong>road</strong> surface and other services.<br />
The contractor will be held responsible for all such damages<br />
as specified elsewhere.<br />
ii) In such circumstances, the contractor will be required to use<br />
steel trench sheeting or sheet steel piling adequately<br />
supported by timber struts walling etc. The contractor will be<br />
expected to supply pitch, drive and subsequently remove<br />
trench sheeting or piling in accordance with other items of the<br />
<strong>specifications</strong> and the terms Timber or Timbering shall apply<br />
to steel trench sheeting or sheet steel piling throughout.<br />
The rates for excavation shall be held to include the cost of shoring<br />
and no allowance of width or width beyond those already described<br />
shall be made on account of the necessity of shoring.<br />
f) Engineer may put up or improve shoring<br />
In the event of the contractors not complying with the provisions of<br />
this contract in respect of shoring, the Engineer may, with or without<br />
notice to the contractor put up shoring or improve shoring already
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 463<br />
put up or adopt such other measures as he may deem necessary<br />
and all the cost of such procedures adopted by the Engineer, shall<br />
be borne by the contractor.<br />
15.0 LIABILITY FOR TIMBERING<br />
a) No work done by the Engineer or his workmen for the fact that the<br />
timbering has complied with his <strong>specifications</strong> shall absolve the<br />
contractor from his responsibility and he will be responsible for<br />
making good any damage caused as a result of the timbering failing<br />
to give proper support to the sides of the excavation.<br />
b) The timbering to the sides of excavation for structures shall be<br />
carried out in such a way that there is no obstruction caused to the<br />
filling of formwork for the walls. The supporting struts and walling<br />
shall be removed by the contractor in stages to suit progress of<br />
concreting.<br />
c) If the Engineer is not satisfied that the standard of timbering is equal<br />
to that shown on the approved drawing or that the sides of the<br />
excavation have not been secured in a manner to render such<br />
excavating safe for working, he may, one hour after notifying the<br />
contractor or his representative in writing, employ his own men to<br />
alter the timbering and the cost of such workman and materials<br />
employed shall be paid for by the contractors.<br />
16.0 CONTRACTOR'S RESPONSIBILITY FOR SECURE SHORING AND OR<br />
ALL DAMAGES<br />
The contractor will be held responsible for providing secure shoring<br />
and for adopting every other precaution which may be necessary or<br />
proper for protecting any building which may be damaged or be<br />
liable to damage by the excavation of any trench or otherwise by the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 464<br />
execution of the work in the vicinity of such building. If the Engineer<br />
shall require the adoption of any special or extra measures or<br />
precautions, the contractors shall forthwith adopt and supply the<br />
same, but this provision is not to be read or understood as in any<br />
degree of relieving the contractors from responsibility or from<br />
liability under Clause 54 of General Conditions of Contract, in<br />
respect of claims made against the Corporation by for loss or<br />
damage which may be caused to any such building by the execution<br />
of any of the <strong>works</strong> or otherwise. After the work is completed near<br />
buildings, the contractor shall remove any shoring and make good<br />
any cutting out or other damage that may have been done.<br />
17.0 VENTILATION<br />
The contractor shall provide adequate ventilation and efficient<br />
apparatus to keep all excavation, trenches tunnels and headings<br />
structures, sewers and manholes free from all gases whether<br />
generated in strata arising from the use of explosive for blasting<br />
sewage gases or otherwise and he shall take precautions to<br />
ascertain that they are in a safe condition before allowing workman<br />
to proceed.<br />
18.0 PUMPING OUT WATER<br />
The contractors shall provide and work at their own cost all pumps<br />
engines and machinery requisite to keep the trenches for the sewers,<br />
drains or foundations and all other excavations clear of water,<br />
whether sub-soil water, storm water, leakage from tanks, wells<br />
drains, sewers, water mains, tide water etc. so that there may be no<br />
accumulations of such water and that no setting out may be done,<br />
no masonry may be laid, no concrete deposited, no joints made and
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 465<br />
no measurements taken in water. The pumping shall be continued<br />
so long after execution of any portion of work and repeated so after<br />
as the Engineer may consider as necessary. The pumps and power<br />
applied must be such as the Engineer may determine to be sufficient<br />
at any <strong>particular</strong> time, so he may himself supply pumps and power<br />
at contractor's expenses, so he may stop the work together until he is<br />
satisfied and also impose a fine upon the contractors. The rate<br />
excavation includes pumping out any quantities of water as<br />
mentioned above by using any number of pumps and for any length<br />
and time singly or in combination. Nothing extra, whatsoever, will<br />
be paid on this account during the execution of the whole work.<br />
19.0 KEEP EXCAVATION CLEAR OF WATER<br />
a) Where ground water is encountered or anticipated, the contractor<br />
shall provide sufficient pumps to handle the ingress of water and<br />
must provide and maintain in working order stand by pumping units<br />
to be available and employed in the event of mechanical failure.<br />
The contractor must also arrange for night and day manning and<br />
operating of the pumps wherever necessary to ensure that at all<br />
times and weather the work may proceed.<br />
b) The contractors shall not allow any accumulation of water either<br />
from the discharge of their dewatering pumps or their water<br />
connection on the site of their work. If an accumulation is<br />
unavoidable, it shall be treated with insecticides to the satisfaction of<br />
the Engineer. In case of failures to do this on the part of the<br />
contractors, such accumulation shall be treated by <strong>CIDCO</strong> at the<br />
cost of contractors.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 466<br />
20.0 BLASTING PROCEDURE<br />
Blasting shall not be done without the previous consent of the<br />
Engineer and shall be restricted to the hours which he may<br />
prescribed. If, in the opinion of the Engineer, blasting would be<br />
dangerous to persons or adjacent structures, or is being carried on<br />
in a reckless manner, the rock shall be excavated by other means.<br />
21.0 STORAGE OF EXPLOSIVE<br />
a) It shall be as per Clause 45 of General Conditions of Contract.<br />
b) The contractor shall obtain the previous permission of the<br />
appropriate authority for the site, manner and method of storing<br />
explosives near the site of work. All handling of explosives including<br />
storage, transporting shall be carried out under the rules approved<br />
by the Explosives Department of the Government.<br />
c) In carrying out rock blasting the contractors shall take all necessary<br />
precautions by the use of screens weighted down and other means<br />
for the protection of life and property, and shall strictly comply with<br />
all rules and regulations that may be laid down by the commissioner<br />
of police, by the Engineer or by other regularly constituted authority<br />
having jurisdiction relative to handling, storing and use of explosive.<br />
d) In order to ensure the safety of surrounding property and persons,<br />
no charge shall be used which is larger than necessary to properly<br />
start<br />
22.0 RATES FOR EXCAVATION<br />
a) The rates for excavation shall be held to include and cover without<br />
extra charge all the stipulations contained in every portion of these<br />
present with regard o setting out, provisions for the passage of traffic<br />
and for access to premises, arrangement for the continuance of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 467<br />
drainage, water supply or lighting if interrupted by the work,<br />
arrangements for the efficient protection of the life and property,<br />
fencing, lighting, watching, shoring, pumping, shaping the trenches,<br />
maintenance of water pipes, gas pipes, drains and other work met<br />
with in or about the excavation, watering and ramming foundations,<br />
temporary refilling, consolidation and subsequent re-excavation, on<br />
account of rain, holidays or special occasions, filling in, ramming,<br />
watering and consolidating, surplus excavated material as<br />
stipulated, here in and all necessary matters and thing, connected<br />
with and rendered necessary or otherwise involved by the<br />
excavation. The rate of excavation also includes pumping out any<br />
quantity of water from any source by using any number of pumps<br />
and for any length of time singly or in combination. Nothing extra<br />
will be paid on this account during the excavation of the whole work.<br />
b) If, in the opinion of the Engineer, the exigencies of the work require<br />
that in any part the whole quantities of excavation shall be done<br />
upto the full measurement paid for, the contractors shall have no<br />
claim for extra payment on account of the allowance or concessions<br />
shall not be applicable to any work, unless it comes completely<br />
under one of the above descriptions to which a settled mode of<br />
measurement is applied.<br />
23.0 SIGHT RAILS AND BONING STAVES<br />
23.1 In laying the pipe sewers and constructing drains, the centre for each<br />
manhole must be marked by a peg, or otherwise, as may be<br />
determined by the Engineer. The contractors are then to dig holes<br />
for and set up two posts (about 100 mm x 100 mm x 1800 mm) at<br />
each manhole at nearly equal distance from the peg and a sufficient
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 468<br />
distance therefrom to be well clear of all intended excavation, so<br />
arranged that a sight-rail when fixed level against the post will cross<br />
the centre of the manhole. The posts must also be so set up that the<br />
longitudinal direction of the rail may be as clear as possible of the<br />
direction of any of the lines of pipes or drains converging to the<br />
manhole. If walls of buildings afford suitable means of fixing the<br />
sight-rail, the post may, however the dispensed with. The sight rails<br />
must not in any case be more than 30 M. apart intermediate rails<br />
therefore be put up if necessary.<br />
23.2 Construction of boning staves<br />
23.3 Site rails<br />
Boning staves shall be prepared by the contractors about 75 mm by<br />
50 mm of various lengths, each length being of a certain number of<br />
Metre and with a fixed tee-head ad a fixed intermediate cross piece,<br />
each about 300 mm long. The top edge of the cross piece must be<br />
fixed at distance below the top edge of this tee-head, equal to as the<br />
case may be, the out side diametre of the pipe or thickness of the<br />
concrete bed to be laid. The boning staff, must be marked on both<br />
sides to indicate its full length. According to the circumstances of<br />
each case, a suitable length of boning staff will be determined upon,<br />
and the reduced level of the bed of the pipe or bottom of concrete of<br />
drain at each sight-rail added to the selected length of boning staff,<br />
will be marked by a horizontal line on both posts, or on walls or<br />
fences to which the sight-rail is to be fixed.<br />
a) The sight-rails (about 25 cm wide and 40 mm thick) is to be screwed<br />
with the top edge against the level marks. The centre line of the<br />
pipe sewer or the drain will be marked on the rail and this mark will
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 469<br />
denote also the meeting point of the centre lines of any converging<br />
drains or pipe sewers. A line drawn from the top edge one rail to<br />
the top of edge of the next rail will be vertically parallel with the bed<br />
of the sewer or drain and the depth of the bed of the sewer or drain<br />
at any intermediate point may be easily determined by letting down<br />
the selected boning staff until the tee-head comes in the line of sight<br />
from rail to rail.<br />
b) The posts and rails are to be perfectly square and planed smooth on<br />
all sides and edges. The rails are to be painted white on both sides,<br />
and the tee-heads and cross piece of the boning staves are to be<br />
painted black.<br />
c) If the pipes or drains converging to a manhole come in at various<br />
levels, there must be a rail fixed for every different level. When a rail<br />
comes within 0.60 M. of the surface of the ground, a higher sight-<br />
rail must be fixed for use with the rail over the next point.<br />
d) The posts and rails must in no case be removed until the trenches is<br />
excavated, the drains are constructed or the pipes are laid and<br />
permission given to proceed with the filling in.<br />
24.0 FOUNDATIONS IN SOFT GROUNDS<br />
a) When work of constructing the sewers has to be carried out in soft<br />
under ground strata, such as puddle etc. or in a reclaimed land, a<br />
good foundations shall be provided for the pipes and manholes. For<br />
the former, excavation in the trench shall be taken 75 mm deeper<br />
than what is ordinarily required and for this depth the whole of the<br />
trenches shall be covered with M-150 concrete slab of the required
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 470<br />
width, reinforced with BRC fabric No. 9 or any other fabric approved<br />
by the Engineer. The foundation concrete of the manholes shall<br />
similarly be reinforced with the same fabric, spread to cover the<br />
whole area of the foundation.<br />
b) The fabric shall be suitably cut to the requirements and securely<br />
joined together with adequate laps which should not be less than<br />
200 mm. The fabric in the line and manholes must also be securely<br />
jointed together. The rates in both the cases shall be held to include<br />
all lapping, joining and also any probable wastage.<br />
25.0 CONTRACTOR TO OBTAIN PERMISSION BEFORE LAYING PIPES,<br />
CONCRETE OR CONSTRUCTION OF MASONRY<br />
When any portion of the excavation shall have been carried down to<br />
the necessary depth, the contractors shall obtain permission from the<br />
Engineer, before commencing the laying of pipes or concrete or the<br />
construction of masonry.<br />
26.0 LAYING OF PIPES<br />
a) The pipes are to be laid with sockets facing up the gradients<br />
beginning at the lower end. No pipe to be laid until the trench has<br />
been excavated its required depth for a distance of 20 M in front of<br />
the pipe to be laid. (This distance may vary as directed by the<br />
Engineer)<br />
b) All the pipes are to be laid perfectly true, both in line and on<br />
gradient. The pipes in a trench shall be all laid and fitted previous<br />
to the jointing being commenced.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 471<br />
c) Properly fitted temporary wooden stoppers shall be provided and<br />
constantly used to close the ends of all incompleted pipe lines. The<br />
stopper are only to be removed when pipes are being and jointed.<br />
27.0 FOUNDATION FOR PIPE LAYING<br />
27.1 Concrete bed, haunching and surround to pipes<br />
At approximately every four pipes or 7 M whichever is less interval,<br />
the contractors shall form a joint in the concrete bed or surround by<br />
vertically shuttering the bed.<br />
27.2 Bedding of Stoneware Pipe<br />
The bedding for stoneware pipes shall be of M-200 concrete and<br />
has the size and shape as indicated in the plan.<br />
27.3 Foundation for R.C. Pipes<br />
28.0 ENCASING<br />
The foundation for R.C. Pipes drain or sewer if required shall be<br />
formed of cradle block or full encasement of M-200 concrete of the<br />
shape and dimensions shown on the drawings. The same should be<br />
carefully laid on a bed of atleast 25 mm of sand cushion to the<br />
required grade and alignment.<br />
a) If pipes are required to be wholly encased concrete in encasement<br />
the pipes may be required to be laid in two stages or in one as may<br />
be decide by the Engineer. When it is decided to do the work in two<br />
stages, the work in the first stage may have to be done either (I) the<br />
method described above for laying bed blocks for the foundation or<br />
(ii) putting in bed concrete in such lengths as may be required by the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 472<br />
Engineer. After the pipes are laid and jointed on those beds and the<br />
joints tested, the remaining work of concreting in the 2 nd stage will<br />
be allowed.<br />
b) When it is decided to do the work of encasing in one stage only<br />
pipes shall be laid on bricks or stone chips to the required level and<br />
joint. After the joints are tested the work of concreting will be done.<br />
The contractor shall be not entitled to any extra payment in either<br />
case. The contractor shall prepare the necessary form work for the<br />
encasement as required by the Engineer.<br />
After the pipes are jointed, a period of atleast 24 hours must elapse,<br />
before the top concrete over the pipes are laid.<br />
c) While encasing of R.C. Pipes of NP 3 class, a clear open space of 25<br />
mm all around shall be left in the encasement at each joint for<br />
flexibility without any extra cost.<br />
29.0 JOINTING OF PIPES<br />
29.1 Jointing of stones ware pipes :<br />
a) All the pipe joints shall be caulked with tarred gasket (prepared<br />
ready for use before being brought on the work ) in one length for<br />
each joint and sufficiently long to entirely surround the spigot end of<br />
the pipe the gasket to be driven as far as possible by means of a<br />
suitable instrument. After the pipes are thoroughly cleaned and<br />
moistened, mixture of one part of cement and one part of clean fine<br />
sand tempered with just sufficient water have a consistency of semi-
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 473<br />
dry condition should be forced into the joints and well rammed with<br />
caulking tools the whole space around the spigot between it and the<br />
socket is united full, and the joints shall be finished off with a<br />
splayed fillet sloping at 45 degrees to the side of the pipe. The shaft<br />
or a pipe entering or leaving a manhole shall have splayed fitlet of<br />
neat cement laid around the same extending on the outside<br />
plastering of the manhole 75 mm beyond the outside of the pipe<br />
and 75 mm beyond the outside plastering of the manhole. Such<br />
fillets shall be deemed to be included in the rates for pipe laid<br />
complete.<br />
b) Great care must be taken after the joints are made that the pipes be<br />
not moved or shaken before the cement has thoroughly set.<br />
c) The rate for providing, laying and jointing of S.W. or R.C. pipes shall<br />
also include the cost of plugging up the mouths of these pipes with<br />
brick in cement mortar 1:6 with cement plaster 1:3 wherever<br />
directed by the Engineer.<br />
29.2 Jointing concrete Pipes<br />
a) Each concrete pipe with the rubber ring accurately positioned on the<br />
spigot shall be pushed well home into the socket of the previously<br />
laid pipe by means of uniformly applied pressure with the aid of a<br />
jack or similar appliance.<br />
b) Concrete pipes of the spigot and socket type with roll on rubber<br />
rings shall be used, and the manufacturer’s instructions shall be<br />
deemed to form a part of this specification.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 474<br />
c) Rubber rings shall be lubricated before making the joint and the<br />
lubricant shall only be soft soap water or an approved lubricant<br />
supplied by the manufacturer.<br />
d) In case of R.C. pipe entering or leaving a manhole a flexible joint<br />
may be provided atleast within 0.60 M from the outer end of the<br />
manhole.<br />
e) A drop in water level of not more than 50 mm in one hour shall be<br />
permitted, in case of hydraulic test of manhole.<br />
30.0 ALL WORKS TO BE WATER TIGHT<br />
a) The drains, manholes and all joints of pipes must be made<br />
thoroughly sound and water tight and any joint which may be<br />
proved to be leaky at any time during the progress of <strong>works</strong> or<br />
during the contractors subsequent period of maintenance shall be<br />
immediately made sound by the contractors at their own expense.<br />
The contractors, when required by the Engineer shall at their own<br />
cost prove all <strong>works</strong> to be water tight by filling it with water to such<br />
height as the Engineer may determine. Any additional precautionary<br />
measures or appliances that may be found necessary to ensure the<br />
water tightness of the manholes, flush stains, disc plugs in junctions<br />
