<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 520<br />

PARTICULAR SPECIFICATIONS<br />

(WATER SUPPLY)<br />

1.0 EXCAVATION OF TRENCHES :<br />

For laying underground pipeline, trenches shall be excavated by the<br />

contractors whenever necessary and as directed by the engineer. If<br />

for any reason, the dimensions of the trenches are required to be<br />

altered from the normal section specified, either to suit the <strong>particular</strong><br />

site conditions or form any special work, the same shall be done<br />

after obtaining permission of the engineer. Depth of trench would<br />

generally, be 1.0 metre but may vary to suit the level and grade of<br />

pipeline. When the pipeline is under a <strong>road</strong>ways, a minimum cover<br />

of 0.9 metre is to be kept. The width of trenches for pipeline shall be<br />

generally restricted to the width shown in the table below.<br />

Diameter of<br />

pipeline in mm<br />

Width allowed in<br />

meter<br />

Depth allowed in<br />

meter<br />

80 0.600 0.800<br />

100 0.600 0.800<br />

125 0.600 0.800<br />

150 0.600 1.100<br />

200 0.650 1.150<br />

250 0.700 1.200<br />

300 0.750 1.250<br />

350 0.800 1.300<br />

400 0.850 1.350<br />

450 0.900 1.400<br />

500 1.000 1.850<br />

600 1.000 2.050<br />

800 1.300 2.500