<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 352<br />

in advance details of such designs to the Engineer-in-charge for his<br />

prior approval. All the cement concrete of grade M-15 and higher<br />

strength shall be carried out as controlled concrete only and shall be<br />

done with proper mix design. The mix design shall be got approved<br />

from the Engineer-in-charge from time to time whenever there is source<br />

and type of cement and aggregates and change in the gradation of<br />

aggregates.<br />

5.7.1 For Concrete of Grade M-15, M-20, M-25, M-30 :<br />

Preliminary mix design must be carried out from laboratory.<br />

5.7.1.1 The minimum size of aggregate permissible shall be as per IS : 383-<br />

1970 & IS : 456-2000 and in latest amendments, if any.<br />

5.7.1.2 No extra payment over and above the accepted tender rate shall be<br />

made or as reduction in the accepted tender shall be effected in case of<br />

variation in the construction of cement concrete because of the mix<br />

designs or change in the mix design from the standard requirements<br />

for equivalent nominal mix.<br />

5.7.1.3 All the expenses of preliminary mix design, subsequent field laboratory<br />

mix design, work tests shall be borne by the contractor.<br />

5.7.1.4 If the average strength of concrete cube falls below the required<br />

strength, fresh preliminary mixes for that grade shall be made as<br />

before/ Until the trial mixes yield cubes of compressive strength at 28<br />

days greater than the required average strength at the age i.e. fck + 4<br />

N/mm2 as per I.S. 456-2000.<br />

5.7.1.5 Whenever there is a significant change in the quality of any of the<br />

ingredients for concrete, the Engineer may at his discretion order to<br />

carrying out of fresh trail mixes. All costs for trial mixes and tests shall<br />

be to contractor’s account and held to be included in the contract rates.