<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 342<br />

excavation. Care shall be taken not to disturb electric and<br />

communication cables. Removal of such cables, if necessary,<br />

shall be arranged by the ENGINEER.<br />

g) Forming (or leaving) steps in sides of deep trenches and their<br />

removal.<br />

h) Removing slips or falls in excavation including necessary shoring<br />

& strutting.<br />

i) Fencing and/or other suitable measures for protection against<br />

risk of accidents as approved by the ENGINEER.<br />

j) Excavation for insertion of planking and strutting where required,<br />

and<br />

k) Backfilling the trenches foundations (sides of footings) with<br />

selected excavated materials.<br />

l) Payment of necessary royalty charges for excavation and<br />

contractor’s material brought from outside.<br />

3.0 Providing and laying dry trap rubble soling 23 cm. thick including hand<br />

3.1 General:<br />

packing and filling the voids with rubble chips including watering and<br />

compaction etc. complete.<br />

The item provides for supply of dry trap rubble soling and labour for<br />

laying of specified type of stones in the specified thickness including<br />

preparing the subgrade to proper section by scraping, dressing,<br />

watering and compaction with vibratory roller etc. and hand packing<br />

the rubble chips to the required line, curve, grade and section.