10.4 THE NORTH EASTERN ELECTRIC<br />

POWER CORPORATION LTD.<br />

(NEEPCO)<br />

The North Eastern Electric Power<br />

Corporation Ltd. (NEEPCO) was constituted<br />

in 1976 under the Company’s Act 1<strong>95</strong>6 with<br />

the objective <strong>of</strong> developing the large <strong>power</strong><br />

potential <strong>of</strong> the North Eastern Region <strong>of</strong> the<br />

country.<br />

10.4.1 Mission<br />

To harness the <strong>power</strong> potential <strong>of</strong> the North<br />

Eastern Region through planned development<br />

<strong>of</strong> <strong>power</strong> generation projects.<br />

10.4.2 Objectives<br />

(i) In consonance with the Corporation’s mission<br />

and directives issued by the Government from<br />

time to time, the Corporation’s objectives are<br />

as follows :<br />

1. To add to the <strong>power</strong> generating capacity<br />

in the North Eastern Region by<br />

installing hydro and thermal <strong>power</strong><br />

plants within optimum time schedule<br />

and cost.<br />

2. To ensure optimum utilization <strong>of</strong><br />

commissioned Generation Projects so<br />

as to achieve targets projected<br />

exceeding the designed capacity based<br />

on the availability <strong>of</strong> water.<br />

3. To generate adequate internal resources<br />

by ensuring justifiable return on<br />

investment and to continue sustained<br />

efforts to obtain the receivables from<br />

State Electricity Boards/Departments.<br />

4. To undertake long term feasibility<br />

studies for optimum development <strong>of</strong><br />

hydro <strong>power</strong> resources <strong>of</strong> river basins<br />

in North Region with a view to improving<br />

the share <strong>of</strong> hydro in country’s <strong>power</strong>mix.<br />

47<br />

(ii) Out <strong>of</strong> a total installed capacity <strong>of</strong> 1141 MW in<br />

the Region, NEEPCO is contributing 150 MW<br />

through its Kopili Hydro Electric Projects under<br />

O & M. Inspite <strong>of</strong> having only 15% <strong>of</strong> the total<br />

installed capacity in the region the Corporation<br />

has been able to meet more than 30% <strong>of</strong> the<br />

peak demand/ energy needs <strong>of</strong> the region. The<br />

Corporation proposes a capacity addition <strong>of</strong> 635<br />

MW within the 8th Five Year Plan in a phased<br />

manner through its projects under execution and<br />

another 320 MW in the beginning <strong>of</strong> the 9th Five<br />

Year Plan as indicated below:<br />

Year Name <strong>of</strong> Projects Capacity<br />

Addition (MW)<br />

<strong>1994</strong>-<strong>95</strong> Assam Gas Based<br />

Power Project 130<br />

Kathalguri (4 G.T. Units)<br />

19<strong>95</strong>-96 Assam Gas Based<br />

Power Project 161<br />

Kathalguri (2 G.T. Units +<br />

3 S.T. Units)<br />

Kopili H.E. Project Ist Stage 100<br />

Extension (2x50 MW)<br />

Agartala G.T. (4x2lMW) 84<br />

1996-97 Doyang H.E. Project (lx25MW) 25<br />

Ranganadi<br />

H.E. Project (lxl35MW) 135<br />

1997-98 Doyang H.E. Project (2x25MW) 50<br />

Ranganadi<br />

H.E. Project (2xl35MW) 270<br />

10.4.3. Projects Under Operation and<br />

Maintenance (Completed)<br />

(i) Kopili Hydro Electric Project (150MW)<br />

Assam<br />

This Project, having an installed capacity <strong>of</strong><br />

150MW, is located in N.C. Hills District