<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 250<br />

<strong>road</strong> and its drainage including finishing the surface and the slopes<br />

to the required grade, lines, levels, curves and sections shown on the<br />

plans or as directed by the Engineer. The item also covers<br />

maintaining the work in finished condition until taken over by the<br />

Department.<br />

3.2 CLEARING SITE:<br />

The land width required for the <strong>road</strong>way, gutters, side slopes and<br />

catchwater gutters shall be cleared of all trees having a girth of<br />

30cm (about 1’) and less, brushwood, loose stones, vegetation,<br />

bushes, stumps and all other objectionable materials. The roots of<br />

trees shall be removed to a depth of 30cm (about 1’) below the<br />

surface of the <strong>road</strong> formation and side slopes and the excavation<br />

filled up with excavated materials in 15cm to 20cm. (about 6” to 8”).<br />

Layers and compacted, Brushwood, stumps, vegetation, etc. shall be<br />

cut flush with the ground. All the materials cleared will be the<br />

property of <strong>CIDCO</strong>. Useful materials shall be arranged in<br />

convenient stacks along the <strong>road</strong> boundary or as directed at places<br />

within lead of 50 meters (164’) and handed over to the Department<br />

in convenient sections. Unsuitable materials shall be burnt or<br />

otherwise disposed of by the contractor at his own cost as directed<br />

by the Engineer without crushing any nuisance inconvenience or<br />

damage to the work, property or people in the neighborhood. If the<br />

material is disposed of outside the <strong>road</strong> land, necessary permission<br />

from the private land owners shall be taken by the contractor and<br />

royalty etc., if any paid by him without claiming compensation. In all<br />

cases, the materials shall be disposed of in a neat manner.