29.07.2013 Views

particular specifications (road works) - CIDCO Maharashtra Ltd.

particular specifications (road works) - CIDCO Maharashtra Ltd.

particular specifications (road works) - CIDCO Maharashtra Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 461<br />

clauses of such work and all appliances and appurtenances<br />

including polling boards, sheet piling and runners (whether the joints<br />

be butt, groove and tongue feather edge and groove, birds mouth<br />

and double splay, rebated or otherwise), together with walling struts<br />

prope, point blank shores, raking shores, blocks, wedges, iron dogs,<br />

bolts, screws, nails and everything that may be required for due<br />

execution of the work.<br />

b) No part of the shoring shall at any time be removed by the<br />

contractor without obtaining permission from the Engineer. While<br />

taking out shoring plank the hollows if any, formed must<br />

simultaneously be filled in with soft earth well rammed with rammers<br />

and with water.<br />

c) Shoring left in trenches<br />

The Engineer may order portions of shoring to be left in the trenches<br />

at such places, where it is found absolutely necessary to do so as to<br />

avoid any damage which may be caused to building, cables, gas-<br />

mains, water mains, sewers etc. in close proximity of the excavation,<br />

by pulling out the shoring from the excavations. The contractors<br />

shall be paid at the rate inserted by them in the Schedule of Rates<br />

and Quantities or to be decided by the Engineer as per clause 22 of<br />

General Conditions, only by the order of Engineer, and they shall<br />

not claim, on any reason, whatsoever for the shoring which may<br />

have been left in by them at their own discretion.<br />

Any allowance for shoring left in the portions of rakers, struts, or<br />

other timber cut off and not permanently left in the work will not be<br />

included.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!