In the PIP details of strategies/activities to be undertaken tackle above mentioned issues and other<br />
issues which have been highlighted in the performance assessment of VH&SCs should be given.<br />
Progress made so far should be indicated in the following format:<br />
Activity Cumulative Achievements so far<br />
No. of Revenue Villages 1547<br />
Number of Village <strong>Health</strong> & Sanitation committees<br />
constituted<br />
1543<br />
No. of Joint Account opened 1543<br />
Total funds released to VHSCs (Rs in lakh) 1543<br />
Total amount spent by VHSCs so far 51.64<br />
Total unspent balance<br />
No of VHSCs members trained<br />
102.66<br />
B.1.4 Untied Funds: Pace of utilisation of untied fund at various levels of health facilities to be<br />
enumerated including major areas in which these funds have been utilized. Improvements made in<br />
the health facilities should be including innovative and best practices adopted should be described.<br />
Cumulative achievements so far should be indicated in the following format:<br />
Facility level Number of Total amount Total amount Unspent<br />
facilities released so far utilized balance<br />
Untied Fund for SCs 333 33.30 13.11 20.19<br />
Untied Fund for PHCs 56 14.00 7.99 6.01<br />
Untied Fund for CHCs 14 7.00 2.60 4.40<br />
Untied Fund for DH 1 ‐ ‐ ‐<br />
B.1.5 Annual Maintenance Grants: Proper maintenance of physical infrastructure is a must to<br />
ensure quality services in various health facilities. Annual Maintenance Grants given to the health<br />
facilities should be effectively utilized to improve the facilities continuously through regular<br />
maintenance and repair works. Requirement of funds should be indicated in the following format:<br />
Facility level Number of Total amount Total amount Unspent<br />
facilities released so far utilized balance<br />
AMG fund for SCs 296 14.80 10.06 4.74<br />
AMG fund for PHCs 48 24.00 14.15 9.85<br />
AMG fun for CHCs 16 24.00 7.12 16.88<br />
AMG fund for DH 1 5.00 4.00 1.00<br />
B.1.6 Rogi Kalyan Samitis: RKSs have contributed to local level leadership and need based decision<br />
making. The issues which now need to find a reflection in planning would interalia relate to:<br />
• Constitution of RKS in 100% facilities<br />
• Performance of RKS and pace of utilization of funds<br />
• Activities being under taken by RKS<br />
• Capacity building of RKS members<br />
• Sharing of success stories and best practices.