30.07.2013 Views

Master Plan 2009 - Sydney Airport

Master Plan 2009 - Sydney Airport

Master Plan 2009 - Sydney Airport

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Terminal expansion is likely to progressively<br />

require the displacement of most existing aviation<br />

and other support functions. Further car park<br />

development to the east and north of the existing<br />

structures is proposed to meet an increased<br />

demand and to absorb support functions currently<br />

provided at-grade elsewhere in the precinct or on<br />

the airport.<br />

<strong>Plan</strong>ning provision has been made for meeting<br />

a variety of commercial demands including<br />

offices, hotels, retail, service facilities and<br />

advertising signage in this area. The precinct<br />

can accommodate demand for up to a total of<br />

120,000 sqm of commercial floor space (excluding<br />

the Domestic Terminal), which will comprise of<br />

the existing precinct built form and proposed<br />

future additions. It is envisaged that approximately<br />

15,000 sqm of that floor space will be allocated<br />

for general retail purposes such as food and drink<br />

premises, convenience stores and the like.<br />

11.4 Southern sectors<br />

The south-eastern parts of <strong>Sydney</strong> <strong>Airport</strong> (south<br />

of Runway 07/25 and east of Runway 16R/34L)<br />

form a strategic land reserve for medium to long<br />

term aviation activities This area is currently<br />

characterised by important navigation sites and<br />

low density commercial uses such as car rental<br />

support facilities and lower-cost car parking<br />

facilities. Over time, some of the navigation sites<br />

are expected to be vacated as new technology<br />

is introduced (see Chapter 6). Due to aviation<br />

development in this area, the medium to long<br />

term relocation of existing public long term and<br />

staff car parking and other vehicle storage to the<br />

International and Domestic precincts is likely to be<br />

required.<br />

It is expected that some aviation uses such<br />

as layover aircraft, GSE parking, aircraft<br />

maintenance and general aviation facilities will<br />

be established over time. Until the aviation use<br />

of this land reserve is required, these areas will<br />

remain available for commercial development.<br />

Some existing commercial uses may remain and<br />

intensify.<br />

Examples of commercial developments for these<br />

locations include road front activities addressing<br />

passer-by and traveller needs such as hotels,<br />

general retail, food outlets, vehicle service centres,<br />

advertisements and signage. Other areas could<br />

satisfy demand for uses such as aviation support,<br />

business park style offices, and light industrial.<br />

98<br />

Responding to on going local interest, <strong>Sydney</strong><br />

<strong>Airport</strong> is pursuing, convention, leisure and water<br />

access opportunities for the south-west sector.<br />

This has the potential to complement similar<br />

initiatives being considered by Rockdale City<br />

Council.<br />

11.5 Northern airport precinct<br />

Several land parcels north of the Alexandra Canal<br />

are owned by <strong>Sydney</strong> <strong>Airport</strong>. During the planning<br />

period, as a result of terminal expansions planned<br />

for the International and Domestic precincts,<br />

freight and airport logistics facilities and a number<br />

of other associated aviation and commercial<br />

support functions are proposed to be relocated to<br />

these lands.<br />

The establishment of freight and airport logistics<br />

facilities is expected to occur progressively.<br />

Examples of complementary uses proposed for<br />

the northern precinct includes light industrial,<br />

advertisement and signage, vehicle staging and<br />

parking uses.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!