and the joints of pipes shall be adopted by the contractor without<br />
extra charges, the responsibility of making them when completely<br />
water tight resting upon the contractor.<br />
b) Immediately after the test with the double disc or cylinder as<br />
mentioned in Clause No. 41.0 has been completed and any defect<br />
hereby disclosed have been made good the contractor shall prove<br />
the joints of the stretch of the under ground pipe whether of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 475<br />
stoneware, cast iron or R..C. pipes, to be water tight by filling in<br />
pipes with water before filling in the trenches to the level of 1.5 M<br />
above the top of the highest pipe in the stretch and heading the<br />
water up for the period of one hour or such further time as the<br />
Engineer may direct. The apparatus used for the purpose of testing<br />
shall be approved by the Engineer. The contractor, if required by the<br />
Engineer, shall pump the excavation dry and keep it so during the<br />
period of testing. No test applied to part of a stretch when adding<br />
water from a measuring vessel at regular 10 minutes interval, and<br />
noting the quantity required to maintain the original water level. For<br />
the purpose of this test the average quantity added should not excess<br />
1 litre / hour / 100 linear metres /10 mm of nominal internal<br />
diameter).<br />
c)<br />
Any leakage including excessive sweating which cause a drop in the<br />
test water level will be visible and the defective part of the work<br />
should be removed and made good.<br />
In the case of cast iron rising mains, they shall be tested for a safe<br />
pressure as directed by the Engineer.<br />
The manholes when they have been raised above the highest subsoil<br />
water level expected in the monsoon shall similarly tested for water<br />
tightness as for the pipe lines. The procedure for this shall be as<br />
follows.<br />
The mouths of all pipes entering the manholes shall be suitably<br />
plugged with brick, or wooden any other type of plug. The manhole<br />
under test shall then be filled with water upto the general subsoil<br />
water level and observed for a period of one hour. If the level dose<br />
not drop by more than 50 mm in one hour, it shall be assumed that<br />
the manhole is tight.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 476<br />
During the period of the test the out side trench shall be kept free<br />
from any accumulation of subsoil water. In case of a drop of more<br />
than 50 mm in the water level, the contractor shall note the places<br />
from where the leakage is taking places and take step to stop the<br />
leakage.<br />
31.0 INSPECTION OF THE JOINTS<br />
After the joints of any pipes in underground <strong>works</strong> have thoroughly<br />
set the Engineer (or any person whom he may appoint) may inspect<br />
the joints and if he has any doubt as to their soundness he may<br />
required the contractor to cut open and clean away the cement or<br />
lead as the case may be of any joint, that he may select and to make<br />
good the same at their expense provided that unless defect to be<br />
found, they shall not be required to open more than one joint in 20<br />
M of pipe though if the defect be found the Engineer may direct<br />
them to open as many joints as be may seem necessary.<br />
32.0 CLEANING OF THE PIPES<br />
a) As soon as a stretch of pipes whether of stoneware or cast iron or<br />
R.C. pipes has been laid complete from manhole, the contractor<br />
shall run through the pipes both backwards and forwards a double<br />
disc or solid or closed cylinder 75 mm less in diameter than the<br />
internal diameter of the pipes. The open end of an incomplete<br />
stretch of pipe line shall be securely closed as may be directed by the<br />
Engineer to prevent entry of mud or silt etc.<br />
b) If, as a result of the removal of the obstruction, the Engineer<br />
considers that damages may have been caused to the pipe he shall<br />
be entitled to order the length to be retested at the expense of the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 477<br />
Contractor. Should such retest prove unsatisfactory, the Contractor<br />
shall, at his own expense, amend the work and carry out such<br />
further tests as are required by the Engineer.<br />
c) If shall also be ascertained by the contractors that each stretch from<br />
manhole to manhole is absolute clear and without any obstruction<br />
visual examination of the interior of the pipe line suitably<br />
enlightened by projected sunlight or otherwise.<br />
33.0 FRACTURE OF PIPES<br />
a) In the event of pipes being fractured after being to all appearances<br />
properly laid whether due to imperfect loads having being found or<br />
the material for refilling having being improperly selected or to any<br />
other causes, the contractor in every instance will be held<br />
responsible and will be called upon to replace the defective pipes at<br />
his own cost, if such defect appears before the expiration of the<br />
period of maintenance.<br />
b) Any pipe of length of pipe found to be defective shall be immediately<br />
removed and replaced at the contractors expense, and leakage<br />
joints shall be remade, the inspections tests shall then be repeated<br />
as often as necessary, until the whole line under inspection or test is<br />
accepted by the Engineer.<br />
34.0 ALL WORKS TO BE CLEARED, CLEAN AND PERFECT<br />
a) The contractor shall after completion or whenever required by the<br />
Engineer, prove all pipes and fittings to be clear, clean and perfect,<br />
and for this purpose shall, at their own expense and in the presence<br />
of the Engineer, or his appointee provide suitable instruments and
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 478<br />
appliances and pass them through the pipes and shall if required,<br />
throw in water and show that it passed freely through every portion<br />
of the work. Brick, mortar and rubbish shall not be allowed to fall in<br />
into the manholes or sewer lines while fixing or if allowed shall be<br />
removed by the contractor at their own expense.<br />
b) The contractors to clean and use existing pipes met with<br />
The contractors are if and when required, to take up any existing<br />
pipes that be met with a clean and prepare them for reuse for such<br />
work they will be paid at the contact rates for excavation and filling,<br />
such excavation will be measured 0.90 M wide for 225 mm to 450<br />
mm pipes, 0.60 M wider for smaller pipes and only in case to the<br />
depth of pipes bed. The filling consolidation etc., shall be done as<br />
described for new rocks and under the same conditions in every<br />
respect.<br />
35.0 MEASUREMENT OF PIPES<br />
a) All pipes be measured according to the <strong>works</strong> actually done by<br />
them, and no allowances will be made for any waste in cutting to the<br />
exact length required. An exception to this will be made only in the<br />
case of short branches of 100 mm dia stoneware pipes, which be<br />
treated in the manner hereafter described with regard to fittings.<br />
The contractor shall be under obligation to use the pieces or part of<br />
the pieces out of from 100 mm stoneware pipes, if it be deemed by<br />
the Engineer practicable to do so and no further payment shall be<br />
made for the same to the contractor. A socket attached to a straight<br />
pipe will not be measured, but a spigot end of a straight pipe<br />
whether such end be free for entering into a socket will be measured<br />
to its full length. Pieces of cut pipe not used in the work will become
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 479<br />
the property of the contractors except pieces of 100 mm dia<br />
stoneware pipes, for which they have been or may be paid direct.<br />
When a cast iron pipe may have necessary been cut for the<br />
exigencies of the work, the contractors will be given credit for the<br />
piece not used in work at the rate at which they are charged by the<br />
corporation provided that the cuttings have been properly done and<br />
the portion used in the work be sound.<br />
b) A bend, junction, or any separate piece of fitting which may have<br />
necessarily been cut for the exigencies of the work will be taken into<br />
account as if whole, provided that the cutting has been done<br />
properly and that the portion used in the work is sound. This clause<br />
shall not apply to a straight pipe under any circumstances except<br />
only to 100 dia stoneware pipes as hereinbefore described. In<br />
measuring the lengths of pipes laid, deduction shall be made for the<br />
lengths of channels between the inside face of the walls of the<br />
manholes.<br />
c) The cost of every joint between metal pipes or fittings and stoneware<br />
pipes or sockets or masonry shall be held to be included in the rate<br />
entered in the Bill of quantities and rates for the metal pieces<br />
connected with the stoneware pipe, socket or with the masonry.<br />
36.0 MANHOLES/CHAMBERS<br />
a) The Manholes/Chambers on the sewers shall be constructed in the<br />
form and of the dimensions shown on the drawings. The depth of<br />
the manholes shall be measured from the top of cover to the invert<br />
level of the manholes.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 480<br />
b) The Manholes/Chambers shall be constructed at places shown in the<br />
drawings of wherever directed by the Engineer. Type designs for the<br />
manholes are shown on the drawings but the actual dimensions<br />
shall in each case be determined by the Engineer as the<br />
circumstances may require.<br />
36.1 Construction of brick masonry manholes<br />
The walls of the manholes shall be built in brickwork in cement<br />
mortar and wall and the cap is plastered both from inside and<br />
outside with cement plaster 1:1. In the case of conical manholes,<br />
the walls shall be brought up to within 475 mm of the <strong>road</strong> surface<br />
over which 30 mm thick concrete cap of M-150 furncated conical<br />
shape as shown in the drawing and is cast in situ and shall be<br />
covered over with a cast iron frame and cover or cast iron plate with<br />
a cast iron frame and cover as may be in each case be required by<br />
the Engineer. Whether rectangular manholes are to be constructed<br />
the brick walls shall be brought up to with 100 mm to 150 mm as<br />
required, of the <strong>road</strong> surface and shall at this depth be covered over<br />
with a reinforced cement concrete slab with an opening of the site<br />
and in the position as directed by the Engineer. The opening shall<br />
be formed by means of joists of sizes as shown on drawings, resting<br />
on the side walls and embedded in the slab. On these joists as<br />
support wall of brick in cement shall be erected and brought upto<br />
within 475 mm of the <strong>road</strong> surface where they shall be covered with<br />
cast iron frame and cover etc. as described above. The work shall<br />
be properly added and the courses brought up in regular and<br />
uniform manner.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 481<br />
37.0 RATE OF MANHOLE<br />
The rate to be quoted in the bill of quantities and the rate for the<br />
manholes shall include complete structure, concrete cap, plastered<br />
with cement both inside and outside, bottom concrete and channel<br />
or channel with the C.I. frame and cover C.I. sheets, etc. everything<br />
complete as type design drawing including 3” x 3” (75 mm x 75<br />
mm) vata all round the extended wall at its junction with the hedding<br />
and including cutting the pipes flush with the inside plaster of the<br />
wall of flush without excavation and rubble soling if required 150 m<br />
dia, vertical pipe 150 mm dia, S.W. double tee junction 150 mm dia<br />
S.W. right angled bend, etc or branch connection will be paid for<br />
separately.<br />
38.0 GUIDELINES FOR CONSTRUCTION OF ADDITIONAL MANHOLES<br />
Additional manholes is constructed on the sewer line so as to<br />
facilitate:-<br />
1. Cleaning the body of the sewer if the length between the manhole is<br />
more than 30 M (100 feet)<br />
2. To eliminate the body connection by constructing the manhole at the<br />
above place so as to eliminate frequent chokes.<br />
3. The purpose of constructing additional manhole is to facilitate<br />
cleaning of the manhole and remove the silt upto the invert level<br />
and to facilitate removing silt from the body of the sewer by<br />
manually or by operating winching machines or to facilitate passing<br />
disc or operating acquitator or compressor or jetting machines or by<br />
any other mechanical means.<br />
To serve the above purpose, manholes should be constructed right<br />
upon the invert level of the sewer. For this purpose excavation is to<br />
be done upto the foundation level by the side of the pipe or avoid<br />
sewer without damaging the pipe or ovoid sewer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 482<br />
In pipe sewer sufficient bedding of concrete should be placed and<br />
walls should be constructed of the standard thickness on the<br />
foundation upto the top of <strong>road</strong> level as per standard design of<br />
circular manholes. In ovoid sewer walls should be constructed upto<br />
the top of the arch and concrete beams should be provided above<br />
the ovoid sewer in a rectangular shape, so that the weight of<br />
masonry above does not fall on the arch of ovoid sewer, and walls<br />
should be constructed upto <strong>road</strong> level as per standard design of a<br />
rectangular manhole (including steps). After all, the plaster work is<br />
done and frame and covers are fixed above usual 0.30 M (1.’0”)<br />
thick concrete block. The top of the pipe or the ovoid sewer should<br />
be broken. This should be done by person standing top of the <strong>road</strong><br />
level, by using long crow bars by heavy weight fixed at the bottom or<br />
by some other mechanical device. As getting inside the manhole<br />
and breaking with sledge hammer or chisel may cause sudden raise<br />
in level of water or poisonous gas may com out suddenly and may<br />
endanger the lift of the workman.<br />
After sufficiently big manhole is made in the arch of pipe, four<br />
manholes should be kept open in the stretch where manhole is to be<br />
constructed, two on upstream side and two on downstream side.<br />
The manhole covers should be kept open for an hour and tests are<br />
carried out viz. Davy’s safety lamp, lead acetate paper test and<br />
candle test. After the tests are successful another workman should<br />
get down in the newly constructed manhole preferably when the<br />
channel condition is seen on the manhole upstream or downstream<br />
side. He should apply coconut oil all over body and after tying rope<br />
around his waist and the other end held by another workman at the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 483<br />
top the work man should get down the manhole and chisel the pipe<br />
ends or ovoid arches ends so that the same is in flush with the wall<br />
of the manhole. Plaster in cement mortar 1:1 or if a big gap is<br />
there, concrete should be placed over exposed surface.<br />
(1 : 11/2:3 c.c.)<br />
The manhole should then be cleared of all debris etc. and should be<br />
thoroughly cleaned and handed over to <strong>CIDCO</strong>, if the manholes are<br />
constructed above main sewer, it should be shown to the Engineer,<br />
before handing over to the <strong>CIDCO</strong>.<br />
No utility service should be allowed to remain inside the manhole.<br />
Care should be taken to shift the same outside manhole.<br />
Steps should be provide on the side or place where there are no<br />
connections.<br />
After completing the work, the same should be handed over to<br />
<strong>CIDCO</strong> for maintenance. A copy of the memo acknowledging the<br />
taking over should be handed over to the respective superintending<br />
Engineer (Construction).<br />
38.1 Drop Arrangement<br />
The rate of providing 150 mm, 230 mm dia vertical drop<br />
arrangement 0.60 M high in manholes with drop arrangement will<br />
include :<br />
1. i) Providing 150 mm, 230 mm, 300 mm dia S.W. pipe of<br />
required length embedded in the masonry of the manholes at<br />
the upper and lower ends of the drop arrangement.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 484<br />
ii) Providing and fixing 1 No. 150 mm, 230 mm or 300 mm<br />
S.W. right angled bend and 1 No. 150 mm x 150 mm x 150<br />
mm, 230 mm x 230 mm x 230 mm or 300 mm x 300 mm x<br />
300 mm S.W. double tee junction including cutting the ends of<br />
required and jointing and filletting as specified.<br />
iii) ½ brick thick 1:2 brick masonry encasement all around with<br />
extra brick work below the bend upto the excavation level of<br />
manhole and that in the tapeing portion of the manhole<br />
including curing and finishing smooth with cement plaster 20<br />
mm thick 1:1.<br />
iv) Plugging the open mouths of the double tee junctions and<br />
house connection pipes where directed so as to make them<br />
water tight.<br />
2. The rate for extra each meter height of 150 mm, 230 mm, 300 mm,<br />
vertical drop arrangement shall include the following :<br />
i) providing 150 mm, 230 mm, 300 mm S.W. pipes including<br />
cutting, jointing, filletting etc. all complete.<br />
ii) ½ brick thick 1:2 brick masonry encasement all round<br />
including curing and finishing smooth the exposed surface<br />
with cement plaster 20 mm thick 1:1.<br />
3. For the payment of the items of vertical drop arrangement the height<br />
will be measured from the invert of the right angled bend to the<br />
invert of the sewer or house connection that is being dropped 600<br />
mm height being paid under the item of ‘Providing arrangement<br />
and the remaining height under the item of Extra per Metre height of<br />
drop arrangement.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 485<br />
4. In case of drop arrangement above 300 mm dia, the class of R.C.<br />
pipe used shall be NP 2 class. It shall consist of right angled bend<br />
of required diameter and double ‘T’ junction. It will be surrounded<br />
by ½ brick thick masonry (1:2) encasement all round with extra brick<br />
work below etc. as mentioned above.<br />
39.0 FLOORS AND HALF CHANNEL PIPES<br />
40.0 STEPS<br />
The floors shall consist of cement concrete. Salt glazed or concrete<br />
of R.C. half channel pipes of the required size and curves shall be<br />
laid and bedded in cement on the concrete base to the same line<br />
and fall as sewers unless otherwise directed. Both sides of the<br />
channel pipes shall be benched up in concrete and rendered in<br />
cement mortar 20 mm thick and formed to a slope of not less than 1<br />
in 12 to the channel.<br />
Where the depth of the invert exceeds 0.20 M below the surface of<br />
the ground, cast iron steps weighing not less than 5.44 kg. And of<br />
approved pattern shall be built at every four courses or 40 cm<br />
intervals in concrete manhole with such additional hand irons as<br />
may be necessary for safety. The first step shall be provided at 0.6<br />
M below the <strong>road</strong> surface or top of manhole cover.<br />
41.0 SAFETY CHAINS<br />
Safety chains shall be made of alluminium alloy as approved by the<br />
Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 486<br />
42.0 LADDERS<br />
Except where otherwise specified ladders shall be of alluminium<br />
alloy of approved design and manufacture.<br />
The ladder rings shall be at 300 mm centres and the stringers 400<br />
mm apart strong support stays shall be provided on both sides of the<br />
ladder at not more than 2.5 M centres.<br />
Pipes entering and leaving manhole :<br />
Whenever a pipe enters or leaves, manholes, bricks on edge laid<br />
around the upper half of the pipe so as to form an arch. All round<br />
the pipe, there shall be a joint of cement mortar 13 mm thick<br />
between it and the bricks or cement concrete. The ends of all pipes<br />
shall be properly built in and neatly finished of with cement mortar.<br />
The pipe projections are to be cut so that the ends are flush with<br />
plastered surface.<br />
Vent shafts<br />
Vent shafts are to be provided at the heads of all sewers and also<br />
where as shown on the drawings or as directed by the Engineer.<br />
The height and the material, whether galvanized sheet iron or cast<br />
iron or R.C. shall be decided by the Engineer.<br />
43.0 NEAT CEMENT<br />
In using neat cement it shall be carefully moistened with little water<br />
as may serve to bring it to the required consistency. Only so much<br />
as can be used quickly shall be mixed at one time, and no cement<br />
after it has begun to set shall be allowed to be worked up again, but<br />
shall be rejected and removed from the <strong>works</strong>.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 487<br />
44.0 CONCRETE SHINGLES<br />
45.0 MATERIALS<br />
a) Cement<br />
The whole of the shingle for concrete shall be obtained from the bed<br />
bank of river. It shall be free from shells and well washed, clear<br />
from earth and every other impurity.<br />
