(3) Salal (Stage-II) (3x115MW) J & K<br />

Two <strong>of</strong> the three units <strong>of</strong> the Project had been<br />

synchronised by March, ’94. The third unit<br />

has been rolled successfully on 24.01.<strong>95</strong> and<br />

is likely to be synchronised/ commissioned<br />

during February 19<strong>95</strong>. Work on the<br />

construction <strong>of</strong> the Tail Race Tunnel II has been<br />

under progress and in all about <strong>95</strong>% heading,<br />

66% benching, 54% overt concreting and 41%<br />

grouting has been completed out <strong>of</strong> a total length<br />

<strong>of</strong> 2.504 kms.<br />

(4) Rangit HE Project (3 x 20MW) Sikkim<br />

During the year 1993-94 work on the Rangit HE<br />

project in Sikkim has been in progress. A<br />

cumulative boring <strong>of</strong> 581 M (19.4) has been done<br />

in Head Race Tunnel till Nov.’94 out <strong>of</strong> a total<br />

length <strong>of</strong> 3 Kms. Excavation <strong>of</strong> surge shaft has<br />

been completed and that <strong>of</strong> pressure shaft is in<br />

progress. Excavation <strong>of</strong> Power House Pit has<br />

been completed and concreting is in progress.<br />

Necessary action has also been taken by NHPC<br />

to resolve the contractual problems that had<br />

arisen in regard to major civil works.<br />

43<br />

10.2.2 New Schemes <strong>of</strong> NHPC<br />

(i) Dhauliganga HE Project (Stage-I)<br />

(4 x 70MW) U.P.<br />

Work on the project could not be commenced<br />

during 1993-94 due to paucity <strong>of</strong> funds.<br />

Presently, the land acquisition is being<br />

processed with the concerned authorities.<br />

Work on improvement <strong>of</strong> Tanakpur-Tawaghat<br />

Road is expected to start shortly.<br />

Infrastructure work like temporary<br />

(ii)<br />

accommodation and access roads at various<br />

project sites is also being taken up. Japanese<br />

(OECF) financial assistance for the project is<br />

being explored.<br />

Chamera HE Project (Stage-II)<br />

(3 x 100MW) H.P.<br />

Work on most <strong>of</strong> the approach roads,<br />

widening <strong>of</strong> Chamba - Kharamukh road,<br />

erection <strong>of</strong> workshop sheds and explosives<br />

magazine has been completed. Development<br />

work for construction <strong>of</strong> residential buildings<br />

at Karian has also been completed.