29.07.2013 Views

particular specifications (road works) - CIDCO Maharashtra Ltd.

particular specifications (road works) - CIDCO Maharashtra Ltd.

particular specifications (road works) - CIDCO Maharashtra Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 503<br />

46.0 DEFECTIVE CONCRETE<br />

The defective concrete shall be cut out and the work reconstructed<br />

with fresh concrete of required quality in the presence of the<br />

Engineer. The concrete thus cut out shall not be reused under any<br />

circumstances. Should any concrete become permanently damaged<br />

due to cracking or broken or damaged from whatever cause or<br />

should any concrete be found defective in quality due to honey<br />

combing or bad workmanship, it shall be removed forthwith and<br />

replaced by concrete of required quality at the cost of the contractors<br />

to the satisfaction of the Engineer.<br />

47.0 CONSTRUCTION JOINTS<br />

a) Construction joint shall be of an approved shape and shall be<br />

vertical or horizontal as required except that in inclined or curved<br />

member the joint shall be at right angle to the axis of the<br />

member. The joints shall be formed only in placed approved by<br />

the Engineer.<br />

b) Construction joints shall be provided in the positions described on<br />

the drawings or elsewhere and where not so described shall be in<br />

accordance with the following. A joint shall be formed<br />

horizontally at the beams meeting at the head of column.<br />

A joints shall be formed in the rib of a large tee beams and all<br />

beams and 25mm below the soffit of the slab. Concrete in a<br />

hunch or a splay on a beam or a brace and in the head of<br />

column.<br />

Where one or more beams meet, shall be placed without joint at<br />

the same time as that in the beams or brace. Concrete in the<br />

splay at the junction of a wall and slab shall be placed without a

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!