2.5 GENERATING CAPACITY<br />
The aggregate capacity <strong>of</strong> 4439.25 MW<br />
consisting <strong>95</strong>4.65 MW hydro, 3254.60 MW<br />
thermal and 220 MW nuclear was targeted for<br />
commissioning during the year 1993-94. Against<br />
the targeted capacity, the total<br />
generating capacity commissioned/rolled during the year<br />
1993-94 was 4538.75 MW consisting <strong>of</strong> 797.15 MW<br />
hydro and 3741.60 MW thermal.<br />
Type Programme for 1993-94 Achievement during 1993-94<br />
Cs SS PS Total Cs SS PS Total<br />
Hydro 770 184.65 - <strong>95</strong>4.65 655 142.15 - 797.15<br />
Thermal 1213 1<strong>95</strong>1.60 100 3264.60 1685 1936.60 120 3741.60<br />
Nuclear 220 - - 220.00 - - - -<br />
Total 2203 2136.25 100 4439.25 2340 2078.75 120 4538.75<br />
2.5.1 Generating capacity addition programme<br />
and achievement during <strong>1994</strong>-<strong>95</strong><br />
Based on the status <strong>of</strong> various ongoing<br />
projects a capacity addition programme <strong>of</strong><br />
4818.75 MW consisting <strong>of</strong> 473.25 MW<br />
hydro, 4125.50 MW <strong>of</strong> thermal and 220 MW <strong>of</strong> nuclear<br />
was drawn for the year <strong>1994</strong>-<strong>95</strong>. An aggregate capacity<br />
<strong>of</strong> 1991.5 MW consisting <strong>of</strong> 54.0 MW hydro and 1937.5<br />
MW thermal has been added during <strong>1994</strong>-<strong>95</strong> up to end<br />
December l994.<br />
2.6 CAPACITY ADDITIONS PROGRAMME & ACHIEVEMENT DURING <strong>1994</strong>-<strong>95</strong><br />