All cement for use on the <strong>works</strong> except otherwise stated shall be the<br />
standard portland cement manufactured in India and shall conform<br />
to the I.S. 269 latest version. It shall be of make and quality<br />
approved by the Engineer.<br />
The cement shall be stored in weather proof godown or cement soils<br />
specially constructed for the purpose of such a manner as a to<br />
prevent deterioration due to moisture or intrusion of foreign matter.<br />
The weather proof godown shall have a solid impervious floor raised<br />
300mm above the general ground level so that the cement stored<br />
thereon shall not come in direct contact with the sub-soil moisture.<br />
The passages and the general construction shall be such that it<br />
affords full protection from weather effects. Large stocks of cement<br />
shall not be kept at the <strong>works</strong> but only sufficient quantities should be<br />
kept to maintain continuity of the work.<br />
Storage of cement<br />
If cement is supplied in bags a suitable weighing scale shall be<br />
provided and shall required by the Engineer be used for checking<br />
the weight of every bag at the Contractor’s expense. Bags under<br />
weight by more than 2 per cent of the nominal weight shall be<br />
rejected and removed from the site.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 488<br />
No cement that has been stored for more than 90 days ordinarily be<br />
allowed to be used on the <strong>works</strong>. Cement stored for longer period<br />
than 90 days shall be used on work only with the specific written<br />
permission of the Engineer who shall ascertain its quality after due<br />
testing in the laboratory before giving such permission. All expenses<br />
in connection with the test shall be borne by the contractors.<br />
For testing the quality of cement, samples shall be taken from every<br />
consignment arrived at the site of work at the option of the Engineer.<br />
The contractors shall afford every facility to the Engineer for<br />
inspection and sampling the cement. The cement godown shall be<br />
so arranged by the contractors that each consignment could be<br />
stacked separately and in such a manner so as to allow counting<br />
bags in each row with case. The test results shall, ordinarily, be<br />
available within a week of sampling and the contractor shall not use<br />
by any part of the consignment until the results of the tests are<br />
received and found satisfactory. Should, however, the use of such<br />
cement becomes imperative before the test results are received, the<br />
contractors may do so entirely at their own risk and cost and the<br />
whole of such work carried out by them is liable for rejection, if the<br />
tests results are found unsatisfactory. Any consignment failing to<br />
meet the requirements of I.S. shall be rejected and shall be removed<br />
from the work site within 48 hours of the intimation from the<br />
Engineer. The decision of the Engineer in this respect shall be final<br />
and binding on the contractors.<br />
The charges in connection with the testing of cement such as<br />
transport of samples, testing fees, etc. shall be borne by the<br />
contractors.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 489<br />
b) Aggregates<br />
The cement used in any type of concrete shall always be measured<br />
by weight and one cubic metre shall be taken as weighing 1440 kgs<br />
(Table-30 of A.C.C. Hand Book)<br />
All the aggregates shall confirm to the latest I.S. 383. The<br />
aggregate shall consist of naturally occurring sand and gravel or<br />
stone crushed or uncrushed or a combination thereof. They are<br />
classified b<strong>road</strong>ly under two categories, viz (i) Sand of fine<br />
aggregates and (ii) coarse, aggregates, depending upon their size.<br />
The fine aggregates are those which pass through I.S. sieve No.480.<br />
And the coarse aggregate are those which retained on I.S. sieve<br />
480.<br />
i) Storage of Aggregate :<br />
The fine and coarse aggregates shall be stored separately and<br />
in such a manner that segregation of the various sized<br />
particle shall not occur, the stock shall be formed on a<br />
platform of weal concrete timber or similar approved hard<br />
standing and aggregates shall be kept clean and free from<br />
foreign substances.<br />
ii) Aggregates shall not be unloaded on to <strong>road</strong>ways or<br />
pathways the Engineer may reject any stock pile or part of a<br />
stock pile if improper storage has, in his opinion, caused<br />
contamination with foreign substances.<br />
iii) Storage pipes of aggregate shall be arranged with proper<br />
drainage and protection from rainfall in order to prevent<br />
excessive changes in moisture content taking place during<br />
concreting.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 490<br />
iv) The aggregates both fine and coarse shall be hard, strong,<br />
durable clean, free from veins and adherant coatings. The<br />
use of flaky and elongated pieces of aggregates shall be<br />
prohibited.<br />
v) The aggregates shall not contain deleterious materials such as<br />
iron pyrite, coal, mica, shale or similar laminate material,<br />
clay, alkali, soft fragments, sea shells, organic impurities etc.<br />
in such quantity as to affect the strength of durability of<br />
concrete or the reinforcement embedded in such reinforced<br />
concrete.<br />
vi) The maximum quantities of deleterious material they may be<br />
permitted shall conform to the following limits by weight.<br />
Deleterious substance<br />
Fine aggregates<br />
percent by weight<br />
Coarse aggregates<br />
percent by weight<br />
Uncrushed Crushed Uncrushed Crushed<br />
1. Coal and lignite 1.00 1.00 1.00 1.00<br />
2. Clay lumps 1.00 1.00 1.00 1.00<br />
3. Soft fragments -- -- 3.00 --<br />
4. Material passing<br />
through 75 microsieve<br />
3.00 3.00 3.00 1.00<br />
5. Shale 1.00 -- -- --<br />
vii) The total of various deleterious materials occurring in any<br />
sample shall, in no case, exceed 5 per cent.<br />
viii) If the aggregate supplied in unclean, it shall be washed. If it<br />
is not properly graded, it shall be screened by hand or by<br />
mechanical means and the various sizes proportioned to get<br />
the required grading.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 491<br />
ix) Storing of aggregate on dusty, muddy and grassy spots shall<br />
be avoided. They shall be stored on the <strong>works</strong> in such a<br />
manner as to prevent intrusion of foreign matter and<br />
protected from exposure to dust. They shall be placed in stock<br />
piles in individual units of suitable sizes and in suitable layers<br />
to prevent segregation. They shall not be allowed to run down<br />
slopes.<br />
c) Sand or fine aggregates<br />
All fine aggregates shall consist of clean, hard, strong, durable<br />
uncoated siliceous gritty material consisting of well graded particles<br />
obtained from rock fragment. It shall be free from clay lumps<br />
injurious amount of dust, mica shells, soft or flaky particles, shale,<br />
alkali, organic matter load or other deleterious substances.<br />
i) The sand shall be taken from source approved by the Engineer.<br />
The sand or fine aggregate shall conform to the latest I.S. No.383.<br />
ii) If the Engineer considers it necessary, it shall be washed and/or<br />
screened before use, at the expense of the Contractors.<br />
iii) The sand shall have a fineness modulus of not less than 2.5 and<br />
not more than 3.0 and the grading shall conform as far as<br />
possible to the following analysis.<br />
I .S. Sieve No. Natural sand or<br />
crushed gravel<br />
Percent passing<br />
Crushed Stone<br />
480 95 – 100 90 – 100<br />
240 70 – 95 60 – 90<br />
120 45 – 85 40 – 80<br />
60 25 – 60 20 – 50<br />
30 5 – 30 5 – 30<br />
15 0 - 10 0 – 15
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 492<br />
iv) The specific gravity of sand shall not be less than 2.6.<br />
v) In no case shall fine aggregate be accepted, containing more than<br />
2% by dry weight not more than 3½% by dry volume, not more<br />
than 5% by dry volume of clay, loam or silt. If any sample of fine<br />
aggregate shown more than 5% of clay, loam, silt in one hour’s<br />
settlement after shaking in excess of water, the lot represented by<br />
the sample shall be rejected.<br />
vi) The following two field tests are recommended for ascertaining the<br />
percentage of clay lumps and impervious organic material and the<br />
contractors shall carry out the same if the Engineer deems<br />
necessary.<br />
1. Test for determining silt in sand<br />
Fill a calibrated tumbler with sand to half its volume and<br />
water there to until the tumbler is three quarters full. Shake up<br />
the mixture vigorously and allow it to settle for about an hour.<br />
The volume of silt visible on top of the sand shall be measure.<br />
If the volume of the silt standing over the sand exceeds 5% of<br />
total volume of sand. The same shall be rejected.<br />
2. Colorometric test for organic impurities<br />
The sample of sand shall be mixed with equal volume of 3%<br />
solution (about one ounce, in a quarter of water) of caustic<br />
soda/sodium hydrauxide taken in a plain glass and the<br />
mixture shall be allowed to stand for 24 hours. The liquid<br />
standing above the sand shall not be darker than lights straw<br />
(pale yellow) colour. If the colour is marked yellow or brown,<br />
the test would indicate presence of organic material in<br />
excessive amount.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 493<br />
d) Coarse aggregates<br />
In case suitable sand is not available in adequate quantities<br />
within a reasonable and economical limit, the contractor may<br />
be allowed to use the crushed or pulverised stone or gravel<br />
either alone or mixed within natural sand in parts. The stone<br />
or gravel shall be clean sharp and free from dust etc. and<br />
shall conform to the latest I.S. 383.<br />
The percentage of crushed stone to be mixed with sand shall<br />
be such as to obtain in fineness modulus of the blended sand<br />
within the limits specified above and/or as approved by the<br />
Engineer after laboratory test.<br />
All coarse aggregates used in concrete <strong>works</strong> shall consist of crushed<br />
rock gravel or other approved inert material.<br />
i) Broken or crushed rock from sound blue basalt or black trap<br />
free from zeolite or other common impurities shall be used in<br />
the concrete as coarse aggregate. The particles of aggregate<br />
shall be clean, hard, tough or elongated pieces. The particles<br />
of aggregate shall be clean, hard, tough durable, free from<br />
deleterious substance and shall contain no soft, flat or<br />
elongated pieces. The course aggregate shall have specific<br />
gravity not less than 2.6 and the water absorption measured<br />
after being immersed for 24 hours in water shall not be more<br />
than 6% by weight. The maximum percentage of deleterious<br />
materials in the coarse aggregate shall not exceed 5% by<br />
weight in the aggregate when tested in conformity with<br />
I.S.No.383.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 494<br />
ii) The nominal size if the coarse aggregate for reinforced<br />
concrete work shall be 20mm. Larger coarse aggregate upto<br />
40mm size may be used if approved by the Engineer, in plain<br />
concrete work. The maximum size of coarse aggregate shall<br />
be as large as possible within the limits specified but in no<br />
case shall be greater than one quarter of the minimum<br />
thickness of the member, provided that the concrete can be<br />
placed in form work without difficulty so as to surround all<br />
reinforcement thoroughly and to fill the corners of the form<br />
work. The minimum size of coarse aggregate shall be, as<br />
mentioned earlier, such as to retain most of the material (90%<br />
- 95%) on I.S. Sieve No.480.<br />
iii) The aggregate shall be screened and, if necessary, blended to<br />
Sieve Size<br />
give the required grading when tested in the laboratory at<br />
Contractors cost by means of standard mesh sieve, the<br />
grading shall fall within the following limits.<br />
Percentage retain by weight<br />
Plain C.C. R.C.C.<br />
40 mm -- --<br />
25 mm 10 to 15 --<br />
20 mm 35 to 40 15 to 0<br />
10 mm 75 to 80 100 to 80<br />
No.480 98 to 100 100 to 95<br />
The percentage given above are for guidance and the Engineer<br />
reserves the right to modify the same to any other lower or higher<br />
value if considered necessary by him. In consolance with the<br />
requirements of the work.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 495<br />
iv) In the event of undesirable segregation occurring in coarse<br />
aggregates, the contractors shall separate the coarse aggregates in<br />
two or more suitable fraction as directed by the Engineer, who<br />
shall set up the required limit of each such fraction. The grading<br />
so specified shall be such as to give a dense, water tight concrete<br />
of specified proportion and strength and required consistency.<br />
v) The Engineer shall have the right and authority to carry out routine<br />
control tests and analysis of the broken rock at any stage of the<br />
work processing and/or concreting operation and the contractors<br />
shall give all necessary facilities in respect of such testing. The<br />
sampling and testing shall be carried out as per Standard I.S.<br />
practice entirely at the cost of the contractor.<br />
e) Water<br />
The water used for the preparation of concrete, for washing sand<br />
etc. and for curing shall be clean and free from objectionable<br />
quantities of silt, organic material, acid, alkali, salts, oil and other<br />
deleterious impurities and it shall be obtained from the sources<br />
approved by the Engineer. Potable water shall generally be found fit<br />
for preparation of concrete. The quantity of water to be added shall<br />
generally be properly measured and controlled.<br />
iii) Water cement ratio<br />
Suitable water cement ratios for the different mixes and used<br />
shall be determined in consultation with the Engineer and they<br />
shall generally not be exceeding 0.5 (i.e. 50% by weight), the<br />
exact values being fixed after taking into account all relevant<br />
factors such as strength required, weather condition, water<br />
absorbed by material, work ability and slump required<br />
consistent with the work requirements, methods of compaction<br />
etc.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 496<br />
45.1 CONCRETE<br />
All cement concrete, whether used in R.C.C. work or plain concrete<br />
work shall M-150, M-200 and M-250 as per latest I.S. code.<br />
45.2 CONTROL AND TESTING OF CONCRETE<br />
Following tests shall be carried out at the site whenever required by<br />
the Engineer in accordance with I.S. 516 (latest).<br />
a) Works Tests – 7 days and 28 days compressive strength test.<br />
b) Consistency Test<br />
c) Moisture contents in aggregates<br />
d) Unit weight of concrete<br />
a) Work Tests<br />
During concreting operation, samples of concrete as placed in<br />
the work shall be taken every day and a set of six cubes of<br />
cylinder shall be made therefrom for being tested for their<br />
compressive strength, the consistency (slump) test shall also be<br />
made and slump required.<br />
All concrete cubes or cylinders shall be tested for compressive<br />
strength as specified under I.S. 456 and 516 at the <strong>CIDCO</strong><br />
laboratory generally as per <strong>specifications</strong> under the latest I.S.<br />
456 and 516. The above specification cover concrete mixes<br />
of grades M-150 and above. Ordinarily it is not necessary to<br />
test the compressive strength of mix of grade M-150 at it is<br />
generally used for non-structural purposes. However, where<br />
the mix M-150 is used extensively on <strong>works</strong> (i.e. more than<br />
75% cu.mt. of concrete is to be placed at one time in any<br />
work), it shall be tested in the same manner as other grades
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 497<br />
of concrete used for structural purposes. The minimum<br />
strength of various grade of concrete both at the age of 7<br />
days and 28 days are as per I.S. <strong>specifications</strong>.<br />
In the case of concrete of mix M-150 and above, the<br />
Engineer may not insist on the testing of concrete if the<br />
quantity of concrete to be laid on any <strong>particular</strong> day is less<br />
than 10 cu.m. If, however, the quantity excess 10 cu.m. test<br />
specimens must invariably, be taken and sent to the <strong>CIDCO</strong><br />
laboratory for testing.<br />
Specimen shall be made for every sample and three of them<br />
tested for 7 days strength. As mentioned earlier, the 28 days<br />
strength of concrete shall alone form the criteria for<br />
acceptance or rejection of the concrete samples shall be tested<br />
both for 7 days strength as well as 28 days strength at the<br />
start of the work and this shall be continued until the Engineer<br />
is satisfied that a proper relation between the 7 days<br />
compressive strength and 28 days compressive strength is<br />
established, in which case he may decide to relax the<br />
frequency of testing the concrete cubes for the 28 days<br />
compressive strength.<br />
If the average of strength of the specimen tested at the age of<br />
7 or 28 days is not less than the strength specified in I.S.<br />
<strong>specifications</strong>, the tests shall be considered satisfactory, subject<br />
to the condition that only one out of three consecutive test may<br />
give a value less than the specified strength but not less than<br />
90% of the specified strength. If the tests are unsatisfactory,
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 498<br />
the Contractors shall take immediate steps to carry out<br />
remedial measured as may be directed by the Engineer in<br />
respect in respect of such <strong>works</strong> entirely at the risk and cost of<br />
the contractors. Failure of a sample in test may entail partial<br />
or whole demolition of such work, heavy penalties, black-<br />
listing of the contractors concerned and/or such other similar<br />
steps. The results of the tests conducted by <strong>CIDCO</strong> laboratory<br />
shall be taken as final and binding on the contractors. In<br />
case of any disputes, the decision of the Chief Engineer shall<br />
be binding on the contractors.<br />
A record showing the location of test specimen and daily<br />
progress of the work done shall be maintained by the<br />
Engineer in charge and shall be countersigned by the<br />
Contractors or their representatives. In case record maintained<br />
by the Engineer in charge is not signed by the Contractors or<br />
their representative the record kept by the Engineer shall be<br />
considered as correct and binding on the contractors. In case<br />
of any dispute the decision of the Chief Engineer shall be<br />
binding on the contractors.<br />
The <strong>CIDCO</strong> Material Testing Laboratory is at present situated<br />
at Sanpada. The Contractors shall deliver the specimen for<br />
testing at this laboratory at their own cost in their own moulds.<br />
The contractors shall pay usual testing fees for the tests carried<br />
out in the Corporation laboratory. This fees may vary from<br />
year to year, as sanctioned by the competent authority.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 499<br />
b) Consistency-Slump Test<br />
The workability of concrete shall be checked at frequent<br />
intervals. The slump test shall be carried out in accordance<br />
with the standard method given under the I.S. <strong>specifications</strong><br />
mentioned above. The slump shall be as small as practicable,<br />
consistent with the efficient working and compacting of<br />
concrete. The slump shall not exceed 64mm, but the Engineer<br />
may, under exceptional conditions permit greater slump upto<br />
a limit of 150mm.<br />
The standard consistency test shall be applied every time at<br />
each mixture when test cubes are taken for the <strong>works</strong><br />
compressive strength test.<br />
c) Moisture Contents in the aggregates<br />
The moisture contents in the aggregate shall be determined<br />
in the field in accordance with the latest I.S.No.2386 (part-III)<br />
Method of Test for aggregates for concrete.<br />
d) Unit weight of concrete<br />
It shall be determined by passing placing representative<br />
samples of concrete in unit measure capacity and vibrating it<br />
externally by small vibrator or hand compacting to represent<br />
actual placing condition. The top of the concrete shall then be<br />
made truly flush with the top of the mole and the weight of the<br />
concrete per cu.m. determined after curing and drying. The<br />
weight of dry concrete shall be between 2400 to 2625<br />
kg./cu.m.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 500<br />
A complete record regarding various tests carried out at site<br />
and in the laboratory shall be kept by the Engineer. The<br />
contractor shall provide at their own cost all facility for labour,<br />
