<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 532<br />

6.2 Caulking the joint shall be done after the lead is poured. All excess<br />

lead protruding outside of the socket shall be removed with a flat<br />

chisel and joints caulked number of times (minimum three) all along<br />

the circumferential joints to make the joint watertight. The joint when<br />

completed should be flush, neat and even with the socket. Where the<br />

pipes are not laid in continuous lengths but in stretches, the open<br />

ends of the pipes shall be provided with wooden plug covered with<br />

hession cloth to prevent access to dirt etc. At certain places for<br />

jointing two faces of pipes a collar joint will have to be provided if<br />

directed by the engineer. The collar joint will be paid under the same<br />

rate as for socket and spigot, but collar joint will be treated as two<br />

joints of the spigot and socket type. This item included dewatering of<br />

trenches.<br />

6.3 After completion of pipe laying work in whole length or in parts as<br />

decided by the Engineer, the trench shall be partially filled back<br />

except at the joints before taking up the hydraulic test. In each case<br />

the contractor has to close both ends of the section of pipe line to be<br />

tested either by providing cap, blank flange or by sluice valve as per<br />

directions of the engineer. If necessary both the ends shall be<br />

properly anchored by providing M-20 c.c. blocks of required<br />

dimensions. Payments will be made for providing these c.c. block<br />

under the respective items. Contractor shall provide required<br />

number of plug points with ferrule of required diameters to save as<br />

injection points, air relief points etc. on the completion of the test,<br />

these points shall be closed by the plugs by the contractor. No<br />

separate payment will be made for this. The contractor shall make<br />

necessary arrangement to fill the section of main to be tested by<br />

taking available size connection from existing main nearby or from<br />

any other sources. The charges for water supplied, for making and<br />

removing connection will have to be borne by the contractor only.