<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 526<br />

1.9 Refilling :<br />

On completion of the pipe laying operation any section for a length<br />

of about 10 mtrs., and while further work is still in progress, refilling<br />

of trenches shall be started by the contractor with a view to throw<br />

open the traffic the portion of the <strong>road</strong>way in which the work is<br />

already over. Only soft earth and murum of good quality obtained<br />

form the excavation and stacked near the work site shall be used for<br />

filling in around the pipes (at least 30 cms. Around) and its-<br />

anchorages. The remaining portion of the trench shall be filled in<br />

with a mixture of hard and soft materials in sufficient quantities if<br />

good earth and murum are not available. Filling shall be done in<br />

layer not exceeding 20 cm. in thickness with adequate watering,<br />

ramming and rolling so as to obtain good compaction. Excavated<br />

materials laying within a distance of 50 mtrs., shall be used for this<br />

purpose. The trenches shall be refilled so as to build up to the<br />

existing ground level. Such refilling work including a lead of 50<br />

mtrs., shall be paid for separately under relevant item in schedule<br />

“A”. The Engineer shall at all times have powers to decide which<br />

portion of the excavated materials shall be used for refilling and<br />

which place of site and in what manner it shall be used.<br />

2.0 Murum Bedding :<br />

In case of hard rock, marine clay and black cotton soil, sand<br />

bedding to a maximum depth of 300 mm shall be provided by the<br />

contractor. The murum bedding shall be done for the full width of<br />

the trench in the portion where such bedding under the pipeline is<br />

necessary. It shall be properly watered and rammed. The murum to<br />

be used shall be as far as possible out of excavated materials only.