(iii) Generation<br />

As on November, <strong>1994</strong> a total capacity <strong>of</strong> 14660<br />

MW was under operation at various NTPC<br />

Stations. This comprises <strong>of</strong> 28 Units <strong>of</strong> 200/210<br />

MW each at Singrauli, Korba, Ramagundam,<br />

Farakka, Vindhyachal, NCTPP, Unchahar &<br />

Kahalgaon, 12 units <strong>of</strong> 500 MW at Singrauli,<br />

Korba, Ramagundam, Rihand and Farakka and<br />

24 Gas/Steam turbine Units <strong>of</strong> various capacities<br />

operating at gas based combined cycle plants at<br />

Anta, Auraiya, Kawas, Dadri and Jhanor<br />

Gandhar Gas Power Projects.<br />

The generation performance <strong>of</strong> NTPC<br />

stations has consistently been at a high<br />

level. Against the target <strong>of</strong> 67500 MUs for<br />

The youngest member <strong>of</strong> the NTPC family<br />

–Jhanor Gandhar Gas Power Project<br />

39<br />

the year <strong>1994</strong>-<strong>95</strong>, till end November, <strong>1994</strong> the<br />

gross generation from NTPC stations was 49057<br />

MUs whereas the pro-rata target for the same<br />

period works out to about <strong>of</strong> 45000 MUs. for<br />

the period April-November, <strong>1994</strong>. The<br />

generation during the previous year (1993-94)<br />

was 76,478 MUs against a target <strong>of</strong> 62,900 MUs<br />

constituting 23.7% <strong>of</strong> the total generation and<br />

31% <strong>of</strong> thermal <strong>power</strong> generation in the country.<br />

Till the end <strong>of</strong> November, <strong>1994</strong>, the coal based<br />

units under commercial operation generated<br />

41,570 MUs at a plant load factor <strong>of</strong> 71.70%.<br />

The following coal based units <strong>of</strong> NTPC<br />

attained a Plant Load Factor (PLF) in excess<br />

<strong>of</strong> 70% during the current year, upto November,<br />

<strong>1994</strong> :<br />

Sl. Station Capacity Unit PLF<br />

No. MW No. (%)<br />

1. Singrauli 200 1 84.33<br />

2. Singrauli 200 2 72.99<br />

3. Singrauli 200 3 81.27<br />

4. Singrauli 500 5 84.29<br />

5. Singrauli 500 6 84.25<br />

6. Korba 200 1 81.64<br />

7. Korba 200 2 75.41<br />

8. Korba 500 4 88.13<br />

9. Korba 500 5 74.69<br />

10. Korba 500 6 79.10<br />

11. Ramagundam 200 3 77.09<br />

12. Ramagundam 500 4 74.34<br />

13. Ramagundam 500 6 74.28<br />

14. Farakka 200 1 84.56<br />

15. Farakka 200 2 77.52<br />

16. Rihand 500 1 71.54<br />

17. Vindhyachal 210 1 74.60<br />

18. Vindhyachal 210 2 71.52<br />

19. Vindhyachal 210 3 71.54<br />

20. Vindhyachal 210 4 87.57<br />

21. Vindhyachal 210 6 83.96