National Rural Health Mission - Amravati
National Rural Health Mission - Amravati
National Rural Health Mission - Amravati
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Budget requirement for Coordination Cell during the year 2011‐12<br />
Rs. In Lakhs<br />
Sr Particulars Monthly budget No. of Unit Budget required<br />
requirement<br />
for 2011‐12<br />
1 Salary of Supervisor 0.06 1 0.72<br />
2 Salary Coordinator 0.04 4 1.92<br />
3 Furniture & renovation of Help<br />
desk<br />
0.50 1 0.50<br />
4 Telephone facility to Help desk 0.02 12 0.24<br />
5 Mobile Charges to all Members 0.01 5 0.60<br />
6 Over heads 0.60 1 0.60<br />
Total 4.58<br />
MAHER SCHEME<br />
Maher scheme<br />
Melghat have hilly terrain and many of the tribal padas do not have pukka roads. Even if<br />
pukka roads are available, there is no reliable transportation system for transferring pregnant<br />
women in labour to nearby PHC. This is the one of the important cause of high maternal and<br />
neonatal mortality and morbidity.<br />
Since accurate predication cannot be made on the time of delivery, hence it puts the mother<br />
in danger if she develops complicacies and does not find transportation facilities. Hence Maher<br />
scheme is implemented in Melghat area in which one room is build in PHC premises where pregnant<br />
woman will get admitted one week before her due date. She can be daily checked by Doctor of PHC<br />
and can be transported to suitable referral centre if any complications are detected during waiting<br />
period or during labour.<br />
Following facilities are proposed in ‘Maher’<br />
• One room of 5×5 meters<br />
• One sanitary block (Toilet and bathroom)<br />
• One kitchen ota with smokeless chulha<br />
• One solar water heater system on roof of the room<br />
‘Maher’ will be maintained by local Self Help Group. When mother is admitted, mother, her young<br />
child and one relative will be provided food three times a day. It is proposed to provide Rs. 400/‐ per<br />
delivery. In 2008‐10, 9 PHCs Maher room constructions get completed. Hence remaining 2 PHCs in<br />
Melghat areas will be proposed under this scheme.<br />
Melghat PHC : 1) Katkumbh<br />
2) Salona