30.07.2013 Views

DCP Series X.25 Packet Switched Communications Software (PSCS ...

DCP Series X.25 Packet Switched Communications Software (PSCS ...

DCP Series X.25 Packet Switched Communications Software (PSCS ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contents<br />

6.10. X25DEF — Defining Network Characteristics .....6–61<br />

6.11. X25NET — Defining DCE Network Routes ........6–73<br />

6.12. X25ROUTE — Specifying Routing Precedence ....6–75<br />

Section 7. <strong>X.25</strong> <strong>PSCS</strong> Troubleshooting<br />

7.1. Troubleshooting Overview ....................7–2<br />

7.2. Verifying Line Operation .....................7–3<br />

7.2.1. Verifying General Line Operation ................7–3<br />

Determining If <strong>X.25</strong> <strong>PSCS</strong> Installation Failed ......7–4<br />

Determining If <strong>X.25</strong> <strong>PSCS</strong> Initialization Failed ......7–5<br />

Determining If Hardware/<strong>DCP</strong> System Resources<br />

Failed ................................7–6<br />

7.2.2. Verifying Specific Line Operation ................7–8<br />

Physical Layer Connection ..................7–9<br />

Link Layer Connection .....................7–9<br />

7.3. Verifying Virtual Circuit Connections ...........7–11<br />

7.3.1. Using Data Session or Service Operation to Verify<br />

Connections .............................7–11<br />

7.3.2. Using NMS Commands to Verify Connections ......7–11<br />

7.3.3. Connection Troubleshooting Actions ............7–13<br />

Generating Telcon CENLOG Reports ..........7–13<br />

Generating Layer 3/4 Platform Interface User<br />

Reports ..............................7–14<br />

Using Message Tracing ...................7–14<br />

7.4. Verifying Message Data Transfer Performance ....7–15<br />

7.4.1. Identifying External Facilities and Interfaces That<br />

May Affect Data Transfer Performance ...........7–15<br />

Determining Adequate Virtual Circuit Connection<br />

Resources ............................7–15<br />

Determining Whether Telcon or Host Interface<br />

Resources Affect Data Transfer .............7–16<br />

Determining Adequate <strong>DCP</strong>/OS Resources ......7–17<br />

7.4.2. Determining Areas Within <strong>X.25</strong> <strong>PSCS</strong> That Affect<br />

Data Transfer ............................7–18<br />

<strong>Packet</strong> Level Characteristics ................7–18<br />

Incompatible Flow Control Values ...........7–18<br />

Facility Constraints ....................7–19<br />

Link Level Characteristics ..................7–19<br />

Incompatible Frame Control Values .........7–19<br />

Subscription Parameters ................7–20<br />

Physical Line Characteristics ...............7–20<br />

7831 5470–200 ix

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!