<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 412<br />

14.5 HANDLING AND TRANSPORTATION:<br />

i) The coated bars shall be securely bound together using a buffer<br />

material (padding) and it is desirable that the bent bars shall<br />

supplied with some canny cover.<br />

ii) When loading and unloading of bundles of coated bars, it shall<br />

be preferable lift them with a strong back, spreader bar multiple<br />

supports etc. To avoid external bending nylon slings at 2 or 3<br />

points shall be used.<br />

iii) The bundles of bars shall not be dropped.<br />

iv) If damage had occurred to the coating during transportation it<br />

must be repaired before rusting occurs.<br />

14.6 SPECIFICATIONS FOR PATCH REPAIRING OF COATING DAMAGES<br />

a) Coating repair is required when peeling off and other damages<br />

occur during fabrication or handling.<br />

b) The patch repair shall be done at site using the same coating<br />

material as per manufacturer’s recommendations.<br />

c) It is essential to ensure a minimum coating thickness of 150<br />

microns at all the repaired portions before embedding in<br />

concrete.<br />

14.7 SPECIFICATION FOR CUTTING, BENDING AND WELDING OF<br />

COATED REBARS AT FIELD.<br />

i) It is desirable that the coated rods shall be bent gradually.<br />

ii) In the field, the cut and welded portions of the coated rebars<br />

shall be repaired by the same formulations.