2.5 GENERATING CAPACITY<br />

The aggregate capacity <strong>of</strong> 4439.25 MW<br />

consisting <strong>95</strong>4.65 MW hydro, 3254.60 MW<br />

thermal and 220 MW nuclear was targeted for<br />

commissioning during the year 1993-94. Against<br />

the targeted capacity, the total<br />

generating capacity commissioned/rolled during the year<br />

1993-94 was 4538.75 MW consisting <strong>of</strong> 797.15 MW<br />

hydro and 3741.60 MW thermal.<br />

Type Programme for 1993-94 Achievement during 1993-94<br />

Cs SS PS Total Cs SS PS Total<br />

Hydro 770 184.65 - <strong>95</strong>4.65 655 142.15 - 797.15<br />

Thermal 1213 1<strong>95</strong>1.60 100 3264.60 1685 1936.60 120 3741.60<br />

Nuclear 220 - - 220.00 - - - -<br />

Total 2203 2136.25 100 4439.25 2340 2078.75 120 4538.75<br />

2.5.1 Generating capacity addition programme<br />

and achievement during <strong>1994</strong>-<strong>95</strong><br />

Based on the status <strong>of</strong> various ongoing<br />

projects a capacity addition programme <strong>of</strong><br />

4818.75 MW consisting <strong>of</strong> 473.25 MW<br />

hydro, 4125.50 MW <strong>of</strong> thermal and 220 MW <strong>of</strong> nuclear<br />

was drawn for the year <strong>1994</strong>-<strong>95</strong>. An aggregate capacity<br />

<strong>of</strong> 1991.5 MW consisting <strong>of</strong> 54.0 MW hydro and 1937.5<br />

MW thermal has been added during <strong>1994</strong>-<strong>95</strong> up to end<br />

December l994.<br />

2.6 CAPACITY ADDITIONS PROGRAMME & ACHIEVEMENT DURING <strong>1994</strong>-<strong>95</strong><br />