<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 253<br />

3.5 CONSTRUCTION METHOD:<br />

Profiles of the section including the <strong>road</strong> side gutters to be excavated<br />

shall be laid at suitable intervals of 10 m. (about 32.8’) to 50m.<br />

(about 64’) or other intervals directed by the Engineer to conform to<br />

the curved or straight alignment, section, grades and side slopes.<br />

The lines of cuts shall be clearly marked and profiles of<br />

embankments where excavated materials are to be used shall be set<br />

up with the toe line marked on each side. The <strong>road</strong>way section shall<br />

be first excavated with vertical sides for each lift and the side slopes<br />

for that lift shall be excavated in steps.<br />

These steps shall be smoothened to the required slopes when the<br />

excavation reaches the <strong>road</strong> formation. The contractor shall on no<br />

account excavate beyond the slopes or below the specified grade<br />

unless so directed by the Engineer in writing. If excavation is done<br />

below the specified level or outside the section, it shall not be paid<br />

for and the Contractor shall be required to fill up at his own cost<br />

such extra excavation in the <strong>road</strong> portion with approved materials of<br />

the embankment grade in layer of 15cm. to 20cm. (about 6” to 8”)<br />

watered and fully compacted to attain maximum density laid down<br />

for the embankment in the same agreement elsewhere. The<br />

Engineer may require measurement ridges and dead-men to be left<br />

at specified interval or places and kept intact till ordered to be<br />

removed for the purpose of check measurements. The excavation<br />

shall be finished neatly, smoothly and evenly to the correct lines,<br />

curves, grades sections and side lopes a shown on the plans or<br />

directed by the Engineer. The sub-grade if loose shall be scarified,<br />

watered and compacted to the same density as the embankment.<br />

The section, side slopes and catchwater gutters shall be maintained<br />

by the contractor at his own cost in such a way the formation and