<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 442<br />

stream area from the filling of the cofferdam or from any excavation<br />

shall be removed and the stream area made free from obstruction<br />

caused thereby as directed by the Engineer.<br />

23.6 Item to include:<br />

1) All labour, materials, use of equipment and other arrangement<br />

necessary for dewatering during excavation and construction of<br />

other items requiring dewatering.<br />

2) Dewatering foundation trenches, excavation and other areas to<br />

be built upon to enable the masonry, concrete or other<br />

construction work to be done in the dry and till the Engineer<br />

considers that the mortar or concrete has sufficiently set.<br />

3) Dewatering all the items requiring dewatering are fully<br />

completed. This shall also include time required for passing<br />

foundations and taking measurements of all the items requiring<br />

dewatering.<br />

4) Removing liquid stuff of any sort which might find access into the<br />

trenches by blowing, slip or any other cause what-so-ever from<br />

the sides or bottom of the foundation or excavation or from<br />

elsewhere during or after dewatering.<br />

23.7 Mode of measurement and payment:<br />

The contract rate shall be per hours of pumping.