<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 325<br />

1.11 SITE CLEARANCE :<br />

This shall consists of removing and disposing off all materials such as<br />

trees, bushes, shrubs, rubbish, etc. which in the opinion of the Engineer<br />

are unsuitable for incorporation in the <strong>works</strong> from within the highway<br />

limit and such another areas as may be specified on the drawing or by<br />

the Engineer., the requirements of the <strong>specifications</strong> at the time of their<br />

use in <strong>works</strong>.<br />

1.12 TESTING :<br />

Testing shall be carried out in a field laboratory set up by the<br />

Contractor and cross checking will be done in <strong>CIDCO</strong> Laboratory or<br />

any recognized laboratory at the Contractor’s cost.<br />

1.13 DEFECTIVE MATERIALS :<br />

All materials, which the Engineer has determined as not conforming to<br />

the requirements of the contract will be rejected, whether in place or<br />

not. They shall be removed by the Contractor at his own cost<br />

immediately as directed. Materials, which have been found defective<br />

and which have been subsequently rectified or corrected shall not be<br />

used in the work without the consent of the Engineer in writing. Upon<br />

failure of the Contractor to comply promptly with any order of the<br />

Engineer or his representative, given under this clause, the Engineer<br />

shall have the authority to have rejected material removed and deduct<br />

the cost of removal from any money due to the contractor.<br />

1.14 TESTING OF MATERIAL NOT COVERED UNDER SPECIFICATIONS:<br />

In case the materials/finished products are not covered by the<br />

<strong>specifications</strong> in the contract, the details of specification to be followed