material, transport etc. required for the proper execution of<br />
the above test.<br />
Any concrete which does not comply with the above<br />
requirement shall be liable for rejection by the Engineer.<br />
Gauge Boxes<br />
Gauge boxes approved type shall be used for measuring sand and<br />
coarse aggregate in required proportion whenever concrete is<br />
allowed to be prepared by mixing the aggregate on volumetric<br />
basis. Such boxes shall be of seasoned timber or steel and shall be<br />
of such size and shape and shall be used in such a manner as to<br />
enable the proportion of the material to be checked readily. The<br />
cement used in concrete is however shall not be used by measuring<br />
it is gauge boxes, but it shall be measured by weight, whatever may<br />
be the type of concrete.<br />
45.3 STORAGE OF MATERIAL<br />
Cement, fine and coarse shall be stored separately at the site of<br />
work in such a manner as to prevent any deterioration of<br />
contamination or admixture of foreign materials. Any material<br />
which has been damaged or is considered defective by the Engineer<br />
shall not be used on the <strong>works</strong> and shall be removed immediately<br />
from the site of <strong>works</strong>.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 501<br />
45.4 MANUFACTURE AND PLACEMENT OF CONCRETE<br />
a) Batching<br />
Whether controlled or ordinary concrete is to be mixed, the<br />
quantity of cement shall be determined by weight. If the<br />
mixers weight per bag is to be used, the same shall be verified<br />
by weighing separately a reasonable number of bags.<br />
Whenever direct use of bagged cement is allowed, one jute<br />
bag of cement shall be considered to contain 50 kg of net<br />
weight of cement. This shall, however, be verified at site by<br />
weighing for which the contractors shall provide an accurate<br />
weighing apparatus on work sites.<br />
Having once decided the mix, the Engineer may permit<br />
further mixing of the aggregate to be done on volumetric<br />
basis for a <strong>particular</strong> batch or stock of aggregate which has<br />
been used in the design of a mix.<br />
The water shall be either measured by volume in calibarated<br />
tanks or weighed.<br />
The volumetric measurement gauge boxes of approved type<br />
as described earlier shall be used for measuring the fine and<br />
coarse aggregate in required proportion.<br />
b) Mixing of Concrete – Trial Mixes<br />
i) Before concreting commences, the Contractor shall, at his<br />
own expense, make trial mixes to determine the mix<br />
proportions required to produce the strength specified for<br />
each class of concrete and for each degree of workability<br />
required.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 502<br />
Only materials which the Contractor intends to used for<br />
concreting on the <strong>works</strong> shall be used in preparing these<br />
mixes.<br />
ii) The workability of each trial mix shall be recorded.<br />
iii) The concrete shall be mixed in a mechanical and/or weigh<br />
batch mixer of adequate capacity. The ingredients shall be<br />
added to each batch of mix by weight, volume or both as the<br />
case may be so as to ensure accurate proportioning. Water<br />
for each batch of concrete shall be measured in a standard<br />
container so as to ensure the same amount of water being<br />
used each time and to during the following mixer charging<br />
operation. The mixing of each batch shall be done for a<br />
period of not less than two minutes or shall continue until<br />
there is a uniform distribution of materials, having the mass of<br />
uniform colour and consistency. Every care shall be taken to<br />
ensure that there is not segregation while unloading the<br />
mixture.<br />
iv) Mixing shall be done as near the place of placement as<br />
possible and adequate shed shall be constructed over the<br />
mixer to protect the discharged concrete from the effect of<br />
direct sun rays. Small additional amount of water, if<br />
necessary, shall be allowed to be added to the mixer to<br />
compensate for any anticipated evaporation losses during<br />
transport.<br />
v) The quantity of water to be added shall be sufficient to allow a<br />
workable mix being made, tamped and virated into all part of<br />
the mould and between the reinforcement.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 503<br />
46.0 DEFECTIVE CONCRETE<br />
The defective concrete shall be cut out and the work reconstructed<br />
with fresh concrete of required quality in the presence of the<br />
Engineer. The concrete thus cut out shall not be reused under any<br />
circumstances. Should any concrete become permanently damaged<br />
due to cracking or broken or damaged from whatever cause or<br />
should any concrete be found defective in quality due to honey<br />
combing or bad workmanship, it shall be removed forthwith and<br />
replaced by concrete of required quality at the cost of the contractors<br />
to the satisfaction of the Engineer.<br />
47.0 CONSTRUCTION JOINTS<br />
a) Construction joint shall be of an approved shape and shall be<br />
vertical or horizontal as required except that in inclined or curved<br />
member the joint shall be at right angle to the axis of the<br />
member. The joints shall be formed only in placed approved by<br />
the Engineer.<br />
b) Construction joints shall be provided in the positions described on<br />
the drawings or elsewhere and where not so described shall be in<br />
accordance with the following. A joint shall be formed<br />
horizontally at the beams meeting at the head of column.<br />
A joints shall be formed in the rib of a large tee beams and all<br />
beams and 25mm below the soffit of the slab. Concrete in a<br />
hunch or a splay on a beam or a brace and in the head of<br />
column.<br />
Where one or more beams meet, shall be placed without joint at<br />
the same time as that in the beams or brace. Concrete in the<br />
splay at the junction of a wall and slab shall be placed without a
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 504<br />
joint, at the same time as that in the slab. Concrete in a beam<br />
shall be placed throughout without a joint, but vertical and at the<br />
middle of the span.<br />
c) Main construction joints are to be keyed by the used of batterns<br />
placed in the concrete and subsequently removed before placing<br />
new concrete against concrete that has already set or hardened,<br />
the face of the old concrete shall be cleaned and roughened and<br />
scum and loose aggregate removed therefrom leaving a surface<br />
of clean exposed aggregate. Immediately before placing the<br />
new concrete the face shall be thoroughly wetted and a coating<br />
of net cement ground applied there to. The new concrete shall<br />
be well rammed against the prepared face before the grout sets.<br />
d) Construction joints in the floor and walls of water retaining<br />
structures are to be formed as specified for other joints and in<br />
additions and approved water stop shall be used. Stop shall be<br />
rubber of P.V.C. not less than 150mm wide and 10mm thick with<br />
concrete in an approved manner and joints in the water stop are<br />
to be bounded/welded together for the full width of the strip.<br />
48.0 PERMANENT JOINTS<br />
a) Expansion joints, contraction joints or other permanent structure<br />
joints shall be approved in the position and of the form as<br />
detailed in drawing and fully described in the Bill of Quantities.<br />
b) Expansion and contraction joints shall be formed by casting the<br />
concrete against the joining material. The material shall be<br />
lightly but securely fixed to the shuttering forming the joint and
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 505<br />
the concrete bonded to the material. During re-fixing shutters<br />
and preparing for the second pour of concrete, all necessary<br />
precautions must be taken to protect the jointing material. The<br />
concrete on the second pour shall be thoroughly compacted<br />
against the material, care being taken with the compacting<br />
vibrators and tools to avoid damage to the material.<br />
c) The sealing of expansion, contraction joints etc. shall be effected<br />
by forming a triangular revete, central over the jointing material.<br />
The jointing material shall be neatly cut back, where necessary to<br />
the rear of the rebate. The rebate shall be primed and sealed<br />
with the approved compound and the face of the sealer pointed<br />
or trimmed to a near straight edged line.<br />
d) Lead transfer joints shall incorporate dowel and/or link bars in<br />
the positions and forms indicated on the drawings. On half of<br />
the dowel or link bar shall be firmly cast and bounded into the<br />
concrete. The second part of the bar cased in the second<br />
concrete pour shall be wrapped with paper fitted with a<br />
cardboard cylinder or painted with an approved bitumen paint to<br />
prevent the establishment of any bond.<br />
49.0 EXPANSION JOINTING MATERIAL<br />
Expansion jointing material shall be supplied in the required<br />
thickness and width required and no multi layer joints will be<br />
permitted. The material shall comprise at an approved cellular<br />
material with a high degree of recovery after crushing and the<br />
material shall be thoroughly impregnated with a suitable<br />
preservative.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 506<br />
50. FORM WORK<br />
a) Material<br />
All form work for concrete <strong>works</strong> shall be made either of planed<br />
and matched timber or M.S. plates. The timber for the form work<br />
shall be hard wood dry and well seasoned. It shall not be so dry<br />
as to absorb water from concrete nor shall it be so green as to<br />
shrink after erection. When steel plates are used for forms, the<br />
plates shall be free from wrinkles, dents, lumps or other<br />
imperfections. The timber boards or steel plates shall have<br />
sufficient thickness to withstand the construction loads and the<br />
pressure exerted by the wet concrete as well as vibration during<br />
placing of concrete. Normally the thickness shall not be less than<br />
38mm for timber and 18 gauge 18 M.S. Plates. However, in<br />
case where depth of concrete to be poured in the formwork is<br />
small, the thickness of timber planks may be reduced in<br />
consultation with the Engineer.<br />
b) All forms shall conform to the shape, lines, dimensions as shown<br />
on the plans of the concrete members. The form <strong>works</strong> shall<br />
include all wedging, bracing, tierod, clamps, stop of boards and<br />
other devices necessary to mould the concrete to the desired<br />
shape. The formwork shall be so constructed as to remain<br />
sufficiently rigid during the placing and compacting of the<br />
concrete and shall with-stand the necessary pressure, ramming<br />
and vibration without any deflection from the prescribed lines and<br />
curves. It shall be properly strutted tight to prevent loss of liquid<br />
slurry from the concrete. It shall be strongly and firmly erected.<br />
The mould shall be planed smooth, free from knots, holes, open<br />
joints and other imperfection. The use of bolts passing through
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 507<br />
concrete members which form parts of any water retaining<br />
structure shall not be permitted for the purpose of securing and<br />
aligning the form work. The form work shall be so arranged as<br />
to permit easy erection initially and later easy removal without<br />
jarring or disturbing the concrete wedges and clamps shall be<br />
used wherever practicable instead of nails.<br />
Where the depth of form work exceeds 1.5 metres, the<br />
contractors shall keep one side partly open, from which the<br />
concrete could be placed and the planking on the open side<br />
could be raised as the work proceeds. This will avoid<br />
segregation of material in concrete and also facilitate its proper<br />
vibration.<br />
Before concrete is placed, all rubbish shall be removed from the<br />
interior of the forms and surface of the forms work in contact with<br />
the concrete shall be cleaned and thoroughly wetted. The inside<br />
surface of the form work shall be treated with a coat of line, oil or<br />
any other material approved by the Engineer. Care shall be<br />
taken to see that the above approved composition is kept out of<br />
contact with the reinforcement. The slab centering shall be<br />
covered with double war water proofing paper or tar paper or<br />
polythene sheet as directed by the Engineer.<br />
c) Waterproof Paper<br />
Waterproof building paper shall comply with B.S. 1521, 1949 for<br />
<strong>road</strong> <strong>works</strong>, it shall be of class ‘B’.<br />
Where no special finish is desired such as slabs, columns in the<br />
reservoir etc. and where form finish is acceptable, the form work<br />
may be prepared out of ‘Anchor’ brand plywood for similar
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 508<br />
material which shall give a good finish to the concrete surface<br />
finish. For work which are of respective nature, such as column<br />
footings, pedestals for pipe pedestal footing. The formwork shall<br />
be fabricated out of steel plates and structurals to obtain uniform<br />
finish throughout the work. In call cases the form work shall be<br />
inspected and approved by the Engineer, before any concreting is<br />
started. The contractors shall however, be solely responsible for<br />
the proper design, adequacy and stability of the formwork. If at<br />
any time in the opinion of the Engineer, the formwork provided is<br />
not considered sufficiently rigid and/or is defective the contractors<br />
shall improve or strengthen the same in such a manner as the<br />
Engineer may direct.<br />
d) Removal of form work<br />
In no circumstances shall forms be stuck off until the concrete<br />
reaches adequate strength as required or without obtaining<br />
permission of the Engineer. All form work shall be removed<br />
without such shock or vibration as would damage to concrete.<br />
Before the soffit and the strats are removed the concrete surface<br />
shall be exposed where necessary in order to ascertain that the<br />
concrete has hardened sufficiently. The responsibility for the<br />
removal of the form work whether whole or part, shall rest<br />
entirely with the contractors who must nevertheless be guided by<br />
the opinion of the Engineer in this regard. The work of striking<br />
and the removal of form work shall be conducted in the presence<br />
of the Engineer and under personal supervision of a competent<br />
foremen in the employment of the contractor.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 509<br />
Generally nothing less than the following times should elapse<br />
between the filling in of the concrete and the removal of the<br />
forms.<br />
i) Vertical sides of slab, beams and columns 48 hours<br />
ii) Bottoms of slabs upto 15 ft/4.6 metre span 7 days<br />
iii) Bottoms of slabs above 15 ft./4.6 metres 14 days<br />
span. Bottom of beams upto 20 ft./4.6 metre<br />
span and Arch rib bottoms upto 20 ft./6 mt.<br />
Span<br />
iv) Bottoms of beams over 20 ft/6 metre span 21 days<br />
and arch rib above 20 ft./6 mt.span<br />
e) Surface treatment and finish<br />
When the form work is struck, all the faces of concrete shall be<br />
smooth and sound, free from voids and air holes. Any roughness<br />
or irregularity on the exposed surfaces shall be immediately filled up<br />
while the concrete is still green with cement ground, cement wash<br />
and/or 1:11/2 cement mortar properly trowelled and finished. Such<br />
patching of the concrete face shall be carried out with the permission<br />
of the Engineer. If the concrete is found honey-combed, the honey<br />
combed protion and whatever surrounding concrete that may be<br />
considered unsatisfactory by the Engineer shall be dismantled and<br />
fresh concrete of proper quality shall be reinstated at contractor’s<br />
cost.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 510<br />
51.0 DRY RUBBLE PACKING<br />
Dry rubble packing shall consist of a layer of uniform thickness of<br />
blue trap stone rubble carefully set on ground properly formed for<br />
the purpose. The stones shall be laid upon their largest face. The<br />
interstices between the rubble stone shall be filled up with stone<br />
chips and the whole packing made compact. If the packing be<br />
required for <strong>road</strong> work or other similar purposes, the layer of rubble<br />
shall be composed of large stones weighing not less than 30 kg.<br />
each. If the packing be required for flooring, the stone shall weigh<br />
not more than 2.25 kg. each.<br />
52.0 BRICK MASONRY WORK<br />
a) Materials<br />
a) Bricks - Bricks to be whole, sound, well burnt, free from cracks<br />
to ring when struck and not to crack or break when soaked in<br />
water or thrown on the ground on their flat face in a saturated<br />
condition from a height of 60 cm, regular in shape and uniform<br />
size. They shall be of the best description obtainable in market<br />
and of the best quality and colour. They shall not absorb water<br />
more than 20 per cent of dry weight when immersed in water<br />
for 24 hours. They shall have a crushing strength of not less<br />
than 35 kg./cm.<br />
iv) Cement - Cement shall conform to the specification detailed in<br />
Clause No.88.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 511<br />
v) Sand - Sand shall conform to the <strong>specifications</strong> detailed in<br />
Clause No.88.<br />
b) Cement Mortar<br />
All cement mortar to be used on this work shall be in proportion as<br />
specified and directed by the Engineer. The ingradient shall be<br />
measured dry, be means of properly made gauge boxes on a<br />
covered platform and shall be thoroughly mixed dry before adding<br />
water to get the required consistency. Only such quantity of mortar<br />
shall be prepared at a time as can be used up immediately. Mortar<br />
after it has begun to set, shall not be allowed to be raked up again,<br />
but shall be rejected and the contractors shall removes the same<br />
from the work site immediately.<br />
c) Workmanship<br />
This brick work shall be carried out in a workman like manner and<br />
in perfect plumb, line and level as required. Brick shall be<br />
thoroughly cleaned, well watered or soaked in water for atleast 12<br />
hours before being used on the work. No broken bricks shall be<br />
permitted to be used except as closers. Good bond shall be<br />
preserved throughout the work both laterally and transversely.<br />
All bed joints shall be horizontal in vertical walls, radial in arches<br />
and at right angles for the slopes in battered walls. In walling, the<br />
courses shall be kept perfectly horizontal and rise in plumb. The<br />
vertical joints shall break joints with the course below and above.<br />
Use of bats shall be avoided as far as practicable. The joint shall be<br />
close and regular and shall not exceed 12mm in thickness. The<br />
bond shall be English Bond unless otherwise permitted by the
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 512<br />
Engineer. The contractor shall provide at their own expense all<br />
moulds, tamplates, centres, scaffolding etc. as may be required for<br />
the proper execution of the work and nothing extra will be paid for<br />
the same.<br />
The mortar used should be stiff. The brick work shall be kept wet<br />
while the work is in progress for atleast seven days after completion,<br />
to the entire satisfaction of the Engineer. On Sundays and Holidays,<br />
when the work is not in progress, the masonry shall be watered<br />
continuously by engaging Bhisties. Watering shall be done carefully<br />
so as not to wash out mortar of the joints. The Engineer shall be at<br />
liberty to engage labours at contractor’s cost to water the work,<br />
should the Contractors fail to do so. Should the mortar perish i.e.<br />
become dry, while or powdery, through neglect in watering, the<br />
work shall be pulled down and rebuilt at contractor’s cost.<br />
The whole of the masonry work shall be carried up at one uniform<br />
level throughout but where breaks are unavoidable, the joint shall be<br />
made in good long steps, raked so as to prevent cracks arising due<br />
to separation of old and new work. All junctions of walls shall be<br />
formed at the time the walls are being built and cross walls shall be<br />
carefully bonded into the main walls.<br />
When new work is to be added to existing structing, the old work<br />
must be prepared to receive new work by roughening and grouting<br />
with a layer of rich mortar and both be carefully bonded together.<br />
During the rains the <strong>works</strong> to be carefully covered without extra<br />
charge so as to avoid mortar being washed away.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 513<br />
d) Colouring of Brick<br />
For colouring bricks, an earthern-ware box shall be provided a few<br />
cm longer each way than a common brick, and half filled with the<br />
