Corporation has disbursed Rs. 259 crores<br />

(Provisional) as loans taking the cumulative<br />

disbursement <strong>of</strong> Rs. 7430 crore upto<br />

November, <strong>1994</strong>.<br />

(v) During the year 1993-94, against the target<br />

<strong>of</strong> electrification <strong>of</strong> 2756 villages and<br />

energisation <strong>of</strong> 232030 pumpsets, 3217<br />

villages were <strong>report</strong>ed electrified and 323429<br />

pumpsets energised. The target <strong>of</strong> pumpsets<br />

was exceeded by 39%. During the year <strong>1994</strong>-<br />

<strong>95</strong> (upto No. ‘<strong>1994</strong>) 1143 villages have been<br />

electrified and 171788 pumpsets (Provisional)<br />

energised.<br />

10.3.1 Kutir Jyoti Programme<br />

(i) The Kutir Jyoti Programme which provides<br />

for release <strong>of</strong> single point light connections<br />

to the households <strong>of</strong> the rural poor below<br />

the poverty line, including Harijan Bastis<br />

and Adivasis families was given a special<br />

thrust. Under this programme during the<br />

year 1993-94, 3.74 lakh single point light<br />

connections were provided with a grant<br />

<strong>of</strong> Rs.12 crore. For the current year <strong>1994</strong>-<strong>95</strong>,<br />

a target for release <strong>of</strong> 1.25 lakh connections<br />

with an outlay <strong>of</strong> Rs. 5.0 crore has been<br />

earmarked. Schemes for release <strong>of</strong> about<br />

A Sub-Station financed by REC for providing stable<br />

supply <strong>of</strong> electricity to rural areas.<br />

45<br />

10,000 connections have already been sanctioned<br />

upto the end <strong>of</strong> November, <strong>1994</strong>.<br />

(ii) The level <strong>of</strong> rural electrification in the country<br />

which stood at 12.8% at the time <strong>of</strong><br />

establishment <strong>of</strong> the Corporation has risen to<br />

85% (approx) at the end <strong>of</strong> March, <strong>1994</strong>.<br />

Similarly the number <strong>of</strong> pumpsets<br />

energisation which stood at 11 lakh at the time<br />

<strong>of</strong> setting up the Corporation has crossed<br />

1 crore mark.<br />

10.3.2 System Improvement Project<br />

(i) Under this programme, REC had, during<br />

1993-94, sanctioned 148 new SI Projects<br />

involving financial outlay <strong>of</strong> Rs. 155 crore and<br />

disbursed Rs. 102 crore. For the year <strong>1994</strong>-<br />

<strong>95</strong> a provision <strong>of</strong> Rs. 145 crore has been made<br />

in the plan outlay during the current year<br />

<strong>1994</strong>-<strong>95</strong>. Eight new projects with a financial<br />

outlay <strong>of</strong> Rs. 17 crore have been sanctioned<br />

upto November, <strong>1994</strong>. With this, total number<br />

<strong>of</strong> Projects sanctioned under the programme<br />

upto November, <strong>1994</strong> has gone upto 1057, and<br />

financial outlay involved is <strong>of</strong> the order <strong>of</strong><br />

Rs. 893 crore and disbursement level has gone<br />

upto Rs. 624 crore.