10.4 THE NORTH EASTERN ELECTRIC<br />
POWER CORPORATION LTD.<br />
(NEEPCO)<br />
The North Eastern Electric Power<br />
Corporation Ltd. (NEEPCO) was constituted<br />
in 1976 under the Company’s Act 1<strong>95</strong>6 with<br />
the objective <strong>of</strong> developing the large <strong>power</strong><br />
potential <strong>of</strong> the North Eastern Region <strong>of</strong> the<br />
country.<br />
10.4.1 Mission<br />
To harness the <strong>power</strong> potential <strong>of</strong> the North<br />
Eastern Region through planned development<br />
<strong>of</strong> <strong>power</strong> generation projects.<br />
10.4.2 Objectives<br />
(i) In consonance with the Corporation’s mission<br />
and directives issued by the Government from<br />
time to time, the Corporation’s objectives are<br />
as follows :<br />
1. To add to the <strong>power</strong> generating capacity<br />
in the North Eastern Region by<br />
installing hydro and thermal <strong>power</strong><br />
plants within optimum time schedule<br />
and cost.<br />
2. To ensure optimum utilization <strong>of</strong><br />
commissioned Generation Projects so<br />
as to achieve targets projected<br />
exceeding the designed capacity based<br />
on the availability <strong>of</strong> water.<br />
3. To generate adequate internal resources<br />
by ensuring justifiable return on<br />
investment and to continue sustained<br />
efforts to obtain the receivables from<br />
State Electricity Boards/Departments.<br />
4. To undertake long term feasibility<br />
studies for optimum development <strong>of</strong><br />
hydro <strong>power</strong> resources <strong>of</strong> river basins<br />
in North Region with a view to improving<br />
the share <strong>of</strong> hydro in country’s <strong>power</strong>mix.<br />
47<br />
(ii) Out <strong>of</strong> a total installed capacity <strong>of</strong> 1141 MW in<br />
the Region, NEEPCO is contributing 150 MW<br />
through its Kopili Hydro Electric Projects under<br />
O & M. Inspite <strong>of</strong> having only 15% <strong>of</strong> the total<br />
installed capacity in the region the Corporation<br />
has been able to meet more than 30% <strong>of</strong> the<br />
peak demand/ energy needs <strong>of</strong> the region. The<br />
Corporation proposes a capacity addition <strong>of</strong> 635<br />
MW within the 8th Five Year Plan in a phased<br />
manner through its projects under execution and<br />
another 320 MW in the beginning <strong>of</strong> the 9th Five<br />
Year Plan as indicated below:<br />
Year Name <strong>of</strong> Projects Capacity<br />
Addition (MW)<br />
<strong>1994</strong>-<strong>95</strong> Assam Gas Based<br />
Power Project 130<br />
Kathalguri (4 G.T. Units)<br />
19<strong>95</strong>-96 Assam Gas Based<br />
Power Project 161<br />
Kathalguri (2 G.T. Units +<br />
3 S.T. Units)<br />
Kopili H.E. Project Ist Stage 100<br />
Extension (2x50 MW)<br />
Agartala G.T. (4x2lMW) 84<br />
1996-97 Doyang H.E. Project (lx25MW) 25<br />
Ranganadi<br />
H.E. Project (lxl35MW) 135<br />
1997-98 Doyang H.E. Project (2x25MW) 50<br />
Ranganadi<br />
H.E. Project (2xl35MW) 270<br />
10.4.3. Projects Under Operation and<br />
Maintenance (Completed)<br />
(i) Kopili Hydro Electric Project (150MW)<br />
Assam<br />
This Project, having an installed capacity <strong>of</strong><br />
150MW, is located in N.C. Hills District