<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 524<br />

1.4 Breaking of <strong>road</strong> surface ;<br />

The item of excavation shall also cover the cost of breaking <strong>road</strong><br />

surfaces of all types wherever needed including foundation. The<br />

classification of such excavation shall be deemed to be in hard<br />

soil/murum.<br />

1.5 Shoring :<br />

Normally no shoring may be required. However, if due to site<br />

conditions the same is found necessary, the contractor will provide it<br />

wherever it is needed or as directed by Engineer at no extra cost and<br />

deformed timber shall be used for shoring and strutting.<br />

1.6 Dewatering of trenches :<br />

The contractor shall provide and work at his own cost all pumps,<br />

engines and machineries required to keep the trenches during the<br />

excavation, pipe laying etc. clear of water, whether it is sub-soil, soil<br />

water, creek water, storm water or leakage from tanks, wells, drains<br />

sewer pipes and from an other source or reasons. If there should be<br />

nay accumulation of water, no setting out shall be done, no masonry<br />

is to be laid, no concrete is to be deposited, no pipe to be laid and<br />

no measurements to be taken. The pumping shall be continued<br />

during and after excavation of any portion of the work and repeated<br />

as after as the engineer may consider if necessary for inspection,<br />

testing etc. The pump used shall be of adequate capacity. When the<br />

water in the trench is being pumped out across a <strong>road</strong>, care shall be<br />

taken that there is no obstruction to the vehicular traffic. If it is<br />

necessary to make done by the contractor at no extra cost as<br />

directed by the Engineer. The contractor shall get pumped water<br />

discharge into the nearest drain in such a way that it does not