(iii) Generation<br />
As on November, <strong>1994</strong> a total capacity <strong>of</strong> 14660<br />
MW was under operation at various NTPC<br />
Stations. This comprises <strong>of</strong> 28 Units <strong>of</strong> 200/210<br />
MW each at Singrauli, Korba, Ramagundam,<br />
Farakka, Vindhyachal, NCTPP, Unchahar &<br />
Kahalgaon, 12 units <strong>of</strong> 500 MW at Singrauli,<br />
Korba, Ramagundam, Rihand and Farakka and<br />
24 Gas/Steam turbine Units <strong>of</strong> various capacities<br />
operating at gas based combined cycle plants at<br />
Anta, Auraiya, Kawas, Dadri and Jhanor<br />
Gandhar Gas Power Projects.<br />
The generation performance <strong>of</strong> NTPC<br />
stations has consistently been at a high<br />
level. Against the target <strong>of</strong> 67500 MUs for<br />
The youngest member <strong>of</strong> the NTPC family<br />
–Jhanor Gandhar Gas Power Project<br />
39<br />
the year <strong>1994</strong>-<strong>95</strong>, till end November, <strong>1994</strong> the<br />
gross generation from NTPC stations was 49057<br />
MUs whereas the pro-rata target for the same<br />
period works out to about <strong>of</strong> 45000 MUs. for<br />
the period April-November, <strong>1994</strong>. The<br />
generation during the previous year (1993-94)<br />
was 76,478 MUs against a target <strong>of</strong> 62,900 MUs<br />
constituting 23.7% <strong>of</strong> the total generation and<br />
31% <strong>of</strong> thermal <strong>power</strong> generation in the country.<br />
Till the end <strong>of</strong> November, <strong>1994</strong>, the coal based<br />
units under commercial operation generated<br />
41,570 MUs at a plant load factor <strong>of</strong> 71.70%.<br />
The following coal based units <strong>of</strong> NTPC<br />
attained a Plant Load Factor (PLF) in excess<br />
<strong>of</strong> 70% during the current year, upto November,<br />
<strong>1994</strong> :<br />
Sl. Station Capacity Unit PLF<br />
No. MW No. (%)<br />
1. Singrauli 200 1 84.33<br />
2. Singrauli 200 2 72.99<br />
3. Singrauli 200 3 81.27<br />
4. Singrauli 500 5 84.29<br />
5. Singrauli 500 6 84.25<br />
6. Korba 200 1 81.64<br />
7. Korba 200 2 75.41<br />
8. Korba 500 4 88.13<br />
9. Korba 500 5 74.69<br />
10. Korba 500 6 79.10<br />
11. Ramagundam 200 3 77.09<br />
12. Ramagundam 500 4 74.34<br />
13. Ramagundam 500 6 74.28<br />
14. Farakka 200 1 84.56<br />
15. Farakka 200 2 77.52<br />
16. Rihand 500 1 71.54<br />
17. Vindhyachal 210 1 74.60<br />
18. Vindhyachal 210 2 71.52<br />
19. Vindhyachal 210 3 71.54<br />
20. Vindhyachal 210 4 87.57<br />
21. Vindhyachal 210 6 83.96