<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 311<br />

octroi, insurance etc. levied by Govt/Semi-Govt/local authority<br />

and cost of ready mix concrete and any penalty, additional<br />

charges for controlling temperature upto casting, or any other<br />

charges levied by the manufacturer.<br />

3. Proportioning of the mix/mix design shall be decided by the<br />

contractor/RMC manufacture to achieve strength specified in item<br />

& shall be get approved by Engineer-in-charge. The<br />

proportioning of ingredients, use of ingredients and mix designs<br />

parameters for various slumps shall be got approved by Engineer-<br />

in-charge prior to mix design.<br />

4. Scaffolding shall conform to <strong>specifications</strong> No.B.6.5 (a) and got<br />

approved by the Engineer.<br />

5. Forms shall conform to <strong>specifications</strong> No.B.6.5 (b).<br />

6. The concrete shall be pumped to the final positions as quickly as<br />

possible by methods which will prevent segregation and loss of<br />

ingredients.<br />

7. The concrete shall be placed into its final position, compacted and<br />

finished before initial setting commences. The method of placing<br />

shall be such as to avoid segregation. Placing shall be done in a<br />

balanced manner to avoid eccentric loads on the form work.<br />

As far as possible the concreting shall be done continuously and<br />

construction joints avoided.