5. RURAL ELECTRIFICATION<br />

PROGRAMME<br />

(i) During the year <strong>1994</strong>-<strong>95</strong> (upto the end <strong>of</strong><br />

November, <strong>1994</strong>) 1090 inhabited villages<br />

have been declared as electrified and 1,94,177<br />

pumpsets energised against the target <strong>of</strong> 3,708<br />

village electrification and 2,80,119 pumpsets<br />

energisation respectively, for the year as a<br />

whole. It is envisaged that the targets for the<br />

year.,will be achieved during the fourth<br />

quarter <strong>of</strong> the year. Cumulatively, 4,<strong>95</strong>,281<br />

villages have been electrified and 10470221<br />

23<br />

pumpsets/Tubewell have been energised as on<br />

30.11.<strong>1994</strong> in States and Union Territories, as per<br />

details given in the Statements ‘A’ and ’B’.<br />

Out <strong>of</strong> a total <strong>of</strong> 1,11,886 tribal villages in the country,<br />

77,907 villages constituting 69.63% have been<br />

electrified as on 30.9.<strong>1994</strong>. Similarly, 2,61,849<br />

Harijan Bastis have also been electrified so far. The<br />

Kutir Jyoti Scheme was continued during 1993-94 and<br />

<strong>1994</strong>-<strong>95</strong>. The scheme is financed from Central grant<br />

which is routed through Rural Electrification<br />

Corporation.