<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 533<br />

6.4 Testing will be carried out by contractors under the guidance of<br />

Engineer. The Contractor shall disinfect the entire pipeline as<br />

directed by the Engineer before carrying out testing. Contractors<br />

shall provide the required machinery, equipments and technical staff<br />

for testing the pipeline. A section of the pipe shall be considered<br />

satisfactory only when leakage is less than 425 litres/25 mm dia<br />

km/day at 9 kg/cm 2 pressure and as per relevant IS. If the first test is<br />

not found satisfactory, repeated tests after the necessary repairs will<br />

be undertaken and procedures as mentioned above shall be<br />

followed.<br />

6.5 When the section of the pipe line is tested successfully, the<br />

Contractor shall back fill the portion as per direction of the Engineer.<br />

The cost of testing the pipe line shall be deemed to have been<br />

included in the cost of laying the pipeline and no separate payment<br />

shall be made as referred above.<br />

7.0 PIPES & APPURTENANCES :<br />

D.I. Pipes (S &S) type and appurtenances such as butterfly valve etc.<br />

shall be supplied by the contractor himself and they himself shall<br />

make their own arrangements to purchase it from market and<br />

transport it to the site of work. The butterfly valve shall consist of all<br />

necessary fittings. The rate includes the cost of materials, cost of<br />

rubber packing, washer, nut bolts etc. which also shall be provided<br />

by the contractors without any extra cost.<br />

7.1 Before procurement of valves, approval shall be taken from Engineer<br />

regarding make and valves shall be tested at manufacture’s factory<br />

before dispatch to site. Before valves are fixed, they shall be cleaned<br />

and greased. It should be seen that all the parts are in perfect