(ii) Financial<br />

Expenditure upto 3/94 Rs. 382.83 cr.<br />

Outlay <strong>1994</strong>-<strong>95</strong> Rs. 460.97 cr.<br />

Annual Expenditure/release Rs. 54.53 cr.<br />

<strong>1994</strong>-<strong>95</strong> upto 12/94<br />

Total Expenditure upto 12/94 Rs. 437.36 cr.<br />

(iii) Constraints<br />

Out <strong>of</strong> total 46 approved schemes, 21 are being<br />

partly funded by PFC / WB, 5 schemes are<br />

funded from their own resources. The progress<br />

<strong>of</strong> remaining 20 schemes pertaining to HSEB,<br />

UPSEB, BSEB, WBSEB, ASEB, DPL and<br />

DVC is however, very critical because <strong>of</strong><br />

paucity <strong>of</strong> funds.<br />

3.3 Renovation, Modernisation and Uprating <strong>of</strong><br />

Hydro-electric Power Stations<br />

(i) A programme for renovation, modernisation<br />

and uprating (RM&U) <strong>of</strong> Hydro Power<br />

Stations was formulated by Central Electricity<br />

Authority and presently 55 schemes have been<br />

identified under this programme with an<br />

aggregate capacity <strong>of</strong> 9658 MW. On a<br />

preliminary assessment, the programme would<br />

yield a benefit <strong>of</strong> 340 MW by way <strong>of</strong><br />

restoration <strong>of</strong> lost capacity; additional 519 MW<br />

capacity by way <strong>of</strong> uprating and 1337 MW as<br />

19<br />

prevention <strong>of</strong> capacity loss. The Restoration,<br />

Uprating and prevention <strong>of</strong> capacity loss efforts<br />

would yield 6709 million units <strong>of</strong> additional<br />

energy <strong>annual</strong>ly. The estimated cost <strong>of</strong> the<br />

programme is approximately Rs. 1260 crores.<br />

(ii) Out <strong>of</strong> 55 schemes, 32 schemes have already been<br />

cleared by CEA at an estimated cost <strong>of</strong> Rs. 652<br />

crores. The benefits expected after<br />

implementation <strong>of</strong> these Renovation schemes<br />

are 1548 MW and 4050 MU per annum. Out<br />

<strong>of</strong> these 32 schemes, 4 schemes have already<br />

been implemented and balance 28 schemes are<br />

under various stages <strong>of</strong> implementation. Total<br />

estimated cost <strong>of</strong> these 28 schemes is Rs. 635<br />

crores and the benefits expected after<br />

implementation <strong>of</strong> renovation works are 1476<br />

MW and 3679 MU per annum.<br />

(iii) The DPRs for 6 schemes are under processing/<br />

examination in CEA and the DPRs for the<br />

remaining 17 schemes are yet to be received<br />

from the Utilities/SEBs.<br />

(iv) During the year, Desk Review Clearance <strong>of</strong><br />

Sub-Station Equipments <strong>of</strong> Hirakud-(Burla)<br />

H.E. Power Station has been made at an<br />

estimated cost <strong>of</strong> Rs. 9.85 crores.<br />

The country’s largest training simulator at Korba.