liquid of the required description to about the consistency of thick<br />
crean. The brick to be coloured shall be laid on the iron-plate with a<br />
fire underneath and heated to a heat not too great to admit of their<br />
being handled. They are to be taken out one at a time and dipped<br />
into the liquid for a few seconds, and then placed on a table to dry<br />
(which they do in a few minutes). When dry, they are to be lightly<br />
washed in cold water and placed aside to dry agains. The material<br />
for the colouring liquid shall be linseed oil, turpentine and litharage<br />
with the proper colouring matter unless otherwise specified.<br />
Where yellow bricks are required, either Naosari yellow bricks or fire<br />
bricks of uniform colour shall be used.<br />
e) Cement Plaster to Brick Work<br />
Cement plaster shall be provided to brick masonry or rubble<br />
masonry wherever directed by the Engineer.<br />
1. Materials<br />
i) Cement<br />
ii) Sand<br />
Cement shall conform to the <strong>specifications</strong> detailed in<br />
Clause No.88<br />
Sand shall be conform to the <strong>specifications</strong> detailed in<br />
Clause No.88
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 514<br />
2. Cement Mortar<br />
All cement mortar to be used on this work shall be in<br />
proportion as specified and directed. The ingredient shall be<br />
measured dry, by means of properly made gauge boxes, on a<br />
covered platform and shall be thoroughly mixed dry before<br />
adding water to get the required consistency. Only such<br />
quantity of mortar shall be prepared at a time as can be used<br />
up immediately. Mortar, after it has begun to set, shall not be<br />
allowed to be raked up again, but shall be removed from the<br />
work site immediately. Cement mortar shall be used within<br />
30 minutes after if leaves the mixing board or mill.<br />
3. Workmanship<br />
All stone or brick masonry shall be thoroughly wetted and<br />
joints raked to a depth of 12mm and walls washed.<br />
f) Pointing to Brick Work<br />
The whole of the exposed faces of brick work, cut-stone work and<br />
stone-paving when described as to be pointed are to have the joint<br />
raked out to a depth of a 13mm and pointed with cement and sand<br />
(unless otherwise described) in the proportion of one of cement to<br />
one fine sand flush with the face of the work and out straight,<br />
parallel and of uniform width.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 515<br />
The exposed faces of the rubble work are to be similarly pointed<br />
(When described as to be pointed) but the joints shall be raked out<br />
to a depth of 20mm and shall be irregular in direction.<br />
The above description of pointing shall apply generally to all classes<br />
except only as the pointing material which may in certain cases to<br />
be otherwise described in this specification.<br />
g) Bonding of old work with new work<br />
Wherever any new work meets the old, certain portions of the old<br />
work as may be ordered by the Engineer, shall be cut away in order<br />
that the new work may be properly bonded into the old. No<br />
payment will be allowed to the Contractors for cutting away any<br />
portion of the work done under this contract for the purpose of other<br />
similar work, or in such case for bonding and making good the<br />
same as above described.<br />
h) Cutting holes in new work<br />
Wherever any hole or other communication has to be cut into the<br />
wall or made with a drain or a sewer or a manhole or into or with<br />
other masonry, the hole or communication shall be cut or made<br />
neatly to the requisite size and pipe, tail piece, elbow or other article<br />
or work for which it is required shall be neatly and soundly stopped<br />
around with, or built in cement and sand (1 to 1). The rate of<br />
cutting the hole or that for the work for which the communication is
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 516<br />
required shall include the cost of such stopping, that of any making<br />
good that may be required and also that of any arrangements which<br />
the contractors may have to make in order to stop the access of<br />
sewage or water during the execution of their work. No payment<br />
will be allowed to the Contractors for cutting out any portion of the<br />
new work for the purpose of other work under this contract, or in<br />
such case stopping and making good as above described. If the<br />
sewer or the drain into which hole or communication is to be cut is<br />
in a working condition and if there is likely hood of the workman<br />
being exposed to the danger arising from these wage gases, such<br />
work and also that of removing such stop or plug shall be done by<br />
the <strong>CIDCO</strong> staff trained for such work and under the supervision of<br />
a responsible officer as may be directed by the Engineer and the cost<br />
of such work will be borne by the Contractor.<br />
i) Protection of Work from Sun<br />
All cement work, pointing plastering and concrete work shall be<br />
shaded from the sun, and surface kept mostaned until, in the<br />
opinion of the Engineer it is thoroughly set.<br />
j) Definition of Incomplete Work<br />
A line or stretch of pipe sewer (including the excavation thereof and<br />
all other accessories thereto) will be considered incomplete unless<br />
entirely laid jointed and fully tested, encased wherever required the<br />
trenches filled and consolidated, and the manhole at each and
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 517<br />
completely finished with floors, channels cover and all other detail.<br />
A manhole will be considered incomplete unless it is completely<br />
finished as above, and at least one of the lines of pipe sewer to<br />
which it belongs or it attached, is complete as described above.<br />
The Contractors shall have no claim for incomplete work and no<br />
incomplete work will be measured up for payment to the<br />
Contractors.<br />
53.0 MEASUREMENT FOR TRANSPORT OF RUBBLES<br />
Serviceable rock will be permitted to be used for refilling trenches.<br />
The measurement for the items of transport of rubble to specified<br />
distance will be either by lorry measurements or depot measurement<br />
as directed without deducting anything in quantities in excess of the<br />
calculated surplus material to be removed as per excavation item.<br />
54.0 CONTRACTOR TO OBSERVE ALL CONDITIONS<br />
The contractors are <strong>particular</strong>ly directed to observe from the Articles<br />
of Agreement and the Specification what is to be included in their<br />
rate for the several portions of the work and also under what<br />
conditions payments are to be made.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 518<br />
55.0 Providing Lowering, Laying and Jointing RCC, pipe of<br />
NP-2/NP-3 class (spigot/socketed) of various diameter with rubber<br />
ring and cement mortar 1:3 in proper line, level and slope including<br />
curing etc. complete.<br />
55.1 GENERAL :<br />
The item provides for the supply and fixing of the spun concrete<br />
pipes of the specified class and diameter in position for the Cross<br />
Drainage <strong>works</strong> including necessary collars, conveyance and fixing<br />
in cement mortar 1:2.<br />
55.2 MATERIALS :<br />
Concrete pipes shall be of the class and diameter mentioned in the<br />
item and shall comply with I.S. 458-1971.<br />
The collars shall be of the appropriate size for fixing of the concrete<br />
pipes specified on the drawing and shall comply with the I.S. 458-<br />
1971.<br />
55.3 FIXING :<br />
The cement mortar shall comply with the specification No.B.5(a),<br />
proportion of cement to sand being 1:2.<br />
The handling and laying of the concrete pipes shall comply with I.S.<br />
783-1985 code of practice of laying concrete pipes.<br />
The pipes shall be laid to the lines and levels shown on the drawings<br />
and the slope shall be 1 in 100 towards the down stream unless<br />
other slopes are specified on the drawing or as ordered by the<br />
Engineer.<br />
The ends of the pipes shall be flush with face of masonry or bell<br />
mouthed if so indicated on the drawings or ordered by the Engineer.<br />
Pipe of non - standard length may be used when standard length
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 519<br />
pipes do not fit in between the face of walls. Otherwise extra length<br />
of standards pipes may be left projecting beyond face of masonry on<br />
the downstream. Such extra length will not be paid for.<br />
Diversions of the <strong>road</strong> if found necessary, shall be provided<br />
according to BR.1 at the cost of the contractor unless separately<br />
provided in the tender.<br />
The collar joints be cured satisfactorily. Till then the filling around<br />
shall not be done.<br />
55.4 ITEM TO INCLUDE :<br />
1) Supply, conveyance and fixing of the spun concrete pipes<br />
including collars, fixing in cement mortar 1:2 to the line, levels<br />
and slope.<br />
2) All labour materials, use of equipment and tools for<br />
completing the item satisfactorily.<br />
55.5 MODE OF MEASUREMENT & PAYMENT :<br />
The measurement shall be for the length of pipes provided and fixed<br />
with collars from the outside of one face wall to the outside of the<br />
other face wall, limiting the length to that specified in the plan, or<br />
ordered by the Engineer.<br />
The length shall be measured correct up to a centimeter. The rate<br />
shall be inclusive of all the projecting lengths. If any, projections<br />
being ignored in the measurements.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 520<br />
PARTICULAR SPECIFICATIONS<br />
(WATER SUPPLY)<br />
1.0 EXCAVATION OF TRENCHES :<br />
For laying underground pipeline, trenches shall be excavated by the<br />
contractors whenever necessary and as directed by the engineer. If<br />
for any reason, the dimensions of the trenches are required to be<br />
altered from the normal section specified, either to suit the <strong>particular</strong><br />
site conditions or form any special work, the same shall be done<br />
after obtaining permission of the engineer. Depth of trench would<br />
generally, be 1.0 metre but may vary to suit the level and grade of<br />
pipeline. When the pipeline is under a <strong>road</strong>ways, a minimum cover<br />
of 0.9 metre is to be kept. The width of trenches for pipeline shall be<br />
generally restricted to the width shown in the table below.<br />
Diameter of<br />
pipeline in mm<br />
Width allowed in<br />
meter<br />
Depth allowed in<br />
meter<br />
80 0.600 0.800<br />
100 0.600 0.800<br />
125 0.600 0.800<br />
150 0.600 1.100<br />
200 0.650 1.150<br />
250 0.700 1.200<br />
300 0.750 1.250<br />
350 0.800 1.300<br />
400 0.850 1.350<br />
450 0.900 1.400<br />
500 1.000 1.850<br />
600 1.000 2.050<br />
800 1.300 2.500
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 521<br />
b) If pipe is to be laid below <strong>road</strong> where traffic is expected :<br />
Diameter of<br />
pipeline in mm<br />
Width allowed in<br />
meter<br />
Depth allowed in<br />
meter<br />
80 0.600 1.000<br />
100 0.600 1.050<br />
125 0.600 1.050<br />
150 0.600 1.100<br />
200 0.650 1.150<br />
250 0.700 1.200<br />
300 0.750 1.250<br />
350 0.800 1.300<br />
400 0.850 1.350<br />
450 0.900 1.400<br />
500 1.000 1.850<br />
600 1.000 2.050<br />
800 1.300 2.500<br />
c) If pipe is to be laid below footpath or any other <strong>road</strong> with no traffic.<br />
Diameter of<br />
pipeline in mm<br />
Width allowed in<br />
meter<br />
Depth allowed in<br />
meter<br />
80 0.600 0.850<br />
100 0.600 0.900<br />
125 0.600 0.900<br />
150 0.600 0.950<br />
200 0.650 1.000<br />
250 0.700 1.050
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 522<br />
Diameter of<br />
pipeline in mm<br />
Width allowed in<br />
meter<br />
Depth allowed in<br />
meter<br />
300 0.750 1.100<br />
350 0.800 1.150<br />
400 0.850 1.200<br />
450 0.900 1.250<br />
500 1.000 1.700<br />
600 1.000 1.900<br />
800 1.300 2.500<br />
Extra width of trenches over and above the stipulated width shall be<br />
permitted by engineer in writing where either the site conditions<br />
demand it or where wide trenches are necessary for carrying out<br />
special <strong>works</strong> such as making cross connections, fixing<br />
appurtenances, providing anchor blocks etc. Similarly, if for any<br />
reason the engineer orders the depth of trenches to be increase such<br />
as for crossing utilities, the contractor shall do so and shall be paid<br />
for according to the rates quotes.<br />
1.1 For the purpose of measurements, steel tapes and leveling<br />
instruments shall be used to determine the dimensions of excavation<br />
work. The width will be measured at the bottom of the pipe. The<br />
thickness of murum bedding if provided, will be considered<br />
separately. Boulders measuring above 1/20 cubic metre in volume,<br />
met within the excavation will be jointly measured on spot<br />
immediately they are met with and before they are removed. As<br />
soon as they are removed from excavation and measured they must<br />
be broken or disposed off as directed by the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 523<br />
1.2 The bed of trenches shall be prepared to confirm to the typical<br />
section shown in the drawing. In case of earth murum, soft rock,<br />
excavation shall be carried out to such a depth as required to lay the<br />
pipe line on the bed directly. In case of hard rock, murmur, marine<br />
clay or black cotton soil, additional depth of 150 mm will be filled<br />
up with approved earth or murum. The bed of trench shall be well<br />
rammed. The murum or approved earth bedding will be paid<br />
separately under respective items.<br />
1.3 Stacking of excavated material :<br />
All excavated material shall have to be stacked spread within 50<br />
metres form the place of excavation including all lifts, no materials<br />
are to be stacked or spread close to the edge of the trenches. The<br />
Contractor shall stack the material in such a manner as to<br />
accommodate maximum quantity in minimum space. For this<br />
purpose loose materials shall be stacked in enclosure of harder stuff.<br />
Separate shall be made of such materials as can be re-used such as<br />
broken asphalt, good quality rubble etc. Separate stacks shall also<br />
be made of earth and murum which is required for refilling the<br />
trenches <strong>particular</strong>ly for portion around the pipes. The contractor<br />
shall note that a part of excavated materials which will become<br />
surplus after refilling the trenches will have to be carried away for<br />
filling the low lying area. In order to avoid congestion at work site,<br />
the contractors shall carry away the part of the surplus quantities of<br />
earth considered unsuitable for filling right from the start in<br />
consultation with the Engineer. Removal of surplus earth beyond<br />
lead of 50 metres will be measured separately and paid accordingly.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 524<br />
1.4 Breaking of <strong>road</strong> surface ;<br />
The item of excavation shall also cover the cost of breaking <strong>road</strong><br />
surfaces of all types wherever needed including foundation. The<br />
classification of such excavation shall be deemed to be in hard<br />
soil/murum.<br />
1.5 Shoring :<br />
Normally no shoring may be required. However, if due to site<br />
conditions the same is found necessary, the contractor will provide it<br />
wherever it is needed or as directed by Engineer at no extra cost and<br />
deformed timber shall be used for shoring and strutting.<br />
1.6 Dewatering of trenches :<br />
The contractor shall provide and work at his own cost all pumps,<br />
engines and machineries required to keep the trenches during the<br />
excavation, pipe laying etc. clear of water, whether it is sub-soil, soil<br />
water, creek water, storm water or leakage from tanks, wells, drains<br />
sewer pipes and from an other source or reasons. If there should be<br />
nay accumulation of water, no setting out shall be done, no masonry<br />
is to be laid, no concrete is to be deposited, no pipe to be laid and<br />
no measurements to be taken. The pumping shall be continued<br />
during and after excavation of any portion of the work and repeated<br />
as after as the engineer may consider if necessary for inspection,<br />
testing etc. The pump used shall be of adequate capacity. When the<br />
water in the trench is being pumped out across a <strong>road</strong>, care shall be<br />
taken that there is no obstruction to the vehicular traffic. If it is<br />
necessary to make done by the contractor at no extra cost as<br />
directed by the Engineer. The contractor shall get pumped water<br />
discharge into the nearest drain in such a way that it does not
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 525<br />
spread on the <strong>road</strong> surface and provide hindrance to traffic. If this is<br />
not feasible and <strong>road</strong> surface is to be crossed, the contactor shall<br />
restrict the flow to a suitable size pipe under and across the <strong>road</strong>.<br />
The pipe shall be immediately removed on completion of the <strong>works</strong>.<br />
No extra payment will be made for making any such arrangements.<br />
1.7 Supporting of public utilities :<br />
Utilities such as water pipes, drains, sewer, cable etc. encountered<br />
along the alignment shall be temporarily supported throughout the<br />
work by the contractor at their own cost to the satisfaction of the<br />
engineer. In this connection, the contractor may have to contract the<br />
concerned department and in consultation with them take the<br />
necessary precautions. On completion of the pipe laying operations<br />
and before refilling the trench, some of the utilities may have to be<br />
supported permanently by providing 1:2:4 cement concrete as<br />
directed. The concrete supports shall be paid for separately under<br />
the respective item. If any damage is done to the utilities in the<br />
progress of work, the charges for making good the same will be<br />
recovered from the contractor.<br />
1.8 Fencing, watching, lighting :<br />
The contractor shall make proper provisions for protecting the work<br />
by fencing, watch and ward, lighting at night or in any other manner<br />
as may be directed by the Engineer. The fencing shall be of timber<br />
posts securely fixed in the ground not more than 2.5 metres apart.<br />
The contractor shall be held responsible for payment for all claims<br />
for compensation as a result of accident or injury to any person or<br />
property due to improper fencing and inadequate lighting.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 526<br />
1.9 Refilling :<br />
On completion of the pipe laying operation any section for a length<br />
of about 10 mtrs., and while further work is still in progress, refilling<br />
of trenches shall be started by the contractor with a view to throw<br />
open the traffic the portion of the <strong>road</strong>way in which the work is<br />
already over. Only soft earth and murum of good quality obtained<br />
form the excavation and stacked near the work site shall be used for<br />
filling in around the pipes (at least 30 cms. Around) and its-<br />
anchorages. The remaining portion of the trench shall be filled in<br />
with a mixture of hard and soft materials in sufficient quantities if<br />
good earth and murum are not available. Filling shall be done in<br />
layer not exceeding 20 cm. in thickness with adequate watering,<br />
ramming and rolling so as to obtain good compaction. Excavated<br />
materials laying within a distance of 50 mtrs., shall be used for this<br />
purpose. The trenches shall be refilled so as to build up to the<br />
existing ground level. Such refilling work including a lead of 50<br />
mtrs., shall be paid for separately under relevant item in schedule<br />
“A”. The Engineer shall at all times have powers to decide which<br />
portion of the excavated materials shall be used for refilling and<br />
which place of site and in what manner it shall be used.<br />
2.0 Murum Bedding :<br />
In case of hard rock, marine clay and black cotton soil, sand<br />
bedding to a maximum depth of 300 mm shall be provided by the<br />
contractor. The murum bedding shall be done for the full width of<br />
the trench in the portion where such bedding under the pipeline is<br />
necessary. It shall be properly watered and rammed. The murum to<br />
be used shall be as far as possible out of excavated materials only.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 527<br />
3.0 Providing, Laying of Pipes and Jointing :<br />
The Contractor will have to provide pipes and rubber rings after duly<br />
approved by the Engineer in a phased programme immediately after<br />
receiving the work order. The pipes with any defects or cracked<br />
pipes shall be immediately replaced by the contractor. In order to<br />
avoid damage to the pipes especially the spigot end, the pipe should<br />
not be dragged along concrete and similar hard surfaces. Pipes and<br />
specials shall be stacked near to Contractor’s Chowki / site in a<br />
