(3) Salal (Stage-II) (3x115MW) J & K<br />
Two <strong>of</strong> the three units <strong>of</strong> the Project had been<br />
synchronised by March, ’94. The third unit<br />
has been rolled successfully on 24.01.<strong>95</strong> and<br />
is likely to be synchronised/ commissioned<br />
during February 19<strong>95</strong>. Work on the<br />
construction <strong>of</strong> the Tail Race Tunnel II has been<br />
under progress and in all about <strong>95</strong>% heading,<br />
66% benching, 54% overt concreting and 41%<br />
grouting has been completed out <strong>of</strong> a total length<br />
<strong>of</strong> 2.504 kms.<br />
(4) Rangit HE Project (3 x 20MW) Sikkim<br />
During the year 1993-94 work on the Rangit HE<br />
project in Sikkim has been in progress. A<br />
cumulative boring <strong>of</strong> 581 M (19.4) has been done<br />
in Head Race Tunnel till Nov.’94 out <strong>of</strong> a total<br />
length <strong>of</strong> 3 Kms. Excavation <strong>of</strong> surge shaft has<br />
been completed and that <strong>of</strong> pressure shaft is in<br />
progress. Excavation <strong>of</strong> Power House Pit has<br />
been completed and concreting is in progress.<br />
Necessary action has also been taken by NHPC<br />
to resolve the contractual problems that had<br />
arisen in regard to major civil works.<br />
43<br />
10.2.2 New Schemes <strong>of</strong> NHPC<br />
(i) Dhauliganga HE Project (Stage-I)<br />
(4 x 70MW) U.P.<br />
Work on the project could not be commenced<br />
during 1993-94 due to paucity <strong>of</strong> funds.<br />
Presently, the land acquisition is being<br />
processed with the concerned authorities.<br />
Work on improvement <strong>of</strong> Tanakpur-Tawaghat<br />
Road is expected to start shortly.<br />
Infrastructure work like temporary<br />
(ii)<br />
accommodation and access roads at various<br />
project sites is also being taken up. Japanese<br />
(OECF) financial assistance for the project is<br />
being explored.<br />
Chamera HE Project (Stage-II)<br />
(3 x 100MW) H.P.<br />
Work on most <strong>of</strong> the approach roads,<br />
widening <strong>of</strong> Chamba - Kharamukh road,<br />
erection <strong>of</strong> workshop sheds and explosives<br />
magazine has been completed. Development<br />
work for construction <strong>of</strong> residential buildings<br />
at Karian has also been completed.