<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 517<br />

completely finished with floors, channels cover and all other detail.<br />

A manhole will be considered incomplete unless it is completely<br />

finished as above, and at least one of the lines of pipe sewer to<br />

which it belongs or it attached, is complete as described above.<br />

The Contractors shall have no claim for incomplete work and no<br />

incomplete work will be measured up for payment to the<br />

Contractors.<br />

53.0 MEASUREMENT FOR TRANSPORT OF RUBBLES<br />

Serviceable rock will be permitted to be used for refilling trenches.<br />

The measurement for the items of transport of rubble to specified<br />

distance will be either by lorry measurements or depot measurement<br />

as directed without deducting anything in quantities in excess of the<br />

calculated surplus material to be removed as per excavation item.<br />

54.0 CONTRACTOR TO OBSERVE ALL CONDITIONS<br />

The contractors are <strong>particular</strong>ly directed to observe from the Articles<br />

of Agreement and the Specification what is to be included in their<br />

rate for the several portions of the work and also under what<br />

conditions payments are to be made.