<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 444<br />

manufacturing the pipe. For NP3 class<br />

pipes.<br />

4) Aggregates : Aggregates used as per IS 383 latest<br />

version and as per Clause No.4.3 of IS<br />

458-1988 with amendment No. 2<br />

5) Concrete : Pipe concrete should conforming to IS:456<br />

– 1978 code of practice for plain and RCC<br />

(fourth revision) as per clause No.4.5 with<br />

latest amendment.<br />

6) Water : As per IS 456-2000.<br />

7) Testing at factory : Contractor has to make arrangement of<br />

testing of pipe at factory before supply at<br />

site, Sampling as per IS code as per IS<br />

458 clause 9 with latest amendment/ cube<br />

test are as per IS 516-1959 and IS 5816-<br />

1999 at factory.<br />

Test are :<br />

i) Hydrostatic test as per IS 3599-1998.<br />

ii) Three edge bearing test as per IS<br />

3599-1998.<br />

iii) Permeability test as per IS 3597-<br />

1998.<br />

vi) Absorption test as per IS 3599-1998.<br />

v) Straightness test as per IS 3599-1998.<br />

Sampling and inspection should be as per<br />

clause No.10 of 458 with amendment.