<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 358<br />

5.8.2.3 Test Specimen:<br />

Three test specimens shall be made from each sample for testing at 28<br />

days. Additional samples may be required for various purposes such as<br />

to determine the strength of concrete at 7 days or at the time of striking<br />

the formwork, or to determine the duration of curing, or to check the<br />

testing error. Additional samples may also be required for testing<br />

samples cured by accelerated methods as described in IS: 9103. The<br />

specimen shall be tested as described in IS 5116.<br />

5.8.2.4 Test results of sample:<br />

The test results of the sample shall be the average of the strength of<br />

three specimens. The individual variation should not be more than +<br />

15 percent of the average. If more, he test results of the sample are<br />

invalid.<br />

5.8.2.5 Determination of Standard Deviation:<br />

Where:<br />

Concrete of each grade shall be analyzed separately to determine its<br />

standard deviation.<br />

The standard deviation of concrete of a given grade shall be calculated<br />

using the following formula from the results of individual tests of<br />

concrete of that grade obtained as specified in Table.<br />

Estimated standard deviation = S =<br />

ΣΔ 2<br />

n - 1<br />

Δ = Deviation of the individual test strength from the average<br />

strength 'n' samples and<br />

n = Number of samples test results.<br />

When significant changes are made in the production of concrete<br />

batches (for example changes in the material used, mix design,<br />

equipment or technical control), the standard deviation value shall be<br />

separately calculated for Such batches of concrete.