manner so that under no circumstances inconvenience is caused to<br />
other agency or traffic or cause injury to pedestrians.<br />
3.1 The pipes and specials before laying shall be brushed internally<br />
through out the length to remove any soil or stones that may have<br />
accumulated therein. Inside of socket and outside of the spigot shall<br />
be thoroughly cleared.<br />
3.2 The pipes shall be lowered in trenches carefully, in straight and full<br />
length as far as possible. Maximum deviation allowed will 2 ½ %<br />
where the condition demand. CI/DI pipes and specials shall be<br />
allowed to the cut to the required dimensions with the pipe cutting<br />
machine or by hand cut as may be directed by the Engineer.<br />
3.3 (a) On lowering the pipes in trenches, they will have to be jointed by<br />
means of rubber rings (tyton joints). The rubber rings of different<br />
diameters are to be procured and transported to the site by the<br />
Contractors. The Contractors are to ensure that only rubber rings are<br />
allowed for tyton joints. In no circumstances, the Contractor shall be<br />
allowed to lay the pipes in trenches directly. They shall use ropes and<br />
other required supports while laying of pipes.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 528<br />
4.0 PROCUREMENT OF D.I. PIPES, D.I. SPECIALS, SLUICE VALVE,<br />
4.1 D.I. Pipes :<br />
BUTTERFLY VALVE ETC.<br />
4.2 D.I. Specials<br />
Ductile iron pipes of K7/K9 class conforming to IS 8329 – 2000<br />
(Latest version) with cement mortar lining from inside as per ISO<br />
4179 and with Styrene Butadiene Rubber Rings (SBR) for joints.<br />
D.I./C.I. specials shall confirm to IS 9523 and shall be of K-12, K-14<br />
Type. Specials shall have mortar lining from inside as per ISO<br />
4179.<br />
Specials shall be jointed by push on joint by SBR ring on all sides<br />
and cost of specials shall be inclusive of SBR ring. However, if due<br />
the lead joint shall be made and shall be paid separately.<br />
The Contractor will have to procure D.I. Pipes with cement mortar<br />
lining of appropriate thickness as per I.S. to prevent corrosion from<br />
inside as well as to maintain minimum “C” valve of 130, rubber<br />
rings, specials and different types of valves as stated in Schedule<br />
“A”. Cracked pipes, butterfly valves and specials will be rejected.<br />
While loading and unloading pipes etc. shall not be thrown down<br />
from the trucks but must be unloaded to timber skids slowly without<br />
allowing the pipes to bmp against one another. In order to avoid<br />
damage to the pipes specially spigot and pipes shall not be dragged<br />
along the concrete and similar hard surface. The pipes and specials<br />
shall be stacked near to the contractors work chowki / site in a<br />
manner so that under no circumstances inconvenience is caused to<br />
any other agency or to the traffic or cause injury to the pedestrians.<br />
Butterfly valve shall be of relevant I.S. Mark.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 529<br />
5.0 MORTAR LINING<br />
The Contractor shall procure mortar lined D.I. Pipes from inside to<br />
prevent corrosion from inside as well as to maintain minimum “C”<br />
valve of 130. the rate for D.I. pipes also includes labour, material,<br />
machinery, cost of SBR ring etc. in carrying out all operation of<br />
mortar lining the pipes. The mortar lining shall conform to ISO<br />
4179. The maximum size of sand shall be 2.5 mm and clay content<br />
should be kept less than 2%. The proportion of cement and mortar<br />
shall be 1:1.<br />
5.1 The pipes and specials before laying shall be brushed internally<br />
through out the length to remove any soil or stones that may have<br />
accumulated therein. Inside of socket and outside of the spigot shall<br />
be thoroughly cleaned.<br />
5.2 The pipes shall be lowered in trenches carefully, in straight and in<br />
full length as far as possible in accordance with IS 12888-1987.<br />
Maximum deviation allowed will be 2 ½ % degree. Where site<br />
condition demand D.I. Pipes and specials shall be allowed to be cut<br />
to the required dimensions with the help of pipe cutting machineries<br />
or by hand as may be directed by the Engineer.<br />
5.3 (A) On lowering the pipe in trenches, they will have to be jointed<br />
by means of styrene butadiene rings (SBR) conforming to<br />
relevant I.S. Code.<br />
(B) Jointing : Before assembling the joint, the spigot of pipe and<br />
the interior of the socket of the adjacent pipe should be<br />
thoroughly cleaned. Insertion of the SBR i.e. (rubber ring)<br />
conforming to IS 5382 & IS 12820 can be facilitated by the<br />
bulb eating inside the socket.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 530<br />
5.4 The SBR should be wiped clean, fluxed and then placed in the socket<br />
with the bulb towards the back of the socket. The groove in the SBR<br />
must be located on the retaining bed in the socket and the retaining<br />
heel of the SBR firmly bedded on its seating.<br />
5.5 It is necessary to ensure that the SBR fits evenly around the whole<br />
circumstance, removing any bulges which would prevent the proper<br />
entry of the spigot end. In the larger diameters, this operation may<br />
be assisted by forming a second loop in the SBR opposite the first,<br />
then pressing the loops flat one after the other.<br />
6.0 JOINTING OF C.I. / D.I. PIPES, SPECIALS AND APPURTENANCES<br />
BY LEAD<br />
The joint between two D.I. Pipes shall be made by the use of styrene<br />
butudine rings (SBR) while any other joint wherein, rubber rings can<br />
not be used; lead joints shall be made by the Contractor as<br />
specified.<br />
6.1 After the Engineer has checked and certified that pipes, specials and<br />
appurtenances are laid in proper alignment and level, the sterilized<br />
spun yarn of approved quality shall be driven tightly against the<br />
inside base of the socket with suitable tool. A ring of hume rope<br />
covered with clay is wrapped around the pipes at the end of the<br />
socket with suitable tool. A ring of hume rope covered with clay is<br />
wrapped around the pipes at the end of the socket leaving a hole<br />
into which molten lead shall be poured. The lead used shall be soft<br />
and of approved quality consisting of 99.99 % pure lead on analysis<br />
and shall conform to IS 782 of 1962. The average consumption of
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 531<br />
joining materials shall generally be in accordance with IS 3114 of<br />
1965 as amended upto date (Refer Table 1 below ). The contractor<br />
shall bear the expenses if testing the lead in laboratory if demanded<br />
by the engineer. All the jointing material such as spun yarn, pig<br />
lead, jointing tools and melting equipment shall be provided by the<br />
contractor.<br />
Table no.1<br />
LEAD AND SPUN YARD FOR DIFFERENT SIZES OF PIPES<br />
Nominal<br />
diameter of<br />
pipe<br />
(in mm)<br />
Lead joint<br />
(in kg.)<br />
Depth of lead<br />
(in mm )<br />
Yarn /Joint<br />
(in kg.)<br />
80 1.80 45 0.10<br />
100 2.20 45 0.18<br />
125 2.60 45 0.20<br />
150 3.40 50 0.20<br />
200 5.00 50 0.30<br />
250 6.10 50 0.35<br />
300 7.20 55 0.49<br />
350 8.40 55 0.60<br />
400 9.50 55 0.75<br />
450 14.00 55 0.95<br />
500 19.00 65 1.00<br />
600 20.00 65 1.20<br />
700 22.00 65 1.35<br />
(The quality given above is provisional and 20% variation may be allowed)
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 532<br />
6.2 Caulking the joint shall be done after the lead is poured. All excess<br />
lead protruding outside of the socket shall be removed with a flat<br />
chisel and joints caulked number of times (minimum three) all along<br />
the circumferential joints to make the joint watertight. The joint when<br />
completed should be flush, neat and even with the socket. Where the<br />
pipes are not laid in continuous lengths but in stretches, the open<br />
ends of the pipes shall be provided with wooden plug covered with<br />
hession cloth to prevent access to dirt etc. At certain places for<br />
jointing two faces of pipes a collar joint will have to be provided if<br />
directed by the engineer. The collar joint will be paid under the same<br />
rate as for socket and spigot, but collar joint will be treated as two<br />
joints of the spigot and socket type. This item included dewatering of<br />
trenches.<br />
6.3 After completion of pipe laying work in whole length or in parts as<br />
decided by the Engineer, the trench shall be partially filled back<br />
except at the joints before taking up the hydraulic test. In each case<br />
the contractor has to close both ends of the section of pipe line to be<br />
tested either by providing cap, blank flange or by sluice valve as per<br />
directions of the engineer. If necessary both the ends shall be<br />
properly anchored by providing M-20 c.c. blocks of required<br />
dimensions. Payments will be made for providing these c.c. block<br />
under the respective items. Contractor shall provide required<br />
number of plug points with ferrule of required diameters to save as<br />
injection points, air relief points etc. on the completion of the test,<br />
these points shall be closed by the plugs by the contractor. No<br />
separate payment will be made for this. The contractor shall make<br />
necessary arrangement to fill the section of main to be tested by<br />
taking available size connection from existing main nearby or from<br />
any other sources. The charges for water supplied, for making and<br />
removing connection will have to be borne by the contractor only.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 533<br />
6.4 Testing will be carried out by contractors under the guidance of<br />
Engineer. The Contractor shall disinfect the entire pipeline as<br />
directed by the Engineer before carrying out testing. Contractors<br />
shall provide the required machinery, equipments and technical staff<br />
for testing the pipeline. A section of the pipe shall be considered<br />
satisfactory only when leakage is less than 425 litres/25 mm dia<br />
km/day at 9 kg/cm 2 pressure and as per relevant IS. If the first test is<br />
not found satisfactory, repeated tests after the necessary repairs will<br />
be undertaken and procedures as mentioned above shall be<br />
followed.<br />
6.5 When the section of the pipe line is tested successfully, the<br />
Contractor shall back fill the portion as per direction of the Engineer.<br />
The cost of testing the pipe line shall be deemed to have been<br />
included in the cost of laying the pipeline and no separate payment<br />
shall be made as referred above.<br />
7.0 PIPES & APPURTENANCES :<br />
D.I. Pipes (S &S) type and appurtenances such as butterfly valve etc.<br />
shall be supplied by the contractor himself and they himself shall<br />
make their own arrangements to purchase it from market and<br />
transport it to the site of work. The butterfly valve shall consist of all<br />
necessary fittings. The rate includes the cost of materials, cost of<br />
rubber packing, washer, nut bolts etc. which also shall be provided<br />
by the contractors without any extra cost.<br />
7.1 Before procurement of valves, approval shall be taken from Engineer<br />
regarding make and valves shall be tested at manufacture’s factory<br />
before dispatch to site. Before valves are fixed, they shall be cleaned<br />
and greased. It should be seen that all the parts are in perfect
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 534<br />
working condition. The tail pieces shall be jointed to D.I. Pipes by<br />
socket and spigot joints at both ends or by a collar by means of lead<br />
joints and the cost of making socket and spigot joint and the cost of<br />
making lead joints will be paid under respective items.<br />
8.0 Providing and fixing of blank flanges :<br />
The Contractor has to procure blank flanges. The Contractor shall fix<br />
them on the pipe ends, wherever necessary and as directed by the<br />
Engineer. (the blank flanges and caps will be required for closing the<br />
needs for testing the pipe lines shall however to be paid for) The cost<br />
of providing and fixing the blank flanges shall include cost of<br />
transport from stores, loading, unloading, cost of all joining<br />
materials such as nuts, bolts, washers, rubber packing 3 ply white<br />
zinc etc.<br />
9.0 Concrete work :<br />
10.0 Cement :<br />
Concreting will be required to be done for providing a concrete for<br />
thrust blocks, encasing etc. where there are valves, bends etc. in the<br />
pipe line, such concrete will be of M-20 grade and to sizes as<br />
directed by the engineer. The contractor has to make all the<br />
arrangements for the concrete work.<br />
Cement kept at work spot shall not be more than required for a day,<br />
but the contractor shall provide and maintain a proper efficient and<br />
sufficient storage shed for cement near work site at a suitable place.<br />
The floors of the stores/shed shall be raised at least 30cm. above<br />
the ground and will be covered by suitable materials in order to<br />
protect the bags from moisture.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 535<br />
10.1 Fine aggregate :<br />
All fine aggregates shall confirm to IS 383 of 1970 and relevant<br />
portion of IS 515 of 1959. Sand for use in concrete shall be natural<br />
sand or crushed stone screenings. Sand shall be clean, well graded,<br />
hard, strong, durable and gritty particles free from injurious amounts<br />
of dust, clay, kanker, salts, organic matter, lead mica or other<br />
deleterious materials. Sand shall be from “Mahad/Vaitarna” or any<br />
other approve sources.<br />
10.2 Fine aggregates for concrete shall be graded within limits given in<br />
table No. III or Table No.IV, Para 5.2 of IS 383 of latest version.<br />
Fineness modulus shall range from 2.6 to 3.6. Fine aggregate shall<br />
be tested at random by the engineer in accordance with provisions<br />
of IS and result maintained.<br />
10.3 Coarse Aggregate :<br />
10.4 Water :<br />
Coarse aggregate shall consists of broken trap stone and be hard,<br />
strong, dense, clean of proper gradation and free from skin and<br />
coating likely to prevent adhesion to mortar. It shall generally<br />
conform to IS -383 of latest version grading of aggregate shall be in<br />
accordance with specification clause A.7.3 to A.7.5 of “Standard<br />
Specification” of B & C Department, Govt. of <strong>Maharashtra</strong>.<br />
The water shall be clean, free from all acid, alkali, organic or other<br />
deleterious substances. The water requirements shall be strictly<br />
adhered to as per the table No.III of IS-456-2000.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 536<br />
10.5 Mixes of concrete :<br />
10.6 Mixing :<br />
The proportions of ingredient of plain cement concrete are defined<br />
by bulk. All ingredients shall be measured separately and accurately<br />
in properly constructed gauge box.<br />
The plain cement concrete shall be mixed in a machine, mixing by<br />
hand shall not be permitted normally. However, where the quantity<br />
of work is small or permitted by hand mixing, shall be permitted by<br />
the engineer if requested by contractor.<br />
10.7 Placing and compaction :<br />
10.8 Curing :<br />
The concrete shall be mixed and place in position, compacted and<br />
finished within 30 minutes of mixing. Compaction of plain concrete<br />
may be with vibrators or otherwise at the direction of the Engineer.<br />
The detailed procedure of the work shall be as per Clause No.B6.6,<br />
B.6.7 and B.6.8 of “Standard Specifications of B & C Department of<br />
Government of <strong>Maharashtra</strong>”.<br />
Concrete shall be protected from damage, excessive heat, rain etc.<br />
and covered with wet Hussein or some absorbent materials soon<br />
after initial set. After final set the concrete shall be kept wet for a<br />
period of not less than 14 days the date of placing.<br />
10.9 Keeping records :<br />
Contractor shall maintain a record approved by the Engineer at site<br />
of work containing the following details / information.<br />
a) Daily receipt of cement and use of cement in various items.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 537<br />
b) Time of starting of concrete work and closure.<br />
c) Number of batches through mixer, source of water cement<br />
ratio;<br />
d) Dates of erection of form work, passing of form work and<br />
11.0 Brick masonry :<br />
striking of form work in any.<br />
11.1 Burnt bricks shall be the best available locally and kiln burnt, the<br />
minimum compressive strength shall be 40 kg/cm 2 . Brick shall<br />
confirm to following requirements.<br />
a) Sound, hard, well burnt, sharp edges, uniform size and shape,<br />
free from cracks, stone, modules of lime etc.<br />
b) Uniform in colour, should give metallic ring when struck<br />
together.<br />
c) Shall not be over or under burnt, broken or cracked.<br />
d) Bricks shall be tested as per IS 3495 of 1966 if required by<br />
Engineer.<br />
e) Sizes and tolerance of brick shall be as in “Standard<br />
Specification” of B & C Department, government of<br />
<strong>Maharashtra</strong>.<br />
11.2 All brick work except half brick wall shall be as in English bond<br />
unless otherwise directed. Half brick wall shall be in stretcher bond.<br />
Bed joints in brick work shall not exceed 10 mm.<br />
Brick work shall be built in uniform layers and should not be raised<br />
more than 1 mtr., above another at any time. Coarse shall be<br />
aligned, repaired, maintained, quoins, jambs and other angles<br />
plumbed and the whole brick work properly bonded as the work<br />
proceeds.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 538<br />
11.3 Joints of brick work shall be squarely raked out to depths of not less<br />
than 1 cm. as the work proceeds. After raking, surfaces shall be<br />
cleaned with wire brush and washed with water before plastering.<br />
11.4 All brick work shall be built in cement mortar 1:4 as specified in<br />
Schedule –“A” item.<br />
11.5 Tops of walls having P.C.C. for fixing C.I./R.C.C. cover shall be<br />
finished with a layer of cement mortar (1:4) 20mm thick.<br />
12.0 Construction of B.B. Masonry Chamber, supplying and fixing RCC<br />
frame and cover and <strong>road</strong> box :<br />
This item includes all materials and labour mentioned hereafter,<br />
bricks <strong>road</strong> box, RCC Cover, excavation, laying cement concrete,<br />
B.B. masonry, plastering and refilling, fixing of box so that the top of<br />
the box shall be 100mm above the ground level. The necessary<br />
locking arrangement and lock to be made for S.V. chamber cover.<br />
The precast for RCC cover (heavy duty) shall be tested in any<br />
approved laboratory and the results got approved before fixing the<br />
same.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 539<br />
SPECIFICATIONS FOR READY MIX CONCRETE<br />
1.1 Batching of Concrete ingredients:<br />
For all concreting, only Ready Mixed Concrete (RMC) manufactured<br />
at site is mandatory, weigh batching plant or obtained from<br />
approved R.M.C. supplying agencies or produced at site using<br />
mechanical mixers and weigh batchers as per item description, will<br />
be used. The R.M.C. supplying agency will supply mix design details<br />
in advance before start of delivery.<br />
1.2 Transporting, placing, compacting, finishing and curing:<br />
Transporting, placing, compacting, finishing and curing of concrete<br />
shall be in accordance with IS: 456-2000.<br />
1.2.1 Transporting:<br />
1.2.2 Placing:<br />
For all RMC concreting, the concrete after discharge from batching<br />
plant will be loaded in transit mixers and kept continuously agitated<br />
while mix is in transit. At destination the mix will be unloaded in to<br />
the hoppers of concrete pump. For site made concrete suitable<br />
prescribed methods shall be adopted.<br />
The concrete produced in RMC plant/batching plant, when<br />
discharged from transit mixer in pump hopper shall be kept<br />
continuously agitated and pumped to destination placing point. Site<br />
made concrete shall be placed by approved method of placing. The<br />
height of any single lift of concrete shall not exceed 1.5 m for walls<br />
and 2.0 m for columns. For columns where the height of pour is<br />
more than 2.0 m, suitable arrangement in formwork should be
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 540<br />
made so that the vertical drop of concrete is restricted to less than<br />
2.0 m. Any such arrangement should be approved from the<br />
engineer in advance before execution.<br />
High velocity discharge of concrete causing segregation of mix shall<br />
be avoided. The concrete shall be placed in the forms gently and<br />
not dropped from the height exceeding 1.5m except in columns<br />
where the maximum allowed will be 2.0 m. Each batch of concrete<br />
will be placed in layer. Each layer of concrete shall be compacted<br />
fully before the succeeding layer is placed and separate batches<br />
shall be placed and fully compacted before the layer immediately<br />
below has taken initial set. The layers should be sufficiently shallow,<br />
to permit stitching of two layers together by vibration.<br />
Concreting of any portion or section of the work shall be carried out<br />
in one continuous operation and no interruption of concreting work<br />
will be allowed without approval of the Engineer.<br />
Plain concrete in foundations shall be placed, in direct contact, with<br />
the bottom of excavation, the concrete being deposited in such a<br />
manner, as not to get mixed with the earth. The concrete placed<br />
below the ground level shall be protected from falling earth during<br />
and after placing. Concrete placed in ground containing deleterious<br />
substances, shall be kept free from contact, with such ground and<br />
with water draining there from during placing and for a period of 7<br />
days or otherwise instructed there after. Approved means shall be<br />
taken to protect immature concrete from damage by debris,<br />
excessive loading, abrasion, vibrations, deleterious ground water,<br />
mixing with earth and other materials and other influences, that may<br />
impair strength and durability of concrete.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 541<br />
Before starting of work contractor will get the concrete pouring<br />
programme and its sequence approved by Engineer to avoid cold<br />
joints.<br />
1.2.3 Compaction:<br />
External, Internal (needle) and surface (screed board) vibrators of<br />
approved make shall be used for compaction of concrete.<br />
a) External/internal vibrators shall be used for compaction of concrete<br />
in foundations, columns etc. For sections such as slabs, the concrete<br />
shall be compacted by external, internal and surface type vibrators,<br />
depending on the thickness of layer to be compacted. 25 mm,<br />
40mm and 60mm dia internal vibrators may be used. The concrete<br />
shall be compacted by use of appropriate diameter vibrator by<br />
holding the vibrator in position until:<br />
i) Air bubbles cease to come to surface<br />
ii) Resumption of steady frequency of vibrator after short period<br />
of dropping the frequency, when the vibrator is first inserted.<br />
iii) The tone of the vibrator becomes uniform<br />
iv) Flattened, glistening surface, with coarse aggregated particles<br />
blended into it, appears on the surface.<br />
After the compaction is completed, the vibrator should be<br />
withdrawn slowly form concrete so that concrete can flow in to<br />
the space previously occupied by the vibrator. To avoid<br />
segregation during vibration, the vibrator shall not be<br />
dragged through the concrete nor used to spread the<br />
concrete. The vibrator shall be made to penetrate into layer of<br />
fresh concrete below if any, for a depth about 150mm. The<br />
vibrator shall be made to operate at regular pattern of<br />
spacing. The effective radii of action will overlap,<br />
approximately half a radius to ensure complete compaction.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 542<br />
1.2.4 Curing:<br />
v) To secure even and dense surfaces free from aggregate<br />
pockets, vibration shall be supplemented by tamping or<br />
rodding by hand in the corners of forms and along the form<br />
surfaces while the concrete is plastic.<br />
vi) A sufficient number of spare vibrators shall be kept readily<br />
accessible to the place of deposition of concrete to assure<br />
adequate vibration in case of breakdown of those in use.<br />
25mm diameter immersion vibrators shall be used in thin<br />
sections upto 125mm, 40mm diameter immersion vibrators in<br />
fairly wide sections like beams, slabs, columns etc. and 60mm<br />
diameter vibrators in foundation, pilecaps or such large<br />
section members. Screed vibratos shall also be used for slab<br />
concreting.<br />
vii) Plain concrete also shall be vibrated whenever and wherever<br />
directed by EIC to achiever full compaction, using needle and<br />
screed vibrators as necessary.<br />
Curing shall be started at the earliest by spreading wet jute cloth<br />
(hessian) and cover top with impervious sheet and subsequently<br />
cured with spraying water. In inaccessible area to start with, curing<br />
be started by spraying curing compound before starting membrane<br />
curing.<br />
1.3 Placing temperatures :<br />
During extreme hot weather, the concreting shall be done as per<br />
procedures set out in IS: 7861, Parts I & II.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 543<br />
Fine and coarse aggregates concreting shall be kept shaded and the<br />
concrete aggregates sprinkled with water for a sufficient time before<br />
concreting, in order to ensure that the temperature of these<br />
ingredients is as low as possible prior to batching. The mixer and<br />
batching equipment shall be also shaded and if necessary painted<br />
white in order to keep their temperatures as low as possible. The<br />
placing temperature of concrete shall be as low as possible in warm<br />
weather and care shall be taken to protect freshly placed concrete<br />
form over heading by sunlight in the first few hours of its laying. The<br />
time of day selected for concreting shall also be chosen so as to<br />
minimize placing temperatures. In case of concreting in exceptionally<br />
hot weather the Engineer may in his discretion specify the use of ice<br />
either flaked and used directly in the mix, or blocks, used for chilling<br />
the mixing water. In either case no extra payment shall be made to<br />
the contractor on this account.<br />
1.4 Construction joints :<br />
Construction joints in all concrete work shall be made as directed by<br />
the Engineer. Where vertical joints are required, these shall be<br />
shuttered as directed and not allowed to take the natural slope of the<br />
concrete.<br />
Before fresh concrete is placed against a vertical joint, the old<br />
concreter shall be chipped/sand blasted, cleaned and moistened 25<br />
hours before placing the concrete. All standing water should be<br />
removed and dried with compressed air. Neat cement slurry shall<br />
be applied on the chipped/sand blasted surface and mortar of the<br />
same water cement ratio as the concrete and 10mm thick applied.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 544<br />
Where required suitable expansion joints shall also be provided as<br />
directed by the Engineer.<br />
The time of day selected for concreting shall also be chosen so as to<br />
minimize placing temperatures. In case of concreting in exceptionally<br />
hot weather the Engineer may in his discretion specify the use of ice<br />
either flaked and used directly in the mix or blocks used for chilling<br />
the mixing water. In either case the cost of ice either flaked and used<br />
directly in the mix or blocks used for chilling the mixing water. In<br />
either case the cost of ice and additional labor involved in weighing<br />
and mixing etc. shall be borne by the contractor and noting will be<br />
paid on this account.<br />
1.5 Defective Concrete :<br />
Should any concrete be found honeycombed or in any way defective,<br />
such concrete shall on the instruction of the Engineer be cut out by<br />
the Contractor and made good at his own expenses.<br />
1.6 Exposed Faces, Holes and Fixtures :<br />
On no account shall concrete surfaces be patched or covered up or<br />
damaged concrete rectified or replaced until the Engineer or his<br />
representative has inspected the <strong>works</strong> and issued written instructions<br />
for rectification. Failure to observe this procedure will render that<br />
portion of the <strong>works</strong> liable to rejection; in which case it will be<br />
treated as a work which has failed to meet specified strength<br />
requirements and dealt with according to Clause 1.11.<br />
Holes for foundation or other bolts or for any other purposes shall<br />
be moulded, and steel angles, holdfasts or other fixtures shall be<br />
embedded, according to the drawings or as instructed by the<br />
Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 545<br />
1.7 Cracks:<br />
1.7.1 If cracks develop in concrete construction which in the opinion of the<br />
Engineer may be detrimental to the strength of the construction, the<br />
contractor at his own expense shall test the slab or other construction<br />
as specified in Special Conditions. If under such test loads the<br />
cracks develop further, the Contractor shall dismantle the<br />
construction, carry away the debris, replace the construction and<br />
carry out all consequential work thereto, without nay extra payment.<br />
1.7.2 If any cracks develop in the concrete construction, which in the<br />
1.8 Finishes:<br />
opinion of the Engineer, are not detrimental to the strength of the<br />
construction, the contractor at his own expense shall grout the cracks<br />
with polymer cement grout of approved quality at his own expense<br />
and risk and shall make good to the satisfaction of the Engineer the<br />
surface finish which in the opinion of the Engineer has suffered<br />
damage either in appearance or stability owing to such cracks. The<br />
Engineer’s decision as to the extent of the liability of the Contractor<br />
in the above matter shall be final and binding.<br />
Unless otherwise instructed the face of exposed concrete placed<br />
against formwork shall be rubbed down immediately on removal of<br />
the formwork to remove irregularities. The face of concrete for<br />
which formwork is not provide other that slabs shall be smoothed<br />
with a float to give a finish equal to that of the rubbed down face,<br />
where formwork is provided. The top face of a slab which is not<br />
intended to be covered with other materials shall be leveled and<br />
floated to a smooth finish at the levels or falls shown on the<br />
drawings or as directed. The floating shall be done so as not to
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 546<br />
bring as excess of mortar to the surface of the concrete. The top<br />
face of a slab intended to be surfaced with other materials shall be<br />
left with a spaded finish. Face of concrete intended to be plastered<br />
shall be roughened by approved means to form a key.<br />
When at site, concrete cube testing machine is used 10% of the<br />
cubes should be tested at independent recognized laboratories<br />
approved by Engineer at their cost.<br />
1.9 Scope of work & item to include:<br />
1. The item refer to ready mix concreter required for<br />
R.C.C./P.C.C. <strong>works</strong> as mentioned in item description under<br />
Schedule –‘A’ procured form reputed manufacturer approved<br />
by Engineer. The material shall be conforming to B-7 refer<br />
page No.38 for controlled cement concrete. (Standard<br />
Specifications of PWD, Vol-I)<br />
The material requirement shall be completed according to<br />
Standard Specifications No.B.7.1 refer Page No. 38 for<br />
controlled cement concrete.<br />
2. The item include manufacturer with ingredients, control<br />
temperature, transportation, pumping, placing, vibration and<br />
curing of Ready Mix Concrete and all taxed, excise duty, sales<br />
tax, octroi, insurance etc. levied by Govt./Semi-Govt./local<br />
authority and cost of ready mix concrete and any penalty,<br />
additional charges for controlling temperature upto casting or<br />
any other charges levied by the manufacturer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 547<br />
3. Proportioning of the mix/mix design shall be decided by the<br />
contractor/RMC manufacturer to achiever strength specified in<br />
item and shall be get approved by Engineer. The<br />
proportioning of ingredients, use of ingredients and mix<br />
designs parameters for various slumps shall be got approved<br />
by Engineer prior to mix design.<br />
4. Scaffolding shall conform to <strong>specifications</strong> No. B.6.5(a) and<br />
got approved by the Engineer.<br />
5. Forms shall conform to <strong>specifications</strong> No. B.6.5(b).<br />
6. The concrete shall be pumped to the final positions as quickly<br />
as possible by methods which will prevent segregation and<br />
loss of ingredients.<br />
7. The concrete shall be placed into its final position, compacted<br />
and finished within 30 minutes of mixing the water and before<br />
initial setting commences. The method of placing shall be<br />
such as to avoid segregation. Placing shall be done in<br />
balanced manner to avoid eccentric loads on the form work.<br />
As far as possible the concreting shall be done continuously<br />
and construction joints avoided.<br />
If the area to be concreted is under water, the water shall be<br />
removed by bailing out or using pumps and other devices.<br />
8. Compaction shall be done by mechanical vibrators and also<br />
by rods so that a dense concrete is obtained.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 548<br />
1.10 Testing:<br />
9. The concrete shall be adequately cured.<br />
10 Immediately after the removal of forms, any undulations,<br />
depressions, cavities, honey combing broken edges of corners<br />
height spot defects shall be made good and finished with<br />
cement mortar 1:2. But necessity of such finishing must be<br />
exceptional and the total not exceed 1% on average.<br />
11. Concrete which is partially hardened shall not be tempered or<br />
re-mixed but shall be disposed off as desirable.<br />
12 Sampling and testing shall be done as per I.S. 456 (latest<br />
version).<br />
13. All labour, materials use of equipment, tools and plant,<br />
installing and removal of scaffolding, flase work and forms<br />
and branching necessary for the satisfactory completion of<br />
item,<br />
14. Compensation for injury to persons and damage to work or<br />
property.<br />
15. Establishment of site laboratory.<br />
Cubes of 15 cm x 15 cm size shall be cast on the first day and tested<br />
for compression at 7 and 28 days. Later on, if the Engineer so<br />
directs, 6 cubes shall be tested for every 60 cubic meters of the<br />
concrete casted.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 549<br />
1.11 Measurement :<br />
Concrete and reinforcement shall be paid separately unless<br />
otherwise specified.<br />
The Contract rate shall be for a unit of one cubic meter of concrete.<br />
The concrete shall be measured for its length, breadth and depth<br />
limiting dimensions to those specified on the drawings or as ordered<br />
by the Engineer.<br />
The Volume of concrete measured shall include that occupied by<br />
1) Reinforcement and other metal sections.<br />
2) Cast in components each less than 0.01 M 3 in volume.<br />
3) Rivetts, fillets or internal splays each less than 0.005 M 2 in<br />
cross sectional area.<br />
4) Pockets and holes not exceeding 0.01 M 3 in volume.<br />
5) Rates for precast concrete shall include demoulding, handling,<br />
storing, transporting and erecting at site, including all<br />
clamping, bolting, bracing that may be required during<br />
erection, including erection equipment.<br />
1.11.1 In order to exercise the required degree of constant control over the<br />
concrete materials and their proportions, the contractor shall set up<br />
and maintain at his own expense a testing laboratory at site. He<br />
shall provide all apparatus required for sensitive testing of concrete<br />
and concrete materials. In <strong>particular</strong> he must have the following<br />
equipment set up in the site laboratory.<br />
i) A set of Standard Sieves<br />
ii) Sieve shaker<br />
iii) Measuring Cylinders
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 550<br />
iv) Slump Cones<br />
v) Adequate number of Standard Moulds<br />
vi) Weighing Balance<br />
vii) Curing tank for cubes<br />
viii) Concrete cube testing machine 200 T. Capacity must be<br />
electricity operated<br />
Any other apparatus deemed necessary by the Engineer for proper<br />
control shall be provided by the Contractor at his own expense. The<br />
laboratory shall be staffed by qualified technicians.<br />
When at site, concrete cube testing machine is used 10% of the<br />
cubes should be tested at independent recognized laboratories<br />
approved by Engineer at contractor’s cost.<br />
1.12 Ready-Mixed Concrete and Pumping Concrete<br />
1.12.1 Ready-mixed concrete may be manufactured in a central automatic<br />
weight Batching plant and transported to the job in agitating transit<br />
mixer.<br />
The maximum size of coarse aggregate shall be limited to one-third<br />
of the smallest inside diameter of the hose or pipes used for<br />
pumping. Provision shall be made for elimination of over-sized<br />
particles by screening or by careful selection of aggregated. To<br />
obtain proper gradation it may be necessary to combine and blend<br />
certain fractional sizes to aggregates. Uniformity of gradation<br />
throughout the entire job shall be maintained.<br />
The quantity of coarse aggregate shall be such that the concrete can<br />
be pumped, compacted and finished without difficulty.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 551<br />
1.12.2 Fine aggregates:<br />
The gradation of fine aggregate shall be such that 15 to 30 percent<br />
should pass the 0.30 mm screen and 5 to 10 percent should pass<br />
0.15mm screen so as to obtain a pumpable concrete. Sands that<br />
are deficient in either of these two sizes should be blended with<br />
selected finer sands to produce these desired percentages. With this<br />
gradation, sand having a fineness modulus between 2.4 and 2.8 are<br />
generally satisfactory. However, for uniformity, the fineness modulus<br />
of the sand should not vary more that 0.2 from the average value<br />
used in proportioning.<br />
1.12.3 Water, Admixtures and slump:<br />
The amount of water required for proper concrete consistency shall<br />
take into account the rate of mixing, length of haul, time of<br />
unloading and ambient temperature conditions.<br />
Additions of water to compensate for slump loss should not be<br />
resorted to nor should the design maximum water-cement ratio be<br />
exceeded. Additional dose of retarder/plasticizer/superplasticizer<br />
shall be used with prior approval of Engineer to compensate the loss<br />
setting time and slump at contractor’s cost. Retempering water shall<br />
not be allowed to be added to mixed batches to obtain desired<br />
slump.<br />
1.12.4 Transportation:<br />
The method of transportation used should efficiently deliver the<br />
concrete to the point of placement without significantly altering its<br />
desired properties with regard to water-cement ratio, slump, and<br />
homogeneity.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 552<br />
The revolving-drum truck bodies of approval make shall be used for<br />
transporting the concrete. The number of revolutions at mixing<br />
speed, during transportation, and prior to discharge shall be<br />
specified and agreed upon. Reliable counters shall be used on<br />
revolving-drum truck units. Standard mixer uniformity tests,<br />
conforming to ASTM standards C 94-69 “Standard Specifications for<br />
Ready Mix Concrete”, shall be carried out if desired by Engineer to<br />
determine whether mixing is being accomplished satisfactorily.<br />
1.12.5 Pumping of Concrete:<br />
Only approved pumping equipment, in good working condition,<br />
shall be used for pumping of concrete. Concrete shall be pumped<br />
through a combination of rigid pipe and heavy-duty flexible hose of<br />
approved size and make. The couplings used to connect both rigid<br />
and flexible pipe section shall be adequate in strength to withstand<br />
handling loads during erection of pipe system, misalignment, and<br />
poor support along the lines. They should be nominally rated for at<br />
least 3.5 Mpa pressure and greater for rising runs over 30m.<br />
Couplings should be designed to allow replacement of any section<br />
without moving other pipe sections, and should provide full cross<br />
section with no construction of crevices to disrupt and smooth flow of<br />
concrete.<br />
All necessary accessories such as curved sections of rigid pipe, swivel<br />
joins and rotary distributors, pin and gate valves to prevent backflow<br />
in the pipe line, switch valves to direct the flow into another pipe line,<br />
connection device to fill forms from the bottom up, extra strong<br />
couplings for vertical runs, transitions for connecting different size of<br />
pipe, air vent for downhill pumping, clean-out equipment etc. shall<br />
be provided as and where required. Suitable power controlled<br />
booms or specialized crane shall be used for supporting the pipe<br />
line.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 553<br />
1.12.6 Field control:<br />
1.13 Planning:<br />
Sampling at both truck discharge and point of final placement shall<br />
be employed to determine if any changes in the slump and other<br />
significant mix characteristics occur. However, for determining<br />
strength of concreter, cubes shall be taken from the placement end<br />
of line. The RMC supplier should nominate a technically qualified<br />
representative at site for sampling, testing and placing of concrete.<br />
Proper planning of concreter supply, pump locations, line layout<br />
placing sequence and the entire pumping operation shall be made.<br />
The concreter production, transportation and placing shall be<br />
planned in such a manner that duration between addition of water<br />
during mixing and placing of concrete in desired location is well<br />
within time limits prescribed by the RMC manufacturer, however, this<br />
is subjected to fulfillment of slump and other properties of concrete<br />
as specified in tender. On failure to adherer to the time schedule by<br />
the Supplier the Engineer may reject the concrete.<br />
The pump wherever used should be as near the placing area as<br />
practicable, and the entire surrounding area shall have adequate<br />
bearing strength to support concrete delivery pipes. Lines from<br />
pump to the placing area should be laid out with a minimum of<br />
bends. For large spacing areas alternate lines should be installed<br />
for rapid connection when required. Standby power and pumping<br />
equipment should be provided to replace initial equipment, should<br />
breakdown occur.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 554<br />
The placing rate should be estimated so that concrete can be<br />
ordered at an appropriate delivery rate.<br />
As a final check, the pump should be started and operated without<br />
concrete to be certain that all moving parts are operating properly.<br />
A grout mortar should be pumped in to the lines to provide<br />
lubrication for the concrete, but this mortar shall not be used in the<br />
placement.<br />
When the form is nearly full and there is enough concrete in the line<br />
to complete the placement, the pump shall be stopped and a go-<br />
devil inserted and shall be forced through the line by water under<br />
pressure to clean it out. The go-devil should be stopped at a safe<br />
distance from the end of the line so that the water in the line will not<br />
spill into the placement area. At the end of placing operation, the<br />
line shall be cleaned in the reverse direction.<br />
SUBMISSION OF DOCUMENTS FROM RMC MANUFACTURER<br />
Following document shall be submitted by the RMC manufacturer to<br />
<strong>CIDCO</strong> through the contractor along with checklist for RMC<br />
specified in the tender document.<br />
1. Design Mix<br />
2. Manufacturer’s Test Certificate for cement and plasticizer<br />
3. Lab test certificates for all ingredient of concrete.<br />
4. Delivery docket sheet mentioning the grade of concrete,<br />
quality of ingredient used, slump, transit mixer vehicle no.<br />
placement, location, time of concrete produce and placing<br />
etc.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 555<br />
1.14 Reinforcement:<br />
1.14.1 Steel:<br />
List of Bureau of Indian Standard Code of Practice (ISI)<br />
432 - Mild steel and medium tensile steel bars and hard<br />
drawn steel wire for concrete.<br />
1786 - Specifications for HYSD bars and wires for concrete<br />
reinforcement<br />
250 - Code of practice for bending and fixing of bars for<br />
concrete reinforcement<br />
2751 - Recommended practice for welding of mild steel<br />
reinforcement.<br />
Mild Steel, rounds conforming to IS: 432, HYSD bars conforming to<br />
IS: 1139, Cold twisted bars conforming to IS: 1786. Any other steel<br />
specified for reinforcement shall conform in every respect to the<br />
latest relevant Indian Standard Specifications and shall be of tested<br />
quality under the ISI Certification Scheme.<br />
All reinforcing work for concrete work shall be executed in<br />
conformity with the drawings supplied and instructions given by the<br />
Engineer and shall generally be carried out in accordance with the<br />
relevant Indian Standard Specifications (IS: 2502)<br />
1.14.2 Inspection of Testing:<br />
Every bar shall be inspected before assembling on the work and any<br />
defective, brittle, excessively rusted for burnt bars shall be removed.<br />
Cracked ends of bars shall be cut out. Specimens sufficient for three<br />
Tensile Tests per 20 tonnes of bars and for each different size shall<br />
be sampled and tested by the Contractor. Batches shall be rejected if<br />
the average results of each batch are not in accordance with the<br />
<strong>specifications</strong>.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 556<br />
1.14.3 Lapping:<br />
i) As far as possible bars of the maximum length available shall<br />
be used. Laps shown on drawings or otherwise specified by<br />
the Engineer will be based on the use by the contractor of bars<br />
of maximum length. In case the contractor wished to use<br />
shorter bars, laps shall be provided at the contractors cost in<br />
the manner and at the location approved by Engineer.<br />
ii) As and when necessary welded laps shall be provided as<br />
specified by the Engineer.<br />
1.14.4 Spacing, supporting and Cleaning:<br />
i) All reinforcement shall be placed and maintained in the<br />
position shown on the drawing.<br />
ii) The contractor shall provided approved type supports as<br />
specified on the drawings for maintenance the top bars of the<br />
slab in position during concreting. All cover blocks shall be<br />
concrete (not and cement mortar) and of the same strength as<br />
that of the surrounding concrete and properly compacted.<br />
iii) 17 SWG GI wire shall be used as binding wire. All bars<br />
crossing one another shall be bound with this wire twisted<br />
tight to make the skeleton or network rigid so that the<br />
reinforcement is not displaced during placing of concrete.<br />
iv) Bars must be cleaned before concreting commences of all<br />
scales, rust or partially set concrete which may have been<br />
deposited during placing of concrete in previous lift of<br />
concrete.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 557<br />
The bars shall be cleaned with dry gunny bags if they are coated<br />
lightly with rust or other impurities. On no account shall the bars be<br />
oiled or painted nor shall mould oil used on the framework be<br />
allowed to come in contact with the bars. Cement wash to bars shall<br />
not be permitted.<br />
1.14.5 Welding:<br />
i) Whenever specified all welding shall be carried in accordance<br />
with IS: 2751. Only qualified welders shall be permitted to<br />
carry out such welding.<br />
ii) For cold twisted reinforcement, welding operation must be<br />
1.14.6 Measurement:<br />
controlled to prevent supply of large amount of heat greater<br />
than that can be dissipated. The extreme non twisted end<br />
portion shall be cut off before welding. Electrodes with rutile<br />
coating should be used.<br />
i) The weight of steel to be paid for at the contract rates shall be<br />
the weight of bars as mentioned on the drawing or as<br />
instructed by the Engineer including stirrups, ties, spacer bars,<br />
chairs and any other steel <strong>works</strong> specified as reinforcements<br />
but excluding welding and cover blocks. Laps as specified on<br />
the drawing shall be paid for. Laps required because of the<br />
contractor’s use of shorter bars will not be paid for.<br />
ii) The weight of any stirrups and tie bar shall be computed from<br />
the dimension given on the drawings or bending schedules.<br />
The weight in Kg/metre shall be taken as 0.785 kg/metre per<br />
100 mm 2 of cross section. No allowance in the weight paid<br />
for shall be made for the rolling margin.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 558<br />
1.15 FORMWORK<br />
1.15.1 Definition:<br />
4990 - Specification for plywood for concrete shuttering work.<br />
3696 - Safety code of scaffolds and ladders<br />
4014 - Steel and tubular scaffoldings.<br />
8989 - Safety code for erection of concrete framed structures.<br />
456 - Code of practice for plain and reinforced concrete.<br />
The term “Formwork” or “Shuttering” shall include all forms,<br />
moulds, sheeting, shuttering planks, walers, poles, posts, shores,<br />
struts and strutting, ties, uprights, wallings, steel rods, bolts, wedges<br />
and all other temporary supports to the concrete during the process<br />
of setting.<br />
1.15.2 Materials :<br />
1.15.2.1 All facing formwork to come in contact with concrete in different<br />
elements of the structures shall be of such material and size as<br />
specified on drawings or as instructed by the Engineer.<br />
1.15.2.2 Timber facing formwork to come in contact with concrete for<br />
“Exposed Concrete Surfaces” shall consist of lab-jointed or tongue<br />
and grooved planks as directed by the Engineer and no joints shall<br />
permit leakage of mortar at all from cast-in-situ concrete.<br />
1.15.2.3 The materials for other backing and supporting formwork and their<br />
sizes shall be selected by the contractor and shall be subject to the<br />
approval of the Engineer.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 559<br />
1.15.3 Design:<br />
The formwork shall be designed and constructed so that the concrete<br />
can be properly placed and thoroughly compacted to obtain the<br />
required shape, position and level subject to specified tolerances. It<br />
is the responsibility of the contractor to obtain the results required by<br />
the Engineer, whether or not some of the work is sub-contracted.<br />
Approval of the proposed formwork by the Engineer will not diminish<br />
the Contractors responsibility for the satisfactory performance of the<br />
formwork, nor for the safety and co-ordination of all operations.<br />
1.15.4 Formwork for Exposed Concrete Surfaces:<br />
The facing formwork, unless indicated otherwise on drawings, or<br />
specifically approved by the Engineer in writing, shall generally be<br />
made with materials not less than the thickness mentioned below for<br />
different elements of the structure.<br />
1.15.4.1 Plain slab soffits, and sides of beams, girders, joists and ribs and<br />
side of walls, fins, parapets, pardis, sub-breakers etc. shall be made<br />
with :<br />
a) Steel plates not less than 3mm thick of specified sizes stiffened<br />
with a suitable structural frame work, fabricated true to plane<br />
with a tolerance of +/- 2mm within the plate.<br />
b) Plywood plates not less than 12mm thick (IS: 4990 -<br />
Specification for plywood for Concrete Shuttering Work) or<br />
3mm thick with a 20mm timber plank backing, of specified<br />
sizes stiffened with a suitable timber framework.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 560<br />
1.15.4.2 Bottom of beams, girders and ribs, sides of columns shall be made<br />
with:<br />
a) Steel plates not less than 5mm thick of specified size stiffened<br />
with a suitable structural frame, fabricated true to plane with a<br />
tolerance of +/-2mm within the plate.<br />
b) Timber planks of 35mm actual thickness and of specified<br />
surface finish, width and reasonable length.<br />
c) Plywood plates not less than 12mm thick, of specified sizes<br />
1.15.5 Erection of Formwork:<br />
stiffened with a suitable timber framework.<br />
The following shall apply to all formwork:<br />
1.15.5.1 To avoid delay and possible erection of the formwork, the<br />
Contractor shall obtain sufficiently in advance, the approval of the<br />
Engineer for the design of forms and the type of materials used<br />
before fabricating the forms. (Ref ACI 347) Formwork for concrete<br />
of equivalent I.S. Code)<br />
1.15.5.2 All shutter planks and plates shall be adequately backed to the<br />
satisfaction of the Engineer by a sufficient number and size of walers<br />
or framework to ensure rigidity during concreting. All shutters shall<br />
be adequately strutted, braced and propped to the satisfaction of the<br />
Engineer to prevent deflection under deadweight of concrete and<br />
superimposed live load of workmen, materials and plant, and to<br />
withstand vibration. No joints in proper shall be allowed.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 561<br />
1.15.6 Vertical props shall be supported on wedges or other measures shall<br />
be taken where the props can be gently lowered vertically during<br />
removal of the formwork. Props for an upper story shall be placed<br />
directly over those in the storey immediately below, and the lower<br />
props shall bear on a sufficiently strong area.<br />
1) Care shall be taken that all formwork is set plumb and true to<br />
line and level or camber or batter where required and as<br />
specified by the Engineer.<br />
2) Provisions shall be made for adjustment of supporting struts<br />
where necessary. When reinforcement passes through the<br />
formwork care should be taken to ensure close fitting joints<br />
against the steel bars so as to avoid loss of fines during the<br />
compaction of concrete.<br />
3) If the formwork is held together by bolts or wires, these shall<br />
be so fixed that no iron will be exposed on surface against<br />
which concrete is to be laid. In any case wires shall not be<br />
used with exposed concrete formwork. The Engineer may at<br />
his discretion allow the Contractor to use tie-bolts running<br />
through the concrete and the Contractor shall decide the<br />
location and size of such tie-bolts in consultation with the<br />
Engineer. Holes left in the concrete by these tie-bolts shall be<br />
filled as specified by the Engineer at no extra cost.<br />
4) Formwork shall be so arranged as to permit removal of forms<br />
without jarring the Concrete. Wedges, clamps and bolts shall<br />
be used wherever practicable instead of nails.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 562<br />
The formwork for beams and slabs shall be so erected so that<br />
forms on the sides of the beams and the soffit of slabs can be<br />
removed without disturbing the beam bottoms or props under<br />
beams.<br />
5) Surface of forms in contact with concrete shall be oiled with a<br />
mould oil of approved quality or clean diesel oil. If required<br />
by the Engineer the contractor shall execute different parts of<br />
the work with different mould oils to enable the Engineer to<br />
select the most suitable. The use of oil which results in<br />
blemishes of the surface of the concrete shall not be allowed.<br />
Oil shall be applied before reinforcement has been placed<br />
and care shall be taken that no oil comes in contact with the<br />
reinforcement while it is being placed in position.<br />
The formwork shall be kept thoroughly wet during concreting<br />
and for all the whole time that it is left in place.<br />
6) Immediately before concreting is commenced, the formwork<br />
shall be carefully examined to ensure that following:<br />
a) Removal of all dirt, shavings, sawdust and other refuse<br />
by brushing and washing.<br />
b) The tightness of joints between panels of sheathing and<br />
between these and any hardened core.<br />
c) The correct location of tie bars, bracing and spacers,<br />
and especially connection or bracing.<br />
d) That all wedges are secured and firm in position.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 563<br />
e) That provision is made for traffic on formwork not to<br />
bear directly on reinforcing steel.<br />
7) Formwork shall be continuously watched during the process of<br />
concreting. If during concerting any weakness develops and<br />
formwork shows any distress the work shall be stopped and<br />
remedial action shall be taken.<br />
1.15.7 Exposed Concrete Work:<br />
Exposed concrete surfaces shall be smooth and even originally as<br />
stripped without any finishing or rendering. Where directed by the<br />
Engineer, the surface shall be rubbed with carborundum stone<br />
immediately on striking the forms. The Contractor shall exercise<br />
special care and supervision of formwork and concreting to ensure<br />
that the cast members are made true to their sizes, shapes and<br />
positions and to produce the surface patterns desired. No<br />
honeycombing shall be allowed. Honeycombed parts of the concrete<br />
shall be removed by the Contractor as directed by the Engineer and<br />
fresh concrete placed without extra cost, as instructed by the<br />
Engineer. All materials, sizes and layout of formwork including the<br />
locations for their joints shall have prior approval of the Engineer or<br />
the Architect.<br />
1.15.8 Camber:<br />
Forms and false work shall be generally cambered as indicated in<br />
the drawings or as instructed by the Engineer. However, for beams<br />
up to 5m span and slabs upto 4m span camber is not normally<br />
required to be provided.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 564<br />
1.15.9 Tolerances :<br />
In accordance with IS: 456 2000 and MORT & H section 1500.<br />
1.15.10 Age of Concrete at Removal of Formwork :<br />
In accordance with ISL 456 2000 and MORT & H section 1500.<br />
The Engineer may vary the periods specified in IS: 456-2000 if he<br />
considers it necessary. Immediately after the forms are removed,<br />
they shall be cleaned with a jet of water and a soft brush.<br />
1.15.11 Stripping of Formwork :<br />
Formwork shall be removed carefully without jarring the concrete,<br />
and curing of the concrete shall be commenced immediately.<br />
Concrete surfaces to be exposed shall, where required by the<br />
Engineer, be rubbed down with carborundum stone to obtain a<br />
smooth and even finish. Where the concrete requires plastering or<br />
other finish later the concrete surface shall be immediately hacked<br />
lightly all over as directed by the Engineer. No extra charge will be<br />
allowed to the Contractor for such work on concrete surfaces after<br />
removal of forms.<br />
1.15.12 Repropping :<br />
For Multistoreyed buildings the floors may need repropping to<br />
support the loads of the upper floors under construction. The extend<br />
of such repropping shall be as directed by the Engineer (this does
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 565<br />
not normally exceed one fourth of the props provided above). Such<br />
repropping shall not be paid for separately and the cost of such<br />
repropping shall be deemed to have been included in the rates.<br />
1.15.13 Reuse of Forms :<br />
The Contractor shall not be permitted reuse of timber facing<br />
formwork brought new on the <strong>works</strong> more than 5 times for exposed<br />
concrete formwork and 8 times for ordinary formwork. 5 or 8 uses<br />
shall be permitted only if forms are properly cared for, stored and<br />
repaired after each use. The Engineer may in his absolute discretion<br />
order rejection of any forms he considers unfit for use for a<br />
<strong>particular</strong> item, and order removal from the site of any forms he<br />
considers unfit for use in the <strong>works</strong>. Used forms brought on the site<br />
will be allowed proportionately fewer uses as decided by the<br />
Engineer.<br />
Use of different quality boards or the use of old and new boards in<br />
the same formwork shall not be allowed.<br />
1.15.14 Hacking-Out<br />
1. Immediately after removal of forms, the concrete surfaces to<br />
be plastered shall be roughened with a bush-hammer or with<br />
chisel and hammer as directed by the Engineer to make the<br />
surface sufficiently coarse and rough to provide a key for<br />
plaster.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 566<br />
2. At all construction joints in the beams, slabs and columns etc.<br />
1.15.15 Measurements:<br />
laitance and any other loose concrete shall be chipped off<br />
immediately after striking the formwork. The chipped surface<br />
shall then be thoroughly cleaned with a jet of water.<br />
1. Where formwork is paid separately, measurements shall be of<br />
the area of finally exposed surface requiring shuttering<br />
including curves, angles, splays, metres, bevels, etc. for which<br />
no special rate shall be allowed. The rates shall be inclusive of<br />
all work connected with provision of formwork, its erection<br />
and removal and treatment of the concrete surface<br />
immediately after removal of the formwork.<br />
2. No extra payment shall be made for holes to be made in<br />
formwork for inserting electrical conduits, hooks for fans, for<br />
plumbing work.<br />
3. Where boxes or pockets are required to be formed in the<br />
concrete, they will be paid for separately at the Contract Rates,<br />
but in measuring the area of concrete surfaces shuttered, no<br />
deduction will be made for openings upto 0.4m 2 . For voids<br />
larger than 0.4m 2 the surface of formwork forming the voids<br />
shall be paid at rates of formwork set out in the Schedule and<br />
the area of voids deducted from the face area of shuttering.<br />
4. No deductions shall be made from formwork of main beams<br />
where the secondary beams intersects it. Formwork to<br />
secondary beams shall be measured upto sides of the main<br />
beams. No deduction shall be made from the formwork to<br />
stanchion or column casings at intersections of beam.
<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />
C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 567<br />
5. No payment shall be made for temporary formwork used in<br />
concreting, nor for formwork required for joints or bulkheads,<br />
in floors, elsewhere, whether such joints are to be covered<br />
later with concrete or mastic or other material.