<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 259<br />

checking. Deduction shall be made for these dead-men. These shall<br />

be removed when no longer required and the deduction restored<br />

thereafter. If the dead-men are not removed and used in the work or<br />

otherwise disposed of as directed by the Engineer within 15 days of<br />

the date of check measurement, the Engineer shall have the right to<br />

remove then at the contractor’s cost. If for any reason the dead-men<br />

are damaged at the time of measurement the measuring or check<br />

measuring officer shall estimate the quantity of earthwork at his<br />

discretion and such estimate shall be final.<br />

4.0 Providing earthwork in embankment with approved materials<br />

4.1 GENERAL :<br />

obtained from contractor’s own source including all lifts and leads,<br />

laying in layers of 20 cm. to 30 cm. thickness, breaking clods,<br />

dressing to the required lines, curves, grades and section, watering<br />

and compacting to 97% Modified Proctor Density Complete.<br />

The work shall include preliminaries of clearing site, setting out and<br />

preparing the ground and thereafter forming embankment for the<br />

<strong>road</strong> with approved materials obtained from contractor’s own source,<br />

laying in layers, watering and compacting to the required density and<br />

lines, curves, grades, cross section and dimensions shown on the plan<br />

or as directed by the Engineer with due allowance for shrinkage.<br />

4.2 CLEARING SITE :<br />

The ground over which embankment is to be formed shall be cleared<br />

of all trees (unless cutting of trees of over 30 cm. girth is provided as<br />

a separate item vide Rd.1), brushwood, loose stones, vegetation,<br />

bushes, stumps and all other objectionable materials, under this item.