<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 467<br />

drainage, water supply or lighting if interrupted by the work,<br />

arrangements for the efficient protection of the life and property,<br />

fencing, lighting, watching, shoring, pumping, shaping the trenches,<br />

maintenance of water pipes, gas pipes, drains and other work met<br />

with in or about the excavation, watering and ramming foundations,<br />

temporary refilling, consolidation and subsequent re-excavation, on<br />

account of rain, holidays or special occasions, filling in, ramming,<br />

watering and consolidating, surplus excavated material as<br />

stipulated, here in and all necessary matters and thing, connected<br />

with and rendered necessary or otherwise involved by the<br />

excavation. The rate of excavation also includes pumping out any<br />

quantity of water from any source by using any number of pumps<br />

and for any length of time singly or in combination. Nothing extra<br />

will be paid on this account during the excavation of the whole work.<br />

b) If, in the opinion of the Engineer, the exigencies of the work require<br />

that in any part the whole quantities of excavation shall be done<br />

upto the full measurement paid for, the contractors shall have no<br />

claim for extra payment on account of the allowance or concessions<br />

shall not be applicable to any work, unless it comes completely<br />

under one of the above descriptions to which a settled mode of<br />

measurement is applied.<br />

23.0 SIGHT RAILS AND BONING STAVES<br />

23.1 In laying the pipe sewers and constructing drains, the centre for each<br />

manhole must be marked by a peg, or otherwise, as may be<br />

determined by the Engineer. The contractors are then to dig holes<br />

for and set up two posts (about 100 mm x 100 mm x 1800 mm) at<br />

each manhole at nearly equal distance from the peg and a sufficient