C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 488<br />

No cement that has been stored for more than 90 days ordinarily be<br />

allowed to be used on the <strong>works</strong>. Cement stored for longer period<br />

than 90 days shall be used on work only with the specific written<br />

permission of the Engineer who shall ascertain its quality after due<br />

testing in the laboratory before giving such permission. All expenses<br />

in connection with the test shall be borne by the contractors.<br />

For testing the quality of cement, samples shall be taken from every<br />

consignment arrived at the site of work at the option of the Engineer.<br />

The contractors shall afford every facility to the Engineer for<br />

inspection and sampling the cement. The cement godown shall be<br />

so arranged by the contractors that each consignment could be<br />

stacked separately and in such a manner so as to allow counting<br />

bags in each row with case. The test results shall, ordinarily, be<br />

available within a week of sampling and the contractor shall not use<br />

by any part of the consignment until the results of the tests are<br />

received and found satisfactory. Should, however, the use of such<br />

cement becomes imperative before the test results are received, the<br />

contractors may do so entirely at their own risk and cost and the<br />

whole of such work carried out by them is liable for rejection, if the<br />

tests results are found unsatisfactory. Any consignment failing to<br />

meet the requirements of I.S. shall be rejected and shall be removed<br />

from the work site within 48 hours of the intimation from the<br />

Engineer. The decision of the Engineer in this respect shall be final<br />

and binding on the contractors.<br />

The charges in connection with the testing of cement such as<br />

transport of samples, testing fees, etc. shall be borne